SADGURU AVENUE

By SADGURU KRUPA DEVELOPERS

RG-MH-53181 · RERA P51800045763 · Last updated on MahaRERA portal: 25 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
3 of 33Construction stages doneacross 3 buildings; furthest along: Plinth, 98%
40 of 132Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

SADGURU AVENUE is a Others project by SADGURU KRUPA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045763 on 9 Jun 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 92 of the 132 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSADGURU AVENUE
  • TypeOthers
  • Location
    • shiv Vallabh road at Dahisar East
    • DAHISAR EAST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • RERA no.P51800045763
  • ReraGenie IDRG-MH-53181

Builder

  • NameSADGURU KRUPA DEVELOPERS
  • Entity typePartnership
  • GSTIN27ACUFS2010G1ZZ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRANJEETSINH GOHIL, SHAURYASINH GOHIL
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings3 building records
  • Documents filed97 files

Current status

70%92 of 132 units booked
77.1%Work done, per cost certificate

Figures as on 25 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SADGURU AVENUE C WINGNA141410414
SADGURU AVENUE B WINGNA151515015
SADGURU AVENUE A WINGNA15153469103

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 98%.

SADGURU AVENUE C WING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth98%
Stilt Floor97%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
SADGURU AVENUE B WING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth98%
Stilt Floor97%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
SADGURU AVENUE A WING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth98%
Stilt Floor97%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%

Progress on shared amenities15

As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes45%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Closed/Covered128
BuildingClosed/CoveredTotal
SADGURU AVENUE C WING4242
SADGURU AVENUE B WING4343
SADGURU AVENUE A WING4343

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,729 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Aug 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10789.72
Proposed, not sanctioned10,790 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBORIVALI WEST
Estimated costRs 68.56 cr
Cost incurredRs 52.85 cr
Work done77.09%
BuildingWingEstimatedIncurred
SADGURU AVENUE C WINGNARs 18.16 crRs 17.62 cr
SADGURU AVENUE B WINGNARs 18.16 crRs 17.62 cr
SADGURU AVENUE A WINGNARs 18.16 crRs 17.62 cr
-NARs 14.08 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARIVARTAN ARCHITECTS & ENGINEERS
ArchitectNiten Premchand Dedhia
EngineerB D KULKARNI
EngineerSubhash Nath
EngineerBD Kulkarni
Chartered AccountantABHISHEK CHOUDHARY
Chartered AccountantAbhishek Chaudhary
Chartered Accountantdilipkumar choudhary
PartnerRole in project
SADGURU KRUPA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10092502552Dec 2025 → Dec 2026

Reason as filed by the promoterWe, Mis Sadguru Krupa Developers, are the promoters of the real estate project known as "Sadguru Avenue" bearing MahaRERA Registration No. P51800045763. The approval for concession from Hon'ble Municipal Commissioner were granted and accordingly IOD & CC issued for proposed building comprising of Wing A and B Ground 1 to 14th Floors and Wing C Ground + 1 to 12 floor. Thereafter BMC allowed additional FSI as per regulation under 33(20) (b) of DCPR 2034 for development of AH/R &R on our property, due to some ambiguity in regulation and delay for such policy of clearance by competent authority Th

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504193Laxman ramchandra KulapkarSADGURU KRUPA DEVELOPERS26/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Avenue Form 1 Q-1-FY 26-27.pdf25 Jul 2026
Withdrawal Update Form 2File: Avenue- Form 2 Q-1 FY 26-27.pdf25 Jul 2026
Withdrawal Update Form 3File: Avenue_FORM 3- Q1 FY 26-27.pdf25 Jul 2026
Form 5 (FY 2025-2026)File: Form 5.pdf8 May 2026
Form 2A (FY 2025-2026)File: form 2A.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 (1).pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf16 Mar 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf16 Mar 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf16 Mar 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf16 Mar 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf16 Mar 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf16 Mar 2026
Withdrawal Update Form 3File: Form 3 Q2.pdf16 Mar 2026
Withdrawal Update Form 3File: Form 3 Q2.pdf16 Mar 2026
Withdrawal Update Form 3File: Form 3 Q2.pdf16 Mar 2026
Form 5 (FY 2024-2025)File: form5skd (1) (1).pdf25 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf24 Sep 2025
Withdrawal Update Form 1File: form 1 june 25.pdf10 Sep 2025
Withdrawal Update Form 2File: form 2 june 25 NEW.pdf10 Sep 2025
Withdrawal Update Form 3File: form 3 june 25.pdf10 Sep 2025
FORM - 129 Apr 2025
Form 229 Apr 2025
Proforma of Agreement for saleFile: FINAL RERA AGREEMENT.pdf29 Apr 2025
Layout approvalFile: IOD Drawing 1-3.pdf4 Mar 2025
Layout approvalFile: IOD Drawing 4-6.pdf4 Mar 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing 1-3.pdf4 Mar 2025
Copy of Layout Approval (in case of layout)File: IOD Drawing 4-6.pdf4 Mar 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf4 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 2449052_FurtherCC_signed.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory (2).pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 - Q2.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 - Q2.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 - Q2.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SADGURU Architect.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 q1 fy 2023-24.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf27 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Shaurysinh Gohil Interest Disclosure.pdf27 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ranjeetsinh Gohil Interest Disclosure.pdf27 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account declaration.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf16 Apr 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf6 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate .pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf15 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM522-23.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Q2.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2sadguru_sep23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- CA CERTIFICATE-2.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 - Q2.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 june23.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 20231014181655.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1JUN23.pdf25 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final form3.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKD-FORM 1.pdf28 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKD-FORM 2.pdf28 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKD-FORM 3.pdf28 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ref No C 5309S ADGURU FORM 2.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate of Architect - Form 1 (1).pdf16 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- CA CERTIFICATE pdf (1).pdf16 Mar 2023
Layout approvalFile: Drawing iod.pdf13 Feb 2023
Copy of Layout Approval (in case of layout)File: Drawing iod.pdf13 Feb 2023
Building plan approvalFile: 2356267Amendletter_signed.pdf10 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 2356267Amendletter_signed.pdf10 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 8514 FurtherCC_signed.pdf10 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200238339530_For_Asset_Based_Search_27_05_2022_18_58_59_314.pdf27 May 2022
Proforma of Allotment letterFile: FINAL RERA AGREEMENT (2).pdf27 May 2022

How this compares with Mumbai Suburban

70%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SADGURU AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR EAST6,700+ in Mumbai Suburban

Builder: SADGURU KRUPA DEVELOPERS

SADGURU KRUPA DEVELOPERS has 2 registrations on MahaRERA, including SADGURU AVENUE and SADGURU TRIMURTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SADGURU AVENUE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SADGURU AVENUE?

The registered promoter entity is SADGURU KRUPA DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACUFS2010G1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SADGURU AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SADGURU AVENUE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SADGURU AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SADGURU AVENUE?

The professionals named in the filing: Architect: PARIVARTAN ARCHITECTS & ENGINEERS; Architect: Niten Premchand Dedhia; Engineer: B D KULKARNI; Engineer: Subhash Nath; Engineer: BD Kulkarni; Chartered Accountant: ABHISHEK CHOUDHARY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SADGURU AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SADGURU AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SADGURU AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.