Registered No litigation declared Residential / Group Housing project

SAHYADRI PLUMERIA PHASE II

By SAHYADRI LANDMARKS

RG-MH-07416 · RERA P52100076613 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 10Construction stages donefurthest along: Slabs of Super Structure, 45%
51 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SAHYADRI PLUMERIA PHASE II is a Residential / Group Housing project by SAHYADRI LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100076613 on 18 Jun 2024. Possession is promised by 31 Dec 2028. 15 of the 66 units on this registration are recorded sold or booked, and 3 of 10 construction stages are filed complete.

At a glance

Project

  • NameSAHYADRI PLUMERIA PHASE II
  • TypeResidential / Group Housing
  • Location
    • BORHADEWADI
    • PUNE
    • Moshi
    • Haveli
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076613
  • ReraGenie IDRG-MH-07416

Builder

  • NameSAHYADRI LANDMARKS
  • Entity typePartnership
  • GSTIN27AEIFS3646E1ZW
  • PartnersRAJESH VASANTRAO PAWAR, SUJIT VASANT PATIL, SANJAY RAGHUNATH SHINDE
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jun 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

23%15 of 66 units booked
32.6%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BUILDINGNA11066066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 45%.

C BUILDING: 34% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed102

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots102
Closed/Covered34
Open Space68

