SAFALYA HEIGHTS

By GAURAV VISHVANATH AWATI

RG-MH-19200 · RERA P52200078266 · Last updated on MahaRERA portal: 7 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
24 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

SAFALYA HEIGHTS is a Others project by GAURAV VISHVANATH AWATI in Ahmednagar, Maharashtra, registered with MahaRERA as P52200078266 on 4 Dec 2024. Possession was promised by 24 Aug 2026 and is now 2 months past that date. 16 of the 40 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAFALYA HEIGHTS
  • TypeOthers
  • Location
    • BEHIND ABHA CUISINE
    • KANDA MARKET ROAD
    • WARD NO. 06
    • Shrirampur (M Cl)
    • Shrirampur
    • Ahmednagar
    • 413709
  • Pincode413709
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52200078266
  • ReraGenie IDRG-MH-19200

Builder

  • NameGAURAV VISHVANATH AWATI
  • Entity typeIndividual
  • GSTIN27BHSPA7427H1Z3
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1
  • Declared earlier projects5 →

Key dates

2 months past promisethis monthRegisteredDec 2024PromisedAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion24 Aug 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

40%16 of 40 units booked
105.6%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WAGHNA99281240

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

WAGH: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,366 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Jul 2026
LandownerVillageDistrict
SANJAY RAMCHANDRA WAGHShrirampur (M Cl)Ahmednagar
REKHA SANJAY WAGHShrirampur (M Cl)Ahmednagar

