Home / Browse projects / Raigarh, Maharashtra / SAI GARDENS
SAI GARDENS
RG-MH-42470 · RERA P52000005728 · Last updated on MahaRERA portal: 13 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 142 months past the filed date
- Litigation declared, 3 cases
- 1 extension taken
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI GARDENS is a Residential / Group Housing project by REKHA SUBHASH JAGDALE in Raigarh, Maharashtra, registered with MahaRERA as P52000005728 on 11 Aug 2017. Possession was promised by 1 Dec 2014 and is now 142 months past that date. 29 of the 104 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSAI GARDENS
- TypeResidential / Group Housing
- Location
- Veer Savarkar Marg
- Udhyam Nagar
- Karjat
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000005728
- ReraGenie IDRG-MH-42470
Builder
- NameREKHA SUBHASH JAGDALE
- Entity typeIndividual
- GSTIN27AAIPJ1460B1Z6
- Other registrations2 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Aug 2017
- Promised completion1 Dec 2014
- Revised completionRevised to 1 Dec 2014 (originally 28 Aug 2022)
- Buildings1 building record
- Documents filed88 files
Current status
Figures as on 13 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Maruti Galaxy | NA | 5 | 5 | 104 | 0 | 104 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
Maruti Galaxy: 84% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 84% |
| Sanitary Fittings within the flats / premises | 83% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 84% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 73% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 85% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Kishor Babu Asawale | Khopoli | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Maruti Galaxy | NA | Rs 7.78 cr | Rs 4.90 cr |
| - | NA | Rs 83.34 lakh | Rs 69.85 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Satish Manohar |
| Engineer | Yateesh Tare |
| Chartered Accountant | A T Upadhye & Co |
| Chartered Accountant | Ashok T Upadhye |
| Partner | Role in project |
|---|---|
| REKHA SUBHASH JAGDALE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe construction work is substantially suffered and delayed due to Legal case filed by Mr. Kishor Asawale, the owner of the Project land under Development Agreement and thereafter due to COVID 19 Lockdown. Hence the extension is required to complete the balance work of the B, D & E wing buildings which are being under construction as per existing approved plan and are nearing completion. The construction of remaining F & G wing is proposed to be commenced on approval of revised and amendment drawings by taking the benefit of additional FSI available to the project land. The proposed revised an
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 331/2016/2016 | Panvel Civil Court | Court Order passed for Withdrawal of Suit |
| 73/2015/2015 | Karjat Civil Court | Returned to submit before proper court |
| 331/2016/2016 | Panvel Civil Court | Court Order passed for Withdrawal of Suit |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Mar 2024
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Sai Gardens 30 June 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Sai Gardens 30 June 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Sai Gardens 30 June 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Sai Gardens 30 Sept 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Sai Gardens 31 Dec 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Gardens 30 June 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Gardens 30 June 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Gardens 30 June 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Gardens 30 Sept 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Gardens 31 Dec 25.pdf | 13 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Gardens 30 June 25 signed.pdf | 13 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Gardens 30 June 25 signed.pdf | 13 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Gardens 30 June 25 signed.pdf | 13 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Gardens 30 Sept 25 Signed.pdf | 13 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Gardens 31 Dec 25 Signed.pdf | 13 Jun 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Archt Cert 31 March 2025.pdf | 14 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 31 March 2025.pdf | 14 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert Sai Gardens 31 Dec 2024.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Sai Garden 31 December 2024.pdf | 21 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert Sai Gardens 31 Dec 2024.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sai Gardens 31 March 2024.pdf | 21 Feb 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A June 24 format declaration Sai Gardens.pdf | 11 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: UBI RERA Bank Accounts Opening Letter.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sai Gardens March 2024 Compressed.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Gardens March 2024 Compressed.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Cert Sai Gardens 31 March 24 Compressed.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Sai Gardens March 2024.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sai Gardens March 2024.pdf | 13 Aug 2024 |
