Sai Manas
By Sai Smaran infra and Developers
RG-MH-25813 · RERA P52000008081 · Last updated on MahaRERA portal: 26 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 90 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sai Manas is a Residential / Group Housing project by Sai Smaran infra and Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000008081 on 18 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 90 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameSai Manas
- TypeResidential / Group Housing
- Location
- Pashane Road
- Pashane
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000008081
- ReraGenie IDRG-MH-25813
Builder
- NameSai Smaran infra and Developers
- Entity typePartnership
- PartnerAmalan M Sinha
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Aug 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sai Manas | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.
Sai Manas: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 26 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 5% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 0% |
Parking filed56
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Raghuvansh Mathur |
| Engineer | Suyog Tikle |
| Partner | Role in project |
|---|---|
| Sai Smaran infra and Developers | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterHello Our building SAI MANAS is being built on Pashane , Taluka karjat. We had received NA order for Ground Plus two floors, then we received second order for two more floors via order number LNA-(B)/P.N/149/2016 dated 31st August 2018. Right now the status of the building 1. Ground plus two floors RCC complete 3rd floor slab of Wing A and B complete , c is left. 2. Brick work for Ground Plus two floors complete 3. Internal Electrical Piping Ground Plus two floors complete 4. Window Tile framing for Ground Plus two floors complete 5. Bathroom water proofing for Bathroom and WC complete for Gro
Reason as filed by the promoterHello Our Building Sai Manas is being built in Pashane, Taluka Karjat. We had first received the NA order for Ground plus two Floors. We had initially given a estimate date of completion to Maha Rera as December 31st, 2018. Right now the Status of the Building 1. RCC constructions of Plinth, 1st slab and 2nd slab done, 3rd slab (that is the last Floor of the Ground plus two Floors) is being constructed and we are going to complete that by Jan 2nd week. 2. Brick work for the Ground Floor is completed; Electricity piping and Window tile work is going on, with simultaneous wall Plaster is going o
Reason as filed by the promoterHello Dear sir/ Madam Sai Manas rera number expired on February 2022. We would like to request for the extension for rera for one more year. The following reason and status is mentioned below for your perusal. 1. We have enclosed 52% customers signature approval for extension request. 2. Even though we have already put last slab of c wing and we are almost ready to put last slab for A wing. As proof we are putting the pictures for your reference. 3. We have also received approval from the bank that they are going to start releasing the funds and we should be able to complete the project and de
Reason as filed by the promoterWe are uploading Form 40 and the relevant details ...The reason for delay is as under The Project was delayed for several reasons 1. First we had order to build Ground plus two floors 2. Then in after couple of years we got order to build 2 more floors 3. Pandemic affecting the whole country and we could not do any work and the Contractors left the project 4. The customers delayed payment to the bank and in turn the bank did not pay us. 5. There was in between shortage of Sand and it was difficult to get Reti. The need for extension is now , the Land owner has several flats that he is ready to
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000303042 | Satishkumar Madhuraprasad Parauha | Sai Smaran Infra and developers | 16/10/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Form B may 26_2025.pdf | 26 May 2025 |
| Declaration in FORM BFile: FORM B original SSID.pdf | 18 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 _2023-2024_CA uttam.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold statement 2024.pdf | 18 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Fy 2023-24_CAuttam.pdf | 18 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 upto 2024 for ext for visha.pdf | 30 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-2023 for upload copy.pdf | 30 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2021-2023 for upload copy.pdf | 30 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-2024 for upload copy.pdf | 30 Mar 2025 |
| Declaration in FORM BFile: Form B by vishwanath Notarized on Stamp paper.pdf | 17 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I architect certificate _vishwanath _ March 16_2025.pdf | 17 Mar 2025 |
| Certificates of CA (Form 3)File: FORM 3 2023-2024 NO WORK.pdf | 17 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold statement of 2025 pdf.pdf | 17 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-2024 NO WORK.pdf | 17 Mar 2025 |
| Other - LegalFile: reconstitution for Sai Smaran Dec 26_2024 compressed.pdf | 13 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -Sagar Kokne.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 -Sagar Kokne.pdf | 21 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_2021.pdf | 7 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_22.pdf | 7 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 7 Apr 2023 |
| Details of encumbrancesFile: certificate of encumbrance.pdf | 4 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-unsold Flat details.pdf | 30 Jun 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200240289971.pdf | 24 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: form 3 -CA.pdf | 15 Jun 2022 |
| Declaration about Commencement CertificateFile: Declaration of CC.pdf | 7 Jun 2022 |
| CERSAI detailsFile: Certificate no encumberance.pdf | 7 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-FY 19-20.pdf | 6 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-FY 20-21.pdf | 6 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5-FY 2018-20.pdf | 6 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-FY 2018-20.pdf | 6 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-FY 2020-21.pdf | 6 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 engineer cert_uploaded_May23_22_compressed.pdf | 23 May 2022 |
| Certificates of CA (Form 3)File: form 3 maharera_uploaded_May 23-22-Sagar kokne_compressed.pdf | 23 May 2022 |
| Building plan approvalFile: sai manas second approval design_aug2021_compressed_final.pdf | 10 Aug 2021 |
| Building Plan Approval (IOD)File: sai manas second approval design_aug2021_compressed_final.pdf | 10 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: NA order Sai manas second approval_aug2021_compressed.pdf | 9 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: sold unsold certified statement uploaded on June 02_2021.pdf | 2 Jun 2021 |
| Certificates of CA (Form 3)File: Form 3_sagark_Dec 27_uploaded.pdf | 27 Dec 2018 |
| Certificates of CA (Form 5)File: FORM 5_dec 27_sagar K_uploaded.pdf | 27 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate_Nov 30_2018.pdf | 29 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate_mathur_nov30_2018.pdf | 27 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mathur saab certificate Form 1_aug 2018.pdf | 11 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate _aug 2018.pdf | 11 Oct 2018 |
| Certificates of CA (Form 3)File: chetan Joshi accountant_aug 2018.pdf | 11 Oct 2018 |
| Certificates of CA (Form 3)File: chetan Joshi accountant_aug 2018.pdf | 11 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: N A Order 2_latest.pdf | 24 Mar 2018 |
| Building plan approvalFile: Layout No 2_latest.pdf | 31 Jul 2017 |
| Layout approvalFile: Layout No 1_latest.pdf | 31 Jul 2017 |
| PAN CardFile: sai smaran Pan for RERA.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: N A Order 2_latest.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: N A Order 1-1_latest.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Certificate of encumberance_latest.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout No 1_latest.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Layout No 2_latest.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Declaration of Form B_latest.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mathur_architect certificate_ Latest.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Structural Engineer form_Latest.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 Chartered account _Latest.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: RERA AGREEMENT FOR SALE VANGANI_latest.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Sai Manas on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pashane5,900+ in Raigarh
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: Sai Smaran infra and Developers
Sai Smaran infra and Developers has 2 registrations on MahaRERA, including Sai Manas and SATYANATH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Sai Manas shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Sai Manas is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sai Manas?
The registered promoter entity is Sai Smaran infra and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sai Manas?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sai Manas?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Sai Manas?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sai Manas?
The professionals named in the filing: Architect: Raghuvansh Mathur; Engineer: Suyog Tikle. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sai Manas?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback