ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SAI DEEP

Registration lapsed No litigation declared Residential / Group Housing project

SAI DEEP

By K T CONSTRUCTION

RG-MH-78873 · RERA P52000049061 · Last updated on MahaRERA portal: 7 Aug 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 13 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 92%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

SAI DEEP is a Residential / Group Housing project by K T CONSTRUCTION in Raigarh, Maharashtra, registered with MahaRERA as P52000049061 on 30 Jan 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 13 months from the original filing.

At a glance

Project

  • NameSAI DEEP
  • TypeResidential / Group Housing
  • Location
    • SECTOR 6A
    • KAMOTHE
    • Panvel
    • Raigarh
    • 410209
  • Pincode410209
  • RERA no.P52000049061
  • ReraGenie IDRG-MH-78873

Builder

  • NameK T CONSTRUCTION
  • Entity typePartnership
  • PartnersSEEMA YASHWANT SINGH, RONAK ASHOKKUMAR CHAWLA

Key dates

10 months past promisethis monthRegisteredJan 2023First promiseNov 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on30 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 26 Nov 2024)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI DEEPNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 92%.

SAI DEEP: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 7 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered1
Open Space8

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area200 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI261.43
Proposed, not sanctioned261 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP 7 TO 10 SHREE SHRADHA AVENUE PLOT NO 65 SECTOR 20 KAMOTHE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTUYOG ARCHITECTS
EngineerAGHARKAR CONSULTANTS
Chartered AccountantKEYUR BHAYANI & ASSOCIATES
PartnerRole in project
K T CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000025179Nov 2024 → Dec 2025

Reason as filed by the promoterWORK IS NOT YET COMPLETED 100 PERCENT

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form_1_11zon.pdf7 Aug 2025
Form 2File: FORM_-2_11zon.pdf7 Aug 2025
Form 3File: FORM_-3_scan.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: FORM_-3_scan.pdf7 Aug 2025
Form 1File: ARCHITECT CERTIFICATE.pdf7 Aug 2025
Form 2File: ENGINEER CERTIFICATE.pdf7 Aug 2025
Form 3File: FORM3 CA CERTIFICATE.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: FORM3 CA CERTIFICATE.pdf7 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT___FORM-1_compressed.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KT_____form-2_compressed.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1_11zon.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1_11zon.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_-3_scan.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_-2_11zon.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form_-2a.pdf6 Dec 2024
Declaration in FORM BFile: AFFIDAVIT.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 CA CERTIFICATE.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_-1_compressed.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_-2_compressed.pdf25 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 MAR 24.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 JUNE24.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 SEPT 24.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AS ON SEPT 2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AS ON JUNE 2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AS ON MAR 2024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2MAR 24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 JUNE 24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 SEPT 24.pdf15 Oct 2024
Layout approvalFile: REVISED PLAN_compressed.pdf4 Mar 2024
Building plan approvalFile: REVISED PLAN_compressed.pdf4 Mar 2024
Copy of Layout Approval (in case of layout)File: REVISED PLAN_compressed.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN_compressed.pdf4 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PLOT_60_FORM_1.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer_cer_-june_23.pdf11 Aug 2023
Details of encumbrances concerned to FinanceFile: self_declaration-KT__.pdf17 Jan 2023
Details of encumbrances concerned to LegalFile: self_declaration-KT__.pdf17 Jan 2023
Declaration about Commencement CertificateFile: DECLARATION OFCC.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED CA CERTIFICATE.pdf13 Jan 2023
Details of encumbrances concerned to FinanceFile: SELF_DECLARATION-KT.pdf6 Jan 2023
Details of encumbrances concerned to LegalFile: SELF_DECLARATION-KT.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE_OF_INT_IN_OTHER_REAL_ESTATE_ORG-1.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE_OF_INT_IN_OTHER_REAL_ESTATE_ORG-2.pdf6 Jan 2023
Proforma of Agreement for saleFile: AGREEMENT_FOR_SALE-1-8_compressed.pdf19 Dec 2022
Proforma of Agreement for saleFile: AGREEMENT_FOR_SALE_-9-16_compressed (1).pdf19 Dec 2022
Proforma of Agreement for saleFile: AGREEMENT_FOR_SALE-_17-25_compressed.pdf19 Dec 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION_REPORT_-Agreement_for_sale_compressed (1).pdf19 Dec 2022
Copy of the legal title reportFile: SEARCH_REPORT-KT_compressed.pdf9 Dec 2022
Copy of the legal title reportFile: TITLE_CLEARANCE_CERTIFICATE-KT_compressed.pdf9 Dec 2022
Proforma of Allotment letterFile: ALLOTMENT_LETTER-KT_compressed.pdf9 Dec 2022
Deviation Report with respect to Allotment letterFile: DEVIATION_REPORT-Allotment_letter.pdf9 Dec 2022
Layout approvalFile: BLDG PLAN_SCAN-KT.PDF6 Dec 2022
Copy of Layout Approval (in case of layout)File: BLDG PLAN_SCAN-KT.PDF6 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: KT CONSTRUCTION.pdf6 Dec 2022
Declaration in FORM BFile: B FORM 1.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT certificate.pdf6 Dec 2022
CERSAI detailsFile: CERSAI REPORT.pdf6 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf6 Dec 2022
Building plan approvalFile: BLDG PLAN_SCAN-KT.PDF5 Dec 2022
PAN CardFile: KT const pan card.pdf5 Dec 2022
Copy of the legal title reportFile: LEGAL_TITLE_REPORT-KT_compressed.pdf5 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN_SCAN-KT.PDF5 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER_S_CERTIFICATE_-KT_compressed.pdf5 Dec 2022

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 13 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI DEEP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMOTHE5,900+ in Raigarh

Builder: K T CONSTRUCTION

K T CONSTRUCTION has 1 registration on MahaRERA, including SAI DEEP. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that SAI DEEP shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAI DEEP is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI DEEP?

The registered promoter entity is K T CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI DEEP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI DEEP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI DEEP?

The professionals named in the filing: Architect: VASTUYOG ARCHITECTS; Engineer: AGHARKAR CONSULTANTS; Chartered Accountant: KEYUR BHAYANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI DEEP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI DEEP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI DEEP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.