Home / Browse projects / Raigarh, Maharashtra / SAI CREST
SAI CREST
By SAI SHRISHTI BUILDERS AND DEVELOPERS
RG-MH-23336 · RERA P52000078644 · Last updated on MahaRERA portal: 23 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI CREST is a Others project by SAI SHRISHTI BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000078644 on 30 Dec 2024. Possession is promised by 30 Jun 2028. 6 of the 50 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSAI CREST
- TypeOthers
- Location
- PLOT NO 20 SECTOR 35 KAMOTHE
- Kamothe
- Panvel
- Raigarh
- 410209
- Pincode410209
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000078644
- ReraGenie IDRG-MH-23336
Builder
- NameSAI SHRISHTI BUILDERS AND DEVELOPERS
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Dec 2024
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Current status
Figures as on 23 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAI CREST | NA | 4 | 4 | 46 | 4 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 70%.
SAI CREST: 40% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership14
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HEMA SITARAI BHAGAT | Kalamboli | Raigarh |
| KISHOR ATMARAM BHAGAT | Kamothe | Raigarh |
| BHAGWAN PANDHARINATH BHAGAT | Kamothe | Raigarh |
| SUNNY SITARAM BHAGAT | Kalamboli | Raigarh |
| MEGHA RAKESH SHELKE | Arathi | Raigarh |
| CHANDRAKALA SITARAM BHAGAT | Kalamboli | Raigarh |
| PARDESHI NILESH MAHADEO | Chinchpada | Raigarh |
| VISHWAS ATMARAM BHAGAT | Kamothe | Raigarh |
| DHANAJI CHAYA PATIL | Kamothe | Raigarh |
| NARAYAN BALARAM BHAGAT | Kamothe | Raigarh |
| REKHA MANAJI PATIL | Kamothe | Raigarh |
| BHARAT BALARAM BHAGAT | Panvel | Raigarh |
| TANAJI PANDHARINATH BHAGAT | Kamothe | Raigarh |
| TARABAI GANGARAM BHAGAT | Naupada | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAI CREST | NA | Rs 5.20 cr | Rs 1.37 cr |
| - | NA | Rs 30.00 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VASTUYOG ARCHITECTS |
| Engineer | STRUCON CONSULTING ENGINEERS |
| Engineer | PAVAN JOSHI |
| Chartered Accountant | HARIYANI & ASSOCIATES CHARTERED ACCOUNTANTS |
| Chartered Accountant | DHANDEKAR METHWANI & CO |
| Chartered Accountant | BHAVESH BHANUSHALI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SAI SHRISHTI BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_DEC 25_SAI CREST.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2_ DEC 25_ SAI CREST.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3_ DEC 25_ SAI CREST.pdf | 23 Feb 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A SAI CREST (1).pdf | 12 Jan 2026 |
| Form 1File: FORM 1_DEC 24_SAI CREST.pdf | 8 Jan 2026 |
| Form 2File: FORM 2_DEC 24_SAI CREST.pdf | 8 Jan 2026 |
| Form 3File: FORM 3_ DEC 24_ SAI CREST.pdf | 8 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 24_ SAI CREST.pdf | 8 Jan 2026 |
| Form 1File: FORM 1_MARCH 25_SAI CREST.pdf | 8 Jan 2026 |
| Form 2File: FORM 2_MARCH 25_SAI CREST.pdf | 8 Jan 2026 |
| Form 3File: FORM 3_ MARCH 25_ SAI CREST.pdf | 8 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ SAI CREST.pdf | 8 Jan 2026 |
| Form 1File: FORM 1_JUNE 25_SAI CREST.pdf | 8 Jan 2026 |
| Form 2File: FORM 2_JUNE 25_SAI CREST.pdf | 8 Jan 2026 |
| Form 3File: FORM 3_ JUNE 25_ SAI CREST.pdf | 8 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ SAI CREST.pdf | 8 Jan 2026 |
| Form 1File: FORM 1_SEP 25_SAI CREST.pdf | 8 Jan 2026 |
| Form 2File: FORM 2_SEP 25_SAI CREST.pdf | 8 Jan 2026 |
| Form 3File: FORM 3_ SEP 25_ SAI CREST.pdf | 8 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ SAI CREST.pdf | 8 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ SAI CREST.pdf | 8 Jan 2026 |
| Other - FinanceFile: Declaration No Sale - Saicrest.pdf | 29 Nov 2024 |
| Other - FinanceFile: Declaration Distribution.pdf | 29 Nov 2024 |
| Other - LegalFile: a.pdf | 12 Nov 2024 |
| Other - LegalFile: b.pdf | 12 Nov 2024 |
| Other - LegalFile: b1.pdf | 12 Nov 2024 |
| Other - LegalFile: c.pdf | 12 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 2 Other - Finance.pdf | 12 Nov 2024 |
| Other - FinanceFile: 1.pdf | 9 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: f2.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 final after Land cost deduction.pdf | 8 Nov 2024 |
