SAHYADRI PLUMERIA

By SAHYADRI LANDMARKS

RG-MH-49414 · RERA P52100049968 · Last updated on MahaRERA portal: 9 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 9Construction stages donefurthest along: Slabs of Super Structure, 95%
81 of 233Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

SAHYADRI PLUMERIA is a Others project by SAHYADRI LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100049968 on 6 Mar 2023. Possession is promised by 31 Dec 2027. 152 of the 233 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.

At a glance

Project

  • NameSAHYADRI PLUMERIA
  • TypeOthers
  • Location
    • -
    • BORHADEWADI
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049968
  • ReraGenie IDRG-MH-49414

Builder

  • NameSAHYADRI LANDMARKS
  • Entity typePartnership
  • GSTIN27AEIFS3646E1ZW
  • PartnersRAJESH VASANTRAO PAWAR, SUJIT VASANT PATIL, SANJAY RAGHUNATH SHINDE
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed126 files

Current status

65%152 of 233 units booked
46.7%Work done, per cost certificate

Figures as on 9 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAHYADRI PLUMERIANA21202267233

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

SAHYADRI PLUMERIA: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed775

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots775
Closed/Covered125
Open Space650

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,255 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Dec 2025
LandownerVillageDistrict
VIKAS NARAYAN BORHADE AND OTHERSMoshiPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI19245.18
Proposed, not sanctioned19,245 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 10 11A 27A 28 29 INTERNATIONAL CONVENTION CENTRE MOSHI PRADHIKARAN PUNE PIMPRI CHINCHWAD MH
Estimated costRs 82.75 cr
Cost incurredRs 38.66 cr
Work done46.72%
BuildingWingEstimatedIncurred
SAHYADRI PLUMERIANARs 80.00 crRs 38.66 cr
-NARs 2.75 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCON ASSOCIATES
EngineerSURAJKUMAR SHIVAJI PAWAR
EngineerSAGAR PATIL
EngineerPLANEDGE CONSULTANTS PRIVATE LIMITED
Chartered AccountantVISHAL RAJENDRAPRASAD AGRAWAL
Chartered AccountantVISHAL AGARWAL
Chartered AccountantM/S A.N GAWADE & CO LLP
PartnerRole in project
SAHYADRI LANDMARKS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 01 (1).pdf9 Jan 2026
Form 2File: FORM 02 (1).pdf9 Jan 2026
Form 3File: FORM 3.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE 31-03-25.pdf9 Jan 2026
Form 1File: FORM 01.pdf9 Jan 2026
Form 2File: FORM 02.pdf9 Jan 2026
Form 3File: FORM 03 (1).pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf9 Jan 2026
Form 1File: FORM-1.pdf9 Jan 2026
Form 2File: FORM-2.pdf9 Jan 2026
Form 3File: FORM 3 30-03-2024.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-03-2024.pdf9 Jan 2026
Form 1File: FORM 1- 30-06-2024.pdf9 Jan 2026
Form 2File: FORM 2- 30-06-2024.pdf9 Jan 2026
Form 3File: FORM 3 30-06-2024.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-06-2024.pdf9 Jan 2026
Form 1File: FOMR 1- 30-09-2024.pdf9 Jan 2026
Form 2File: FORM 2- 30-09-2024.pdf9 Jan 2026
Form 3File: FORM 3- 30-09-2024.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-09-2024.pdf9 Jan 2026
Form 1File: FORM 1-31-12-2023.pdf9 Jan 2026
Form 2File: FORM 2- 31-12-2023.pdf9 Jan 2026
Form 3File: FORM 3- 31-12-2023.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 31-12-2023.pdf9 Jan 2026
Form 1File: FORM 1- 30-09-2023.pdf9 Jan 2026
Form 2File: FORM 2- 30-09-2023.pdf9 Jan 2026
Form 3File: FORM -3 30-09-2023.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-09-2023.pdf9 Jan 2026
Form 1File: FORM 1- 30-06-2023.pdf9 Jan 2026
Form 2File: FORM 2- 30-06-2023.pdf9 Jan 2026
Form 3File: FORM 3- 30-06-2023.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30-06-2023.pdf9 Jan 2026
Withdrawal Update Form 1File: FORM 01.pdf9 Jan 2026
Withdrawal Update Form 1File: FORM 1 SAHYADRI PLUMERIA.pdf9 Jan 2026
Withdrawal Update Form 1File: FORM 01.pdf9 Jan 2026
