ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / SAHYADRI PEARL

Registered No litigation declared Others project

SAHYADRI PEARL

By SAHYADRI DEVELOPERS

RG-MH-18744 · RERA P53100077553 · Last updated on MahaRERA portal: 25 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

SAHYADRI PEARL is a Others project by SAHYADRI DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100077553 on 10 Oct 2024. Possession is promised by 30 Jul 2027.

At a glance

Project

  • NameSAHYADRI PEARL
  • TypeOthers
  • Location
    • DHAMANI ROAD
    • LIMAYE MALA
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416415
  • Pincode416415
  • RERA no.P53100077553
  • ReraGenie IDRG-MH-18744

Builder

  • NameSAHYADRI DEVELOPERS
  • Entity typeIndividual
  • GSTIN27ACBFS8624B1Z9
  • PartnerSATYAJIT SURYAKANT NALAWADE
  • PartnerRAHUL SHIVAJI KANEGAONKAR
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2024PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2024
  • Promised completion30 Jul 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAHYADRI PEARL WING ANA80000
SAHYADRI PEARL WING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

SAHYADRI PEARL WING A60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SAHYADRI PEARL WING B44%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered19
Open Space86
BuildingClosed/CoveredOpen SpaceTotal
SAHYADRI PEARL WING A125062
SAHYADRI PEARL WING B73643

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,584 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
JITENDRA MADHAV JADHAVSangli Miraj Kupwad (M Corp.)Sangli
MALATI MADHAV JADHAVSangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Permissible FSI6652.1
Proposed, not sanctioned6,652 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAshok pushpa dr magdum building vishrambag post willingdon collage sangli 416415

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectar sachin kanoje
Engineersunil s pavaskar
Chartered AccountantDHAVAL KISHOR GORE
PartnerRole in project
SAHYADRI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jul 2027