| Copy of the legal title reportFile: Title.pdf | 23 Oct 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 23 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: AFS Dvistn.pdf | 22 Oct 2024 |
| Other - FinanceFile: sai crest cc mail.pdf | 18 Oct 2024 |
| PAN CardFile: pan sai.pdf | 17 Oct 2024 |
| PAN CardFile: GST Registration Certificate Sai Shrishti.pdf | 17 Oct 2024 |
| Layout approvalFile: CC Plan.pdf | 15 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: CC Plan.pdf | 15 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Plan.pdf | 15 Oct 2024 |
| Building plan approvalFile: CC Plan.pdf | 12 Oct 2024 |
| Layout approvalFile: Layout.pdf | 12 Oct 2024 |
| PAN CardFile: kyc 1.pdf | 12 Oct 2024 |
| PAN CardFile: kyc 2.pdf | 12 Oct 2024 |
| PAN CardFile: kyc 3.pdf | 12 Oct 2024 |
| PAN CardFile: GST Sai shrishtti.pdf | 12 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encmbrnc to Finance.pdf | 12 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encmbrnc to Legal.pdf | 12 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 12 Oct 2024 |
| Proforma of Allotment letterFile: Allotment.pdf | 12 Oct 2024 |
| Declaration in FORM BFile: Form B sai shrishti builders and developers.pdf | 12 Oct 2024 |
| Declaration in FORM BFile: Form B landowners.pdf | 12 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf | 12 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CC Plan.pdf | 12 Oct 2024 |
| Other - LegalFile: TP 3.pdf | 12 Oct 2024 |
| Other - LegalFile: Lease 1.pdf | 12 Oct 2024 |
| Other - LegalFile: Lease 2.pdf | 12 Oct 2024 |
| Other - LegalFile: TP 1.pdf | 12 Oct 2024 |
| Other - LegalFile: TP 2.pdf | 12 Oct 2024 |
| Other - LegalFile: TP 22.pdf | 12 Oct 2024 |
| Other - LegalFile: Lease 11.pdf | 12 Oct 2024 |
| Other - LegalFile: 1 DA.pdf | 12 Oct 2024 |
| Other - LegalFile: 2 DA.pdf | 12 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 12 Oct 2024 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 12 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Formate A RERA Ac.pdf | 12 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION AL - SAI CREAST.pdf | 12 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encmbrnc to Legal.pdf | 12 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encmbrnc to Finance.pdf | 12 Oct 2024 |
| Other - TechnicalFile: Order 50 Annexure A.pdf | 12 Oct 2024 |
| Other - TechnicalFile: SRO.pdf | 12 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Dis Int Othre Real Company.pdf | 12 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Partners Dis Int other Real estate.pdf | 12 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Declaration Loan.pdf | 12 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAI CREST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PLOT NO 20 SECTOR 35 KAMOTHE5,900+ in Raigarh
Filed coordinates, straight-line distance. 98 registered projects within 2 km.
Plot No -1 Sector - 28 Khandeshwar Railway Sta
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -2,Sector-39,Mansarovar Railway Statio
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
FLORENCE
VILLA REALCON LLP
One Millennium
MILLENNIUM INFRA
LK VIVANTA
LK DIWANI INFRA
BHAVESHWAR VISTA
BHAVESHWAR INFRA
See every Raigarh project, with the district possession charts
Builder: SAI SHRISHTI BUILDERS AND DEVELOPERS
SAI SHRISHTI BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SAI CREST. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SAI CREST is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI CREST?
The registered promoter entity is SAI SHRISHTI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI CREST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI CREST?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI CREST?
The professionals named in the filing: Architect: VASTUYOG ARCHITECTS; Engineer: STRUCON CONSULTING ENGINEERS; Engineer: PAVAN JOSHI; Chartered Accountant: HARIYANI & ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: DHANDEKAR METHWANI & CO; Chartered Accountant: BHAVESH BHANUSHALI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI CREST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback