Saha Aspire

By ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED

RG-KA-25807 · RERA PRM/KA/RERA/1268/378/PR/091123/006399 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jul 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 128 documents Report an error

Saha Aspire is a Plotted Development project by ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/091123/006399 on 9 Nov 2023. Possession is promised by 13 Jul 2027.

At a glance

Project

  • NameSaha Aspire
  • TypePlotted Development
  • Location
    • MYSORE
    • 570010
  • Pincode570010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/091123/006399
  • ReraGenie IDRG-KA-25807

Builder

  • NameESS AND ESS INFRASTRUCTUREPRIVATE LIMITED
  • Entity typeCompany
  • CINU70101KA2005PTC037964
  • Authorized SignatoryShreekaanth Daas
  • Managing DirectorShreekaanth Daas
  • DirectorsShreekaanth Daas, Prathibha B
  • Project HeadShreekaanth Daas
  • Other registrations3 more →
  • Declared earlier projects79 →

Key dates

this monthRegisteredNov 2023PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Nov 2023
  • Promised completion13 Jul 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed128 files

Current status

32.9%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners3
LandownerVillageDistrict
Sri S N Mahesh--
Sri S N Mahesh--
Sri S N Mahesh--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.46 cr
Cost incurredRs 48.19 lakh
Spent of the estimate32.9%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.46 crRs 23.81 lakh
On-site expenditure-Salaries of workers-Rs 17.40 lakh
On-site expenditure-Site Overhead-Rs 6.84 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)-Rs 12,752

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerC B Lakshman Rao
Chartered AccountantA Vishwanatha

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed128

As listed on the registration, under the names the promoter filed them with; the newest 80 of 128 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/091123/006399 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate Issued by Chartered Accountant Form 4.PDF15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
P&L Account and Balance Sheet with CA UDINFile: 1 P&L Account and Balance Sheet with CA UDIN.pdf9 Nov 2023
Clarification regarding Borrowing DetailsFile: 2 Clarification regarding Borrowing Details.pdf9 Nov 2023
Borrowing DetailsFile: 3 Borrowing Details.PDF9 Nov 2023
Charted Accountant certificate - Form 1File: 4 Charted Accountant certificate - Form 1.PDF9 Nov 2023
RERA Registration Fees DetailsFile: 7 RERA Registration Fees Details.pdf9 Nov 2023
JDA Sy No 56-2 & 56-3File: 8 JDA Sy No 56-2 & 56-3.pdf9 Nov 2023
Plot wise area Break up DetailsFile: 9 Plot wise area Break up Details.pdf9 Nov 2023
Individual plot Size, Dimension and Area detailsFile: 10 Individual plot Size, Dimension and Area details.pdf9 Nov 2023
Layout Work OrderFile: 11 Layout Work Order.pdf9 Nov 2023
CDP MapFile: 12 CDP Map.pdf9 Nov 2023
KSPCB Endorsement for other projectsFile: 13 KSPCB Endorsement for other projects.pdf9 Nov 2023
Architect's CertificateFile: 14 Architect's Certificate.pdf9 Nov 2023
Total, Covered and Open Area DetailsFile: 15 Total, Covered and Open Area Details.pdf9 Nov 2023
Park and CA DetailsFile: 16 Park and CA Details.pdf9 Nov 2023
Sites DetailsFile: 17 Sites Details.pdf9 Nov 2023
Common Area DetailsFile: 19 Common Area Details.pdf9 Nov 2023
Source of water supplyFile: 20 Source of water supply.pdf9 Nov 2023
Cost DetailsFile: 21 Cost Details.pdf9 Nov 2023
Land Cost Calculation SheetFile: 22 Land Cost Calculation Sheet.pdf9 Nov 2023
Brief Estimated Cost of ConstructionFile: 23 Brief Estimated Cost of Construction.PDF9 Nov 2023
Form 3File: Engineer Certificate Form 3.PDF9 Nov 2023
STP - Demarcated drawingFile: 25 STP - Demarcated drawing.pdf9 Nov 2023
ALLOTMENT LETTERFile: 26 ALLOTMENT LETTER.pdf9 Nov 2023
Project SpecificationsFile: 28 Project Specifications.PDF9 Nov 2023
RTC, survey 54/3-
Mutation, survey 54/3-
Encumbrance Certificate, survey 54/3-
Conversion/Alienation Order, survey 54/3-
Sale/Title/Gift Deed, survey 54/3-
JDA, survey 54/3-
Khatha, survey 54/3-
RTC, survey 56/2-
Mutation, survey 56/2-
Encumbrance Certificate, survey 56/2-
Conversion/Alienation Order, survey 56/2-
Sale/Title/Gift Deed, survey 56/2-
JDA, survey 56/2-
Khatha, survey 56/2-
RTC, survey 56/3-
Mutation, survey 56/3-
Encumbrance Certificate, survey 56/3-
Conversion/Alienation Order, survey 56/3-
Sale/Title/Gift Deed, survey 56/3-
JDA, survey 56/3-
Khatha, survey 56/3-
Registration CertificateFile: Registration Certificate.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form 1 - Certificate issued by Chartered Account.PDF-
Certificate issued by Engineer Form 3File: Engineer Certificate Form 3.PDF-
Project Chartered Accountant-
Project Engineer-
AffidavitFile: No Case Affidavit.PDF-
Certificate from Chartered AccountFile: Form 1 - Certificate issued by Chartered Account.PDF-
Balance Sheet 2022 - 2023File: 1 Balance Sheet FY 2021-22.pdf-
Balance Sheet 2021 - 2022File: 1 Balance Sheet FY 2021-22.pdf-
Balance Sheet 2020 - 2021File: 1 Balance Sheet FY 2020-21.pdf-
Audited Profit and Loss Statement 2022 - 2023File: 2 Profit and Loss Statement FY 2021-22.pdf-
Audited Profit and Loss Statement 2021 - 2022File: 2 Profit and Loss Statement FY 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 2 Profit and Loss Account Fy 2020-21.pdf-
Director's Report 2022 - 2023File: 3 Directors Report FY 2021-22.pdf-
Director's Report 2021 - 2022File: 3 Directors Report FY 2021-22.pdf-
Director's Report 2020 - 2021File: 3 Directors Report FY 2020-21.pdf-
Cash Flow Statement 2022 - 2023File: 4 Cash Flow Statement FY 2021-22.pdf-
Cash Flow Statement 2021 - 2022File: 4 Cash Flow Statement FY 2021-22.pdf-
Auditor's Report 2022 - 2023File: 5 Auditors Report FY 2021-22.pdf-
Auditor's Report 2021 - 2022File: 5 Auditors Report FY 2021-22.pdf-
Auditor's Report 2020 - 2021File: 5 Auditors Report FY 2020-21.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

22 not delivered by the promised date5 under way, not due yet36 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
JSS 4TH SAGE BLOCK BMadapura Village andAragowdanahalli Village, VarunaHobli, Mysore Taluk, Mysore District.OngoingJun 2028Not due yet
KUBERANANDHASAGARA 12BMaidanahalli Village, Ilwala Hobli, Mysore Taluk & Mysore District.OngoingMar 2028Not due yet
Athmanandhasgara 6Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingJun 2027Not due yet
JSS 4TH STAGE BLOCK AMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingMar 2027Not due yet
SREE SAPTHAMATHRUKA 5 & NANDI NAGARAMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingOct 2026Not due yet
SHREE ENCLAVE MYSORE (iT PARK) 5Janthagalli Village, Varuna Hobli, Mysore Taluk and District.OngoingSep 2026Not delivered
Sukhanandhasagara 4Bommanhalli Village, Ilawala Hobli, Mysore Taluk & Mysore District.OngoingApr 2026Not delivered
Kuberanandhasagara Layout Phase 8Maidhanahalli Village, Ilawala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 3Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 2Maidhanahalli Village, Ilawala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 1Maidhanahalli Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout 11Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout 10Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 4Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 3Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 2Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 1Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara 5CNagawala Village, Ilwala Hobli ,Mysuru Taluk, Mysore District.OngoingDec 2024Not delivered
Athmanandhasagara 5BNagawala Village, Ilwala Hobli, Mysuru Taluk,OngoingDec 2024Not delivered
Athmanandhasagara 5ANagawala Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingDec 2024Not delivered
Shreesha Hill View Layout Phase 2Sarkari Utthanahalli Village, Varuna Hobli, Mysore Taluk and Mysore District.OngoingJan 2023Not delivered
Sree Sapthamathruka Layout Phase 4Marashettihalli Village, Varuna Hobli, Mysore Taluk, Mysore District.OngoingMay 2022Not delivered
Paramanandhasagara and Sukhanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Paramanandhasagara Layout Phase 2Huyilalu village, Ilwala hobli,, Mysore taluk & district.OngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 3Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 2Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Venkatagiri LayoutGoruru Village, Kasaba Hobli, Mysore Taluk, Mysore District.Completed-No date filed
Venkatadri LayoutBelawadi Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Svasthi RetreatMarashettihalli Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictCompleted-No date filed
Stavya LayoutHuyilalu Village, Ilawala Hobli,Mysore Taluk and Mysore District.Completed-No date filed
Sree Sapthamathruka Layout Phase 3Yandahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 2Yandahalli & Madapura Village,Varuna Hobli, Mysore Taluk and Mysore District.Completed-No date filed
Sree Sapthamathruka Layout Phase 1/AYandahalli Village, Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 1Yandahalli Village, Varuna Hobli, Mysore Taluk and Mysore District.Completed-No date filed
Sree Sapthamathruka 6Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Sree Sapthamathruka 1BMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictCompleted-No date filed
Sourish LayoutMadagalli Village, Ilawala Hobli,Mysore Taluk and Mysore District.Completed-No date filed
Silicon Echo City 2Belawadi Village, Ilwala Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Silicon Echo City 1Belawadi Village, Ilwala Hobli, Mysuru Taluk & Mysuru DistrictCompleted-No date filed

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep Saha Aspire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmSaha AspireOther 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED

ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED has 4 registrations on RERA Karnataka, including JSS 4TH STAGE BLOCK C and Nithyanandhasagara 4. Its filings declare 79 earlier projects, 45 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if Saha Aspire is delayed beyond 13 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Saha Aspire?

The registered promoter entity is ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED, a company as per the filing. Its CIN U70101KA2005PTC037964 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Saha Aspire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Saha Aspire?

The professionals named in the filing: Engineer: C B Lakshman Rao; Chartered Accountant: A Vishwanatha. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saha Aspire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saha Aspire. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saha Aspire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.