| Declaration about Commencement CertificateFile: Commencement Certificate Declaration Format D.pdf | 10 Mar 2024 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 10 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Other Project Declaration.pdf | 10 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Karjat Project Part OC.pdf | 10 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A Notorized Declaration Bank Account Change.pdf | 10 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert 31 Jan 2024 Sai Gardens.pdf | 1 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Structural Engr Cert 31 Jan 2024 Sai Gardens.pdf | 1 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory Sai Gardens 31 Jan 2024.pdf | 1 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Sai Garden 31 Jan 2024 compressed.pdf | 1 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration Separate Bank Account.pdf | 1 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rationale for Bank Account Change Declaration.pdf | 1 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Revised CA Cert Sai Gardens 31 March 2023.pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Cert Sai Gardens 31 March 2023.pdf | 5 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Cert 2023 Sai Gardens.pdf | 30 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert 2023 Sai Gardens.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Sai Gardens 2020.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sai Gardens 2021.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Sai Gardens 2022.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sai Gardens 2023.pdf | 30 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate 2023 Sai Gardens.pdf | 30 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA Certificate FY ended 31 March 2022.pdf | 5 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal Declaration.pdf | 2 Oct 2022 |
| Declaration about Commencement CertificateFile: Format D Commencement Cert Declaration.pdf | 2 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory List.pdf | 2 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sai Gardens Form 5 CA Cert 2019-20.pdf | 8 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sai Gardens Form 5 CA Cert 2020-21.pdf | 8 Aug 2022 |
| Certificates of CA (Form 3)File: Form 3 Revised MG March 2017.pdf | 3 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 CA Certificate MG 31 March 2018.pdf | 3 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CA Certificate MG 31 March 2018.pdf | 3 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CA Certificate MG 31 March 2019.pdf | 3 Dec 2019 |
| Layout approvalFile: MG approved Drawing 1.pdf | 29 Jul 2017 |
| Building plan approvalFile: MG approved Drawing 3.PDF | 29 Jul 2017 |
| Building plan approvalFile: MG approved Drawing 1.pdf | 29 Jul 2017 |
| Building plan approvalFile: MG approved Drawing 2.PDF | 29 Jul 2017 |
| PAN CardFile: Rekha Jagdale PAN Card.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Report.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Encumbrance_Declaration.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: MG approved Drawing 1.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: MG approved Drawing 1.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: MG approved Drawing 2.PDF | 29 Jul 2017 |
| Building Plan Approval (IOD)File: MG approved Drawing 3.PDF | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Karjat Nagar Parishad CC.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: MG Declaration Form B.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MG Architect Certificate.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MG Engineers Certificate.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: ca certi.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: MG Allotment Letter format.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: MG_Draft_Agreement_for_Sale.pdf | 29 Jul 2017 |
| OtherFile: Karjat Nagar Parishad Cancellation letter.pdf | 29 Jul 2017 |
| OtherFile: Karjat Court Case_Part1.pdf | 29 Jul 2017 |
| OtherFile: Karjat Court Case_Part2.pdf | 29 Jul 2017 |
| OtherFile: Karjat_Court_Order.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAI GARDENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udhyam Nagar, Karjat5,900+ in Raigarh
Filed coordinates, straight-line distance. 151 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: REKHA SUBHASH JAGDALE
REKHA SUBHASH JAGDALE has 3 registrations on MahaRERA, including SAI GREENS and SAI GARDENS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that SAI GARDENS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAI GARDENS is delayed beyond 1 Dec 2014?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI GARDENS?
The registered promoter entity is REKHA SUBHASH JAGDALE, an individual as per the filing. Its GSTIN 27AAIPJ1460B1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI GARDENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI GARDENS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI GARDENS?
The professionals named in the filing: Architect: Satish Manohar; Engineer: Yateesh Tare; Chartered Accountant: A T Upadhye & Co; Chartered Accountant: Ashok T Upadhye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI GARDENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback