ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Sagacity Abode

Registered No litigation declared Residential / Group Housing project

Sagacity Abode

By Sagacity Buildcon Private Limited

RG-MH-98402 · RERA P52100080879 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 21 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 21 months from the original
10 of 11Construction stages donefurthest along: Installation of Lifts, 99%
12 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

Sagacity Abode is a Residential / Group Housing project by Sagacity Buildcon Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100080879 on 29 Jul 2025. Possession is promised by 31 Dec 2027. The completion date has moved by 21 months from the original filing. 0 of the 12 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSagacity Abode
  • TypeResidential / Group Housing
  • Location
    • Varale
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080879
  • ReraGenie IDRG-MH-98402

Builder

  • NameSagacity Buildcon Private Limited
  • Entity typeCompany

Key dates

this monthRegisteredJul 2025First promiseMar 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2025
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed47 files

Current status

0%0 of 12 units booked
99.2%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sagacity AbodeNA3312012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.

Sagacity Abode: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KING INDIA AVENUEPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI719.55
Proposed, not sanctioned720 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUPPER GROUND FLR SHOP NO 1├╜AND 15, BHAWANI COMPLEX MAIN SAGUNA KHAUGAUL RD, OPP RADIANT SCHOOL PO PS KHAGAUL PATNA, BIHAR 800015
Estimated costRs 4.38 cr
Cost incurredRs 4.34 cr
Work done99.16%
BuildingWingEstimatedIncurred
Sagacity AbodeNARs 2.19 crRs 2.17 cr
-NARs 2.19 crRs 2.17 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRavi Associates Madhav Yadav
EngineerM G ASSOCIATES
Chartered AccountantDEWASHISH DEEPAK & CO
PartnerRole in project
Sagacity Buildcon Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29072621915Mar 2026 → Dec 2027

Reason as filed by the promoterSince the promoter is in process of applying revision of floors, this extension is been sought.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jun 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf13 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf13 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf13 Mar 2026
Withdrawal Update Form 2File: FORM 2 _ENGINEER CERTIFICATE.pdf13 Mar 2026
Withdrawal Update Form 2File: FORM 2 _ENGINEER CERTIFICATE.pdf13 Mar 2026
Withdrawal Update Form 2File: FORM 2 _ENGINEER CERTIFICATE.pdf13 Mar 2026
Withdrawal Update Form 3File: CA CERTIFICATE_13032026.pdf13 Mar 2026
Withdrawal Update Form 3File: CA CERTIFICATE_13032026.pdf13 Mar 2026
Withdrawal Update Form 3File: CA CERTIFICATE_13032026.pdf13 Mar 2026
Other - LegalFile: saga city construction agreement (1)_compressed.pdf4 Jul 2025
Other - LegalFile: ilovepdf_merged (21).pdf4 Jul 2025
Other - LegalFile: saga city construction agreement_compressed.pdf27 Jun 2025
Copy of the legal title reportFile: title final saga city.pdf20 Jun 2025
Details of encumbrances concerned to FinanceFile: Financial Encumb.pdf20 Jun 2025
Details of encumbrances concerned to FinanceFile: Declaration of encumbrances concerned to Legal.pdf20 Jun 2025
Proforma of Allotment letterFile: Model_Proforma_Allotment_Letter.pdf20 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_FORM 3_22072025_1_compressed.pdf20 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: noc landowner.pdf20 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: RERA Mail Copy (1).pdf20 Jun 2025
Other - LegalFile: LANDOWNERS bANK ACCOUNT.pdf20 Jun 2025
Other - LegalFile: ANNEXURE A Declaration-Cum-Undertaking (1).pdf20 Jun 2025
Other - LegalFile: Explanation for Relation between Promoter Sagacity Buildcon Private Limited and More Devel20 Jun 2025
Declaration about Commencement CertificateFile: FORMAT D_COMMENCEMENT CERTIFICATE revised.pdf20 Jun 2025
Deviation Report with respect to Allotment letterFile: Deviation allotment.pdf20 Jun 2025
Details of encumbrances concerned to LegalFile: Financial Encumb.pdf20 Jun 2025
Details of encumbrances concerned to LegalFile: Declaration of encumbrances concerned to Legal.pdf20 Jun 2025
Deviation Report with respect to model copy of AgreementFile: Deviation ATS.pdf20 Jun 2025
Proforma of Agreement for saleFile: Model_Agreement_for_Sale_English.pdf20 Jun 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project (1).pdf20 Jun 2025
Other - TechnicalFile: ANNEXURE A Declaration-Cum-Undertaking (1).pdf21 Apr 2025
Other - FinanceFile: noc landowner.pdf19 Apr 2025
Layout approvalFile: Layout_compressed (2).pdf13 Apr 2025
Building plan approvalFile: Building Plan_compressed (1).pdf13 Apr 2025
PAN CardFile: PAN.pdf13 Apr 2025
Copy of Layout Approval (in case of layout)File: Layout_compressed (2).pdf13 Apr 2025
Declaration in FORM BFile: FORM B-PROMOTOR.pdf13 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate varale (1)_compressed.pdf13 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed (2).pdf13 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_compressed (1).pdf13 Apr 2025
CERSAI detailsFile: DECLARATION REGARDING REPORT FROM CERSAI.pdf13 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK.pdf13 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B BANK.pdf13 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest Roopali Devi.pdf26 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest Arti Arya.pdf26 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest Gaurav Kumar.pdf26 Mar 2025

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 21 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sagacity Abode on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Varale13,700+ in Pune

2 kmSagacity AbodeCompleted 30Lapsed / revoked 26Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: Sagacity Buildcon Private Limited

Sagacity Buildcon Private Limited has 1 registration on MahaRERA, including Sagacity Abode. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sagacity Abode is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sagacity Abode?

The registered promoter entity is Sagacity Buildcon Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sagacity Abode?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sagacity Abode?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sagacity Abode?

The professionals named in the filing: Architect: Ravi Associates Madhav Yadav; Engineer: M G ASSOCIATES; Chartered Accountant: DEWASHISH DEEPAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sagacity Abode?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sagacity Abode. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sagacity Abode to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.