SAI CREST

By SAI SHRISHTI BUILDERS AND DEVELOPERS

RG-MH-23336 · RERA P52000078644 · Last updated on MahaRERA portal: 23 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 70%
44 of 50Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

SAI CREST is a Others project by SAI SHRISHTI BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000078644 on 30 Dec 2024. Possession is promised by 30 Jun 2028. 6 of the 50 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI CREST
  • TypeOthers
  • Location
    • PLOT NO 20 SECTOR 35 KAMOTHE
    • Kamothe
    • Panvel
    • Raigarh
    • 410209
  • Pincode410209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000078644
  • ReraGenie IDRG-MH-23336

Builder

  • NameSAI SHRISHTI BUILDERS AND DEVELOPERS
  • Entity typePartnership

Key dates

this monthRegisteredDec 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Dec 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

12%6 of 50 units booked
24.9%Work done, per cost certificate

Figures as on 23 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI CRESTNA4446450

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 70%.

SAI CREST: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered10
Open Space13

Land and ownership14

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area650 sq m
Land owned byThe promoter, with other names on the file
Named landowners14
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Feb 2026
LandownerVillageDistrict
HEMA SITARAI BHAGATKalamboliRaigarh
KISHOR ATMARAM BHAGAT Kamothe Raigarh
BHAGWAN PANDHARINATH BHAGAT Kamothe Raigarh
SUNNY SITARAM BHAGATKalamboliRaigarh
MEGHA RAKESH SHELKEArathiRaigarh
CHANDRAKALA SITARAM BHAGATKalamboliRaigarh
PARDESHI NILESH MAHADEOChinchpadaRaigarh
VISHWAS ATMARAM BHAGAT Kamothe Raigarh
DHANAJI CHAYA PATIL Kamothe Raigarh
NARAYAN BALARAM BHAGAT Kamothe Raigarh
REKHA MANAJI PATIL Kamothe Raigarh
BHARAT BALARAM BHAGATPanvelRaigarh
TANAJI PANDHARINATH BHAGAT Kamothe Raigarh
TARABAI GANGARAM BHAGATNaupadaRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI928.46
Proposed, not sanctioned928 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHARTI COMPLEX, SHOP NO.7,8,9310 & 11, PLOT NO. 60/61, SECTOR 18, KAMOTHE II, PANVEL-
Estimated costRs 5.50 cr
Cost incurredRs 1.37 cr
Work done24.91%
BuildingWingEstimatedIncurred
SAI CRESTNARs 5.20 crRs 1.37 cr
-NARs 30.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTUYOG ARCHITECTS
EngineerSTRUCON CONSULTING ENGINEERS
EngineerPAVAN JOSHI
Chartered AccountantHARIYANI & ASSOCIATES CHARTERED ACCOUNTANTS
Chartered AccountantDHANDEKAR METHWANI & CO
Chartered AccountantBHAVESH BHANUSHALI & ASSOCIATES
PartnerRole in project
SAI SHRISHTI BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_DEC 25_SAI CREST.pdf23 Feb 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ SAI CREST.pdf23 Feb 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ SAI CREST.pdf23 Feb 2026
Form 2A (FY 2024-2025)File: FORM 2A SAI CREST (1).pdf12 Jan 2026
Form 1File: FORM 1_DEC 24_SAI CREST.pdf8 Jan 2026
Form 2File: FORM 2_DEC 24_SAI CREST.pdf8 Jan 2026
Form 3File: FORM 3_ DEC 24_ SAI CREST.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 24_ SAI CREST.pdf8 Jan 2026
Form 1File: FORM 1_MARCH 25_SAI CREST.pdf8 Jan 2026
Form 2File: FORM 2_MARCH 25_SAI CREST.pdf8 Jan 2026
Form 3File: FORM 3_ MARCH 25_ SAI CREST.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ SAI CREST.pdf8 Jan 2026
Form 1File: FORM 1_JUNE 25_SAI CREST.pdf8 Jan 2026
Form 2File: FORM 2_JUNE 25_SAI CREST.pdf8 Jan 2026
Form 3File: FORM 3_ JUNE 25_ SAI CREST.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ SAI CREST.pdf8 Jan 2026
Form 1File: FORM 1_SEP 25_SAI CREST.pdf8 Jan 2026
Form 2File: FORM 2_SEP 25_SAI CREST.pdf8 Jan 2026
Form 3File: FORM 3_ SEP 25_ SAI CREST.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ SAI CREST.pdf8 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ SAI CREST.pdf8 Jan 2026
Other - FinanceFile: Declaration No Sale - Saicrest.pdf29 Nov 2024
Other - FinanceFile: Declaration Distribution.pdf29 Nov 2024
Other - LegalFile: a.pdf12 Nov 2024
Other - LegalFile: b.pdf12 Nov 2024
Other - LegalFile: b1.pdf12 Nov 2024
Other - LegalFile: c.pdf12 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 2 Other - Finance.pdf12 Nov 2024
Other - FinanceFile: 1.pdf9 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: f2.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 final after Land cost deduction.pdf8 Nov 2024
Copy of the legal title reportFile: Title.pdf23 Oct 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf23 Oct 2024
Deviation Report with respect to model copy of AgreementFile: AFS Dvistn.pdf22 Oct 2024
Other - FinanceFile: sai crest cc mail.pdf18 Oct 2024
PAN CardFile: pan sai.pdf17 Oct 2024
PAN CardFile: GST Registration Certificate Sai Shrishti.pdf17 Oct 2024
Layout approvalFile: CC Plan.pdf15 Oct 2024
Copy of Layout Approval (in case of layout)File: CC Plan.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Plan.pdf15 Oct 2024
Building plan approvalFile: CC Plan.pdf12 Oct 2024
Layout approvalFile: Layout.pdf12 Oct 2024
PAN CardFile: kyc 1.pdf12 Oct 2024
PAN CardFile: kyc 2.pdf12 Oct 2024
PAN CardFile: kyc 3.pdf12 Oct 2024
PAN CardFile: GST Sai shrishtti.pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: Encmbrnc to Finance.pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: Encmbrnc to Legal.pdf12 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf12 Oct 2024
Proforma of Allotment letterFile: Allotment.pdf12 Oct 2024
Declaration in FORM BFile: Form B sai shrishti builders and developers.pdf12 Oct 2024
Declaration in FORM BFile: Form B landowners.pdf12 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf12 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Plan.pdf12 Oct 2024
Other - LegalFile: TP 3.pdf12 Oct 2024
Other - LegalFile: Lease 1.pdf12 Oct 2024
Other - LegalFile: Lease 2.pdf12 Oct 2024
Other - LegalFile: TP 1.pdf12 Oct 2024
Other - LegalFile: TP 2.pdf12 Oct 2024
Other - LegalFile: TP 22.pdf12 Oct 2024
Other - LegalFile: Lease 11.pdf12 Oct 2024
Other - LegalFile: 1 DA.pdf12 Oct 2024
Other - LegalFile: 2 DA.pdf12 Oct 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf12 Oct 2024
CERSAI detailsFile: CERSAI Declaration.pdf12 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Formate A RERA Ac.pdf12 Oct 2024
Deviation Report with respect to Allotment letterFile: DEVIATION AL - SAI CREAST.pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: Encmbrnc to Legal.pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: Encmbrnc to Finance.pdf12 Oct 2024
Other - TechnicalFile: Order 50 Annexure A.pdf12 Oct 2024
Other - TechnicalFile: SRO.pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Dis Int Othre Real Company.pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Partners Dis Int other Real estate.pdf12 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Declaration Loan.pdf12 Oct 2024

How this compares with Raigarh

12%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI CREST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT NO 20 SECTOR 35 KAMOTHE5,900+ in Raigarh

2 kmSAI CRESTCompleted 57Lapsed / revoked 7Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: SAI SHRISHTI BUILDERS AND DEVELOPERS

SAI SHRISHTI BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SAI CREST. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI CREST is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI CREST?

The registered promoter entity is SAI SHRISHTI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI CREST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI CREST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI CREST?

The professionals named in the filing: Architect: VASTUYOG ARCHITECTS; Engineer: STRUCON CONSULTING ENGINEERS; Engineer: PAVAN JOSHI; Chartered Accountant: HARIYANI & ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: DHANDEKAR METHWANI & CO; Chartered Accountant: BHAVESH BHANUSHALI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI CREST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI CREST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI CREST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.