Withdrawal Update Form 2File: FORM 02 (1).pdf9 Jan 2026
Withdrawal Update Form 2File: FORM 2 SAHYADRI PLUMERIA (1).pdf9 Jan 2026
Withdrawal Update Form 2File: FORM 02 (1).pdf9 Jan 2026
Withdrawal Update Form 3File: FORM 03 (2).pdf9 Jan 2026
Withdrawal Update Form 3File: FORM 3 SAHYADRI PLUMERIA (3).pdf9 Jan 2026
Withdrawal Update Form 3File: FORM 03 (2).pdf9 Jan 2026
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JUNE 23.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold - booked inventory.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 march.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 june 24.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 24 FORM 3 (6)_compressed.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (2) (1).pdf28 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FROM 2A 23-24.pdf28 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 23-24.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTROY.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SAHYADRI PLUMERIA.pdf9 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE 30-06-24 (2).pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SAHYADRI PLUMERIA.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGINEER'S CERTIFICATE.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM -3.pdf27 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 31 03 24.pdf25 May 2024
CERSAI detailsFile: CERSAI_Search_Report_ 25 Cr.pdf7 May 2024
CERSAI detailsFile: CERSAI_Search_Report_5 Cr.pdf7 May 2024
Details of encumbrances concerned to FinanceFile: गहाणखत 20240328_23285932.pdf30 Mar 2024
Details of encumbrances concerned to LegalFile: गहाणखत 20240328_23285932.pdf30 Mar 2024
Proforma of Agreement for saleFile: Draft Agreement Plumeria new rera.pdf30 Mar 2024
Proforma of Agreement for saleFile: Draft Plumeria 2024 RERA.pdf30 Mar 2024
Details of encumbrances concerned to FinanceFile: गहाणखत 20240328_23285932.pdf29 Mar 2024
Details of encumbrances concerned to LegalFile: गहाणखत 20240328_23285932.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1) (1).pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (7).pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FLAT.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (3)_compressed.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (1).pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf5 Dec 2023
Disclosure of sold/ booked inventoryFile: sold unsold_compressed.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FROM 1 30-06-2023.pdf2 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 30-06-2023.pdf2 Sep 2023

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAHYADRI PLUMERIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORHADEWADI13,700+ in Pune

2 kmSAHYADRI PLUMERIACompleted 65Lapsed / revoked 37Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 184 registered projects within 2 km.

Builder: SAHYADRI LANDMARKS

SAHYADRI LANDMARKS has 3 registrations on MahaRERA, including SAHYADRI PLUMERIA and SAHYADRI PLUMERIA PHASE II. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAHYADRI PLUMERIA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHYADRI PLUMERIA?

The registered promoter entity is SAHYADRI LANDMARKS, a partnership as per the filing. Its GSTIN 27AEIFS3646E1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHYADRI PLUMERIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHYADRI PLUMERIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHYADRI PLUMERIA?

The professionals named in the filing: Architect: ARCON ASSOCIATES; Engineer: SURAJKUMAR SHIVAJI PAWAR; Engineer: SAGAR PATIL; Engineer: PLANEDGE CONSULTANTS PRIVATE LIMITED; Chartered Accountant: VISHAL RAJENDRAPRASAD AGRAWAL; Chartered Accountant: VISHAL AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHYADRI PLUMERIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHYADRI PLUMERIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHYADRI PLUMERIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.