Completed No litigation declared Residential / Group Housing project

SAHARA COMPLEX

By GULAM HUSAIN YUSUF CHOUGLE

RG-MH-92251 · RERA P52800015442 · Last updated on MahaRERA portal: 10 Jul 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Jul 2020Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

SAHARA COMPLEX is a Residential / Group Housing project by GULAM HUSAIN YUSUF CHOUGLE in Ratnagiri, Maharashtra, registered with MahaRERA as P52800015442 on 26 Feb 2018. The registration is recorded completed; possession was promised by 29 Jul 2020.

At a glance

Project

  • NameSAHARA COMPLEX
  • TypeResidential / Group Housing
  • Location
    • NEAR SAHJEEVAN HIGHSCHOOL
    • KHED DAPOLI ROAD
    • Khed (M Cl)
    • Khed
    • Ratnagiri
    • 415709
  • Pincode415709
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800015442
  • ReraGenie IDRG-MH-92251

Builder

  • NameGULAM HUSAIN YUSUF CHOUGLE
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2018First promiseDec 2022Revised toJul 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Feb 2018
  • Promised completion29 Jul 2020
  • Revised completionRevised to 29 Jul 2020 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAHARA COMPLEXNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SAHARA COMPLEX: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 10 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
WATER LINEYes0%
ENTRANCE GATEYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,321 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GULKOUSAR AHMEDKHAN MAHADIKKhed (M Cl)Ratnagiri

Approvals and building plan

Permissible FSI1690.28
Proposed, not sanctioned1,690 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT POST KARJEE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARAS PRAVIN DIWATE
PartnerRole in project
GULAM HUSAIN YUSUF CHOUGLE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52800028116Dec 2022 → Jul 2020

Reason as filed by the promoterThis is to inform you that our completion date of above mentioned project was 30/12/2022. we have completed our project in all the aspects and we have also received the occupation certificate on 29/07/2020. As per the order no 24/2021 A (ii) promoter has to apply for an extension which will be valid upto the date upto date of the occupation certificate, post facto extension may be granted. Hence we want to apply for an extension, but we are not able to select the occupation certificate date that is 29/07/2020. Form 4 tab is freeze in application. Request you to help and guide us on the same.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Nov 2024

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: SARA APARTMENT 1_11zon.pdf10 Jul 2025
Building plan approvalFile: SARA APARTMENT 2_11zon.pdf10 Jul 2025
Building Plan Approval (IOD)File: SARA APARTMENT 1_11zon.pdf10 Jul 2025
Building Plan Approval (IOD)File: SARA APARTMENT 2_11zon.pdf10 Jul 2025
Other - TechnicalFile: APPENDIX I GULAM SHET.pdf9 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 sahara complex.pdf17 Mar 2025
Certificates of CA (Form 3)File: Form_3_SAHARA COMPLEX_11zon (1).pdf17 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sahara complex.pdf17 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 SAHARA COMPLEX.pdf17 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 (2).pdf28 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C.pdf28 Nov 2024
Certificates of CA (Form 3)File: Form3 31032018.pdf29 Jul 2020
Certificates of CA (Form 3)File: Form3 31032019.pdf29 Jul 2020
Certificates of CA (Form 3)File: Form3 30062019.pdf29 Jul 2020
Certificates of CA (Form 3)File: Form3 30092019.pdf29 Jul 2020
Certificates of CA (Form 3)File: Form3 31122019.pdf29 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18.pdf29 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf29 Jul 2020
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 1.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 2.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 3.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 4.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 5.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 6.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 7.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 8.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 9.pdf18 Feb 2018
Copy of the legal title reportFile: DEVELOPMENT AGREEMENT PART 10.pdf18 Feb 2018
Layout approvalFile: LAYOUT.pdf17 Feb 2018
Building plan approvalFile: APPROVED PLAN.pdf17 Feb 2018
PAN CardFile: PAN CARD.pdf17 Feb 2018
Details of encumbrancesFile: SEARCH REPORT PART 1.pdf17 Feb 2018
Details of encumbrancesFile: SEARCH REPORT PART 2.pdf17 Feb 2018
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf17 Feb 2018
Building Plan Approval (IOD)File: APPROVED PLAN.pdf17 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: PERMISSION.pdf17 Feb 2018
Declaration in FORM BFile: SELF AFFIDAVIT.pdf17 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf17 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf17 Feb 2018
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf17 Feb 2018
Proforma of Allotment letterFile: Sathekhat Rera Draft Sara Complex Flat.pdf17 Feb 2018
Proforma of Allotment letterFile: Sathekhat Rera Draft Sara Complex Shop.pdf17 Feb 2018

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep SAHARA COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHED DAPOLI ROAD1,100+ in Ratnagiri

2 kmSAHARA COMPLEXCompleted 18Lapsed / revoked 21Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: GULAM HUSAIN YUSUF CHOUGLE

GULAM HUSAIN YUSUF CHOUGLE has 1 registration on MahaRERA, including SAHARA COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if SAHARA COMPLEX is delayed beyond 29 Jul 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHARA COMPLEX?

The registered promoter entity is GULAM HUSAIN YUSUF CHOUGLE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHARA COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHARA COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHARA COMPLEX?

The professionals named in the filing: Architect: PARAS PRAVIN DIWATE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHARA COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHARA COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHARA COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.