Approvals and building plan

Sanctioning authoritySHRIRAMPUR MUNCIPAL COUNCIL
Permissible FSI3102.88
Proposed, not sanctioned3,103 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, JAIN STHANAKWASI SANGH,SANGAMNER ROAD , SHRIRAMPUR,DIST. AHMADNAGAR, MAHARASHTRA , PIN 413709.
Estimated costRs 3.05 cr
Cost incurredRs 3.22 cr
Work done105.58%
BuildingWingEstimatedIncurred
WAGHNARs 2.90 crRs 3.04 cr
-NARs 14.50 lakhRs 18.31 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SANDIP NANDKUMAR LOLAGE
EngineerER SAMARTH SONAWANE
Chartered AccountantSUVIDYA SOMANI
PartnerRole in project
GAURAV VISHVANATH AWATI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q1 APR JUNE 2026 SAFALYA HEIGHTS.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q1 APR JUNE 2026 SAFALYA HEIGHTS.pdf7 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q4 JAN MARCH 2026 SAFALYA HEIGHTS.pdf7 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q1 APR JUNE 2026 SAFALYA HEIGHTS.pdf7 Jul 2026
Withdrawal Update Form 3File: FORM 3 Q1 APR JUNE 2026 SAFALYA HEIGHTS.pdf7 Jul 2026
Withdrawal Update Form 3File: FORM 3 Q1 APR JUNE 2026 SAFALYA HEIGHTS.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q4 JAN MARCH 2026 SAFALYA HEIGHTS.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM 2 Q4 JAN MARCH 2026 SAFALYA HEIGHTS.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 JAN MARCH 2026 SAFALYA HEIGHTS.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM 1 Q3 OCT DEC 2025 SAFALYA HEIGHTS.pdf25 Jan 2026
Withdrawal Update Form 2File: FORM 2 Q3 OCT DEC 2025 SAFALYA HEIGHTS.pdf25 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q3 OCT DEC 2025 SAFALYA HEIGHTS.pdf25 Jan 2026
Withdrawal Update Form 1File: FORM 1 Q2 JULY SEP 2025 SAFALYA HEIGHTS.pdf15 Oct 2025
Withdrawal Update Form 2File: FORM 2 Q2 JULY SEP 2025 SAFALYA HEIGHTS.pdf15 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 JULY SEP 2025 SAFALYA HTS SCAN.pdf15 Oct 2025
Form 1File: FORM 1 Q2 JULY SEP 2025 SAFALYA HEIGHTS.pdf10 Oct 2025
Form 2File: FORM 2 Q2 JULY SEP 2025 SAFALYA HEIGHTS.pdf10 Oct 2025
Form 3File: FORM 3 Q2 JULY SEP 2025 SAFALYA HTS SCAN.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q2 JULY SEP 2025 SAFALYA HEIGHTS.pdf10 Oct 2025
Form 1File: FORM 1 Q3 2024 ARCHITECT CERTIFICATE SAFALYA HEIGHTS.pdf16 Jul 2025
Form 2File: FORM_2_Q3 2024 ENGINEER_CERTIFICATE_SAFALYA_HEIGHTS.pdf16 Jul 2025
Form 3File: FORM 3 Q3 OCT DEC 2024 SAFALYA HEIGHTS.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVRNTARY Q3 OCT - DEC 2024 SAFALYA HTS.pdf16 Jul 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE JAN-MAR 2025 Q4 SCAN SAFALYA HTS.pdf16 Jul 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE JAN-MAR 2025 Q4 SCAN SAFALYA HTS_compressed.pdf16 Jul 2025
Form 3File: FORM 3 Q4 JAN-MAR 2025 SCAN SAFALYA HEIGHTS_compressed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTARY Q4 SAFALYA HTS.pdf16 Jul 2025
Form 1File: FORM 1 Q1 APR JUNE 2025 SAFALYA HEIGHTS.pdf16 Jul 2025
Form 2File: FORM 2 Q1 APR JUNE 2025 SAFALYA HEIGHTS.pdf16 Jul 2025
Form 3File: FORM 3 Q1 APR JUNE 2025 SAFALYA HTS SCAN_compressed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q1 APR JUNE 2025 SAFALYA HEIGHTS.pdf16 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SAFALYA HEIGHTS 2024-25 SCAN.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 JAN-MAR 2025 SCAN SAFALYA HEIGHTS_compressed.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE JAN-MAR 2025 Q4 SCAN SAFALYA HTS_compressed.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE JAN-MAR 2025 Q4 SCAN SAFALYA HTS_compressed.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTARY Q4 SAFALYA HTS.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 2024 ARCHITECT CERTIFICATE SAFALYA HEIGHTS.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 OCT DEC 2024 SAFALYA HEIGHTS.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_Q3 2024 ENGINEER_CERTIFICATE_SAFALYA_HEIGHTS.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVRNTARY Q3 OCT - DEC 2024 SAFALYA HTS.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 2024 ARCHITECT CERTIFICATE SAFALYA HEIGHTS.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 OCT DEC 2024 SAFALYA HEIGHTS.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_Q3 2024 ENGINEER_CERTIFICATE_SAFALYA_HEIGHTS.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVRNTARY Q3 OCT - DEC 2024 SAFALYA HTS.pdf25 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf22 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SAFALYA HEIGHTS _1 (8 files merged).pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SAFALYA HEIGHTS _1 (8 files merged).pdf21 Nov 2024
Other - LegalFile: POWER.pdf17 Nov 2024
Other - LegalFile: POWER.pdf17 Nov 2024
Layout approvalFile: PLAN.pdf16 Nov 2024
Layout approvalFile: PLAN.pdf16 Nov 2024
PAN CardFile: PAN NEW.pdf16 Nov 2024
Copy of the legal title reportFile: title report.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: PLAN.pdf16 Nov 2024
Proforma of Allotment letterFile: ALLOTMENT DRAFT new.pdf16 Nov 2024
Declaration in FORM BFile: 1 Declaration in FORM B (9).pdf16 Nov 2024
Declaration about Commencement CertificateFile: declaration about comm cert.pdf16 Nov 2024
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf16 Nov 2024
Other - TechnicalFile: ANNEXURE A.pdf16 Nov 2024
Other - TechnicalFile: cc mail.pdf16 Nov 2024
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf16 Nov 2024
Proforma of Agreement for saleFile: New Sale Agreement Done.pdf16 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf16 Nov 2024
Declaration about Commencement CertificateFile: declaration about comm cert.pdf16 Nov 2024
Declaration in FORM BFile: 1 Declaration in FORM B (9).pdf16 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf16 Nov 2024
PAN CardFile: PAN NEW.pdf16 Nov 2024
Copy of the legal title reportFile: title report.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: PLAN.pdf16 Nov 2024
Other - TechnicalFile: ANNEXURE A.pdf16 Nov 2024
Other - TechnicalFile: cc mail.pdf16 Nov 2024
Proforma of Allotment letterFile: ALLOTMENT DRAFT new.pdf16 Nov 2024
Proforma of Agreement for saleFile: New Sale Agreement Done.pdf16 Nov 2024
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf16 Nov 2024
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf16 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: RERA_DISCLOSURE_FINANCE_AVAILED_SAFALYA_HEIGHTS.pdf29 Jul 2024
Building plan approvalFile: SANCTION_PLAN_SAFALYA_HEIGHTS.pdf14 Jul 2024
Details of encumbrances concerned to FinanceFile: RERA_ENCUMBRANCE_CERTIFICATE_SCAN_SAFALYA_HEIGHTS.pdf14 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA_FORM_1_SCAN_SAFALYA_HEIGHTS.pdf14 Jul 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ATHARVA HEIGHTSNEAR SHELAKE HOSPITAL KANDA MARKET ROAD SHRIRAMPUR-413709.16CompletedOct 2024May 2023
SAI VISHWAGOVIND NAGAR UTSAV MANGAL KARYALAY ROAD WARD NO. 07 SHRIRAMPUR - 41370940CompletedSep 2023Apr 2023
MADHUKOSH HEIGHTSOPP. VIJAY HOTEL WARD NO. 07 SHRIRAMPUR-413709.24CompletedAug 2023Aug 2021
PRIDE PARKNIWARA HOUSING SOCIETY WARD NO. 07 SHRIRAMPUR-413709.32CompletedApr 2023Apr 2022
MADHUBAN APARTMENTNEAR THATTE GROUND16CompletedApr 2021Aug 2019

How this compares with Ahmednagar

40%of this project is bookeddistrict median 10%
7%of Ahmednagar projects moved their completion datethis one has not
28%of Ahmednagar registrations have lapsed or been cancelledthis one is on the register

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep SAFALYA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WARD NO. 06490+ in Ahmednagar

2 kmSAFALYA HEIGHTSCompleted 14Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: GAURAV VISHVANATH AWATI

GAURAV VISHVANATH AWATI has 2 registrations on MahaRERA, including SAFALYA HEIGHTS and SATYABHAMA TOWERS. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What are my rights if SAFALYA HEIGHTS is delayed beyond 24 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAFALYA HEIGHTS?

The registered promoter entity is GAURAV VISHVANATH AWATI, an individual as per the filing. Its GSTIN 27BHSPA7427H1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAFALYA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAFALYA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAFALYA HEIGHTS?

The professionals named in the filing: Architect: AR SANDIP NANDKUMAR LOLAGE; Engineer: ER SAMARTH SONAWANE; Chartered Accountant: SUVIDYA SOMANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAFALYA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAFALYA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAFALYA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.