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area806 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on7 Aug 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI16842.21
Proposed, not sanctioned6,842 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSH 10 11A 27A 28 29 INTERNATIONAL CONVENTION CENTE MOSHI PRADHIKARAN PUNE PIMPRI CHINCHWAD MH 412105
Estimated costRs 30.37 cr
Cost incurredRs 9.90 cr
Work done32.6%
BuildingWingEstimatedIncurred
C BUILDINGNARs 27.00 crRs 9.90 cr
-NARs 3.37 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHEKHAR ASHOK NAHAR
ArchitectARCON ASSOCIATES
EngineerMASHALKAR K M
EngineerSAGAR PATIL
Chartered AccountantCA VISHAL AGRAWAL
Chartered AccountantVISHAL AGARWAL
Chartered AccountantM/S A.N GAWADE & CO LLP
PartnerRole in project
SAHYADRI LANDMARKS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 01.pdf8 May 2026
Form 2File: FORM 02.pdf8 May 2026
Form 3File: FORM 03.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold and unsold.pdf8 May 2026
Form 1File: FORM 01 PH II (1).pdf8 May 2026
Form 2File: FORM 02.pdf8 May 2026
Form 3File: FORM 3 PH-II.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf8 May 2026
Form 1File: FORM 01.pdf8 May 2026
Form 2File: FORM 02.pdf8 May 2026
Form 3File: FORM 03 SEPT 24.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold disclosure.pdf8 May 2026
Form 1File: FROM 1 SAHYADRI PLUMERIA PHASE II.pdf8 May 2026
Form 2File: FROM 2 SAHYADRI PLUMERIA PHASE II.pdf8 May 2026
Form 3File: FROM 3 SAHYADRI PLUMERIA PHASE II.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSESURE SOLD.pdf8 May 2026
Withdrawal Update Form 1File: FROM 1 SAHYADRI PLUMERIA PHASE II.pdf8 Oct 2025
Withdrawal Update Form 1File: FROM 1 SAHYADRI PLUMERIA PHASE II.pdf8 Oct 2025
Withdrawal Update Form 2File: FORM 2 SAHYADRI PLUMERIA PHASE II.pdf8 Oct 2025
Withdrawal Update Form 2File: FORM 2 SAHYADRI PLUMERIA PHASE II.pdf8 Oct 2025
Withdrawal Update Form 3File: FROM 3 SAHYADRI PLUMERIA PHASE II (2) (1).pdf8 Oct 2025
Withdrawal Update Form 3File: FROM 3 SAHYADRI PLUMERIA PHASE II (2) (1).pdf8 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 .pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure PH II.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Sahyadri Pulmeria PH II Disclosure 30 9 24.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 SAHYADRI PLUMERIA PHASE II.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SAHYADRI PLUMERIA PHASE II.pdf9 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSESURE SOLD PHASE II 30-06-24.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 SAHYADRI PLUMERIA PHASE II.pdf9 Aug 2024
Other - LegalFile: ४९८७(२०२२) विकसनकरारनामा बोऱ्हाडे.pdf10 Jun 2024
Other - LegalFile: ४९८३ (२०२२) विकसनकरारनामा मातेरे (1).pdf10 Jun 2024
Other - TechnicalFile: CC Verification (2).pdf1 Jun 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf23 May 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: declaration borhade.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: declaration matere.pdf23 May 2024
Proforma of Agreement for saleFile: DRaft ATS Plumeria Phase 2.pdf23 May 2024
Proforma of Allotment letterFile: Draft Allotment Letter.pdf23 May 2024
Deviation Report with respect to Allotment letterFile: deviation allotment.pdf23 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report ATS Plumeria Ph 2_11zon.pdf23 May 2024
Other - FinanceFile: declaration borhade.pdf23 May 2024
Other - FinanceFile: declaration matere.pdf23 May 2024
Other - TechnicalFile: declaration borhade.pdf23 May 2024
Other - TechnicalFile: declaration matere.pdf23 May 2024
Other - TechnicalFile: DECLARATION20240509_04002791.pdf23 May 2024
Other - TechnicalFile: ANNEXURE ‘A’ DECLARATION -CUM - UNDERTAKING1 (1).pdf23 May 2024
Building plan approvalFile: Ground Floor Plan - C Building.pdf21 May 2024
Building plan approvalFile: 2nd and 3rd floor Plan - C Building.pdf21 May 2024
Building plan approvalFile: 4th to 7th floor Plan - C Building.pdf21 May 2024
Building plan approvalFile: 9th floor and terrace plan - C Building.pdf21 May 2024
Building plan approvalFile: PLAN NO 18 - C Building.pdf21 May 2024
Copy of the legal title reportFile: Legal Report.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ground Floor Plan - C Building.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2nd and 3rd floor Plan - C Building.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4th to 7th floor Plan - C Building.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 9th floor and terrace plan - C Building.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN NO 18 - C Building.pdf21 May 2024
CERSAI detailsFile: CERSAI.pdf21 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT'A'.pdf21 May 2024
PAN CardFile: SAHYADRI LANDMAEK PANCARD.pdf17 May 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATE20240509_04063333.pdf17 May 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE CERTIFICATE20240509_04042286.pdf17 May 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CERTIFICATE20240509_04063333.pdf17 May 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE CERTIFICATE20240509_04042286.pdf17 May 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMESMENT PHASE- II.pdf17 May 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf17 May 2024
Declaration in FORM BFile: FORM B (1).pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM- 3 - CA Certificate.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in other Real Estate Organizat - Rajesh.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in other Real Estate Organizat -Sujit.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in other Real Estate -Sanjay.pdf17 May 2024
Other - LegalFile: Declaration_240517_144114.pdf17 May 2024
Other - LegalFile: Declaration Matere_240517_144606.pdf17 May 2024

How this compares with Pune

23%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAHYADRI PLUMERIA PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: SAHYADRI LANDMARKS

SAHYADRI LANDMARKS has 3 registrations on MahaRERA, including SAHYADRI PLUMERIA and SAHYADRI PLUMERIA PHASE II. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAHYADRI PLUMERIA PHASE II is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHYADRI PLUMERIA PHASE II?

The registered promoter entity is SAHYADRI LANDMARKS, a partnership as per the filing. Its GSTIN 27AEIFS3646E1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHYADRI PLUMERIA PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHYADRI PLUMERIA PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHYADRI PLUMERIA PHASE II?

The professionals named in the filing: Architect: SHEKHAR ASHOK NAHAR; Architect: ARCON ASSOCIATES; Engineer: MASHALKAR K M; Engineer: SAGAR PATIL; Chartered Accountant: CA VISHAL AGRAWAL; Chartered Accountant: VISHAL AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHYADRI PLUMERIA PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHYADRI PLUMERIA PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHYADRI PLUMERIA PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.