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 24-02-25.pdf25 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A DCB BANK.pdf25 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format B.pdf25 Feb 2025
Details of encumbrances concerned to FinanceFile: encumbrance finance.pdf24 Feb 2025
Details of encumbrances concerned to LegalFile: encumbrance finance.pdf24 Feb 2025
Other - FinanceFile: MORTGAGE DEED SCAN_compressed.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 WING A WING B SAHYADRI PEARL.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SAHYADRI PEARL (1).pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_sahyadri.pdf22 Feb 2025
Other - LegalFile: SMKC TO MAHARERA_SAHAYADRI PEARL.pdf15 Jun 2024
Other - LegalFile: SMKC TO MAHARERA_SAHAYADRI PEARL.pdf15 Jun 2024
Other - LegalFile: SMKC TO MAHARERA_SAHAYADRI PEARL.pdf15 Jun 2024
Proforma of Allotment letterFile: FINAL ALLOTMENT LETTER 27072024.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 new_compressed.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE 22052024 DATE CORRECTED.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 May 2024
Other - LegalFile: AMALGAMATION ORDER.pdf16 May 2024
Other - LegalFile: DEVELOPEMENT AGREEMENT_11zon.pdf16 May 2024
Other - LegalFile: POWER OF ATTORNY.pdf16 May 2024
Other - LegalFile: annexure A ORDER 50.pdf16 May 2024
CERSAI detailsFile: undertaking.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf16 May 2024
Deviation Report with respect to Allotment letterFile: non devation certificate.pdf16 May 2024
Other - TechnicalFile: COMPLETION OF WORK UP TO PLINTH LEVEL.pdf16 May 2024
Deviation Report with respect to model copy of AgreementFile: non devation cerificate agreement to sale.pdf16 May 2024
Proforma of Agreement for saleFile: Agreement RERA DRAFT AS per MAHA RERA SAHYADRI PEARL 18072024.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RAHUL KANEGAONKAR.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SATYAJEET NALWADE.pdf16 May 2024
Proforma of Allotment letterFile: FINAL ALLOTMENT LETTER 27072024.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 new_compressed.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE 22052024 DATE CORRECTED.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 May 2024
Other - LegalFile: AMALGAMATION ORDER.pdf16 May 2024
Other - LegalFile: DEVELOPEMENT AGREEMENT_11zon.pdf16 May 2024
Other - LegalFile: POWER OF ATTORNY.pdf16 May 2024
Other - LegalFile: annexure A ORDER 50.pdf16 May 2024
CERSAI detailsFile: undertaking.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf16 May 2024
Deviation Report with respect to Allotment letterFile: non devation certificate.pdf16 May 2024
Other - TechnicalFile: COMPLETION OF WORK UP TO PLINTH LEVEL.pdf16 May 2024
Deviation Report with respect to model copy of AgreementFile: non devation cerificate agreement to sale.pdf16 May 2024
Proforma of Agreement for saleFile: Agreement RERA DRAFT AS per MAHA RERA SAHYADRI PEARL 18072024.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RAHUL KANEGAONKAR.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SATYAJEET NALWADE.pdf16 May 2024
Proforma of Allotment letterFile: FINAL ALLOTMENT LETTER 27072024.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 new_compressed.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE 22052024 DATE CORRECTED.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 May 2024
Other - LegalFile: AMALGAMATION ORDER.pdf16 May 2024
Other - LegalFile: DEVELOPEMENT AGREEMENT_11zon.pdf16 May 2024
Other - LegalFile: POWER OF ATTORNY.pdf16 May 2024
Other - LegalFile: annexure A ORDER 50.pdf16 May 2024
CERSAI detailsFile: undertaking.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf16 May 2024
Deviation Report with respect to Allotment letterFile: non devation certificate.pdf16 May 2024
Other - TechnicalFile: COMPLETION OF WORK UP TO PLINTH LEVEL.pdf16 May 2024
Deviation Report with respect to model copy of AgreementFile: non devation cerificate agreement to sale.pdf16 May 2024
Proforma of Agreement for saleFile: Agreement RERA DRAFT AS per MAHA RERA SAHYADRI PEARL 18072024.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RAHUL KANEGAONKAR.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SATYAJEET NALWADE.pdf16 May 2024
Building plan approvalFile: PEAR AREA STATEMENT SHEET NO 3.pdf15 May 2024
Building plan approvalFile: PEARL ELEVATIN SECTION SHEET NO 2_compressed.pdf15 May 2024
Building plan approvalFile: PEARL PLAN SHEET NO 1.PDF15 May 2024
Layout approvalFile: AMALGAMATION DWG.pdf15 May 2024
Building plan approvalFile: PEAR AREA STATEMENT SHEET NO 3.pdf15 May 2024
Building plan approvalFile: PEARL ELEVATIN SECTION SHEET NO 2_compressed.pdf15 May 2024
Building plan approvalFile: PEARL PLAN SHEET NO 1.PDF15 May 2024
Layout approvalFile: AMALGAMATION DWG.pdf15 May 2024
Building plan approvalFile: PEAR AREA STATEMENT SHEET NO 3.pdf15 May 2024
Building plan approvalFile: PEARL ELEVATIN SECTION SHEET NO 2_compressed.pdf15 May 2024
Building plan approvalFile: PEARL PLAN SHEET NO 1.PDF15 May 2024
Layout approvalFile: AMALGAMATION DWG.pdf15 May 2024
PAN CardFile: PAN CARD.pdf15 May 2024
Copy of the legal title reportFile: SEARCH REPORT SAHYADRI PEARL REVISED.pdf15 May 2024
Details of encumbrances concerned to FinanceFile: no encumbrances certificate -financial.pdf15 May 2024
Details of encumbrances concerned to FinanceFile: no encumbrances certificate - legal.pdf15 May 2024
Copy of Layout Approval (in case of layout)File: AMALGAMATION DWG.pdf15 May 2024
Declaration in FORM BFile: FORM B - SAHYADRI DEV.pdf15 May 2024
Commencement Certificates / NA Order for plotted developmentFile: PRAMANPATARA.pdf15 May 2024
Building Plan Approval / NA Order for plotted developmentFile: PEARL PLAN SHEET NO 1.PDF15 May 2024

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SAHYADRI PEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LIMAYE MALA790+ in Sangli

Builder: SAHYADRI DEVELOPERS

SAHYADRI DEVELOPERS has 4 registrations on MahaRERA, including Trishla and SAHYADRI PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SAHYADRI PEARL is delayed beyond 30 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHYADRI PEARL?

The registered promoter entity is SAHYADRI DEVELOPERS, an individual as per the filing. Its GSTIN 27ACBFS8624B1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHYADRI PEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHYADRI PEARL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHYADRI PEARL?

The professionals named in the filing: Architect: ar sachin kanoje; Engineer: sunil s pavaskar; Chartered Accountant: DHAVAL KISHOR GORE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHYADRI PEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHYADRI PEARL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHYADRI PEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.