Home / Browse projects / Mumbai Suburban, Maharashtra / SADGURU AVENUE
SADGURU AVENUE
RG-MH-53181 · RERA P51800045763 · Last updated on MahaRERA portal: 25 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SADGURU AVENUE is a Others project by SADGURU KRUPA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045763 on 9 Jun 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 92 of the 132 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSADGURU AVENUE
- TypeOthers
- Location
- shiv Vallabh road at Dahisar East
- DAHISAR EAST
- Borivali
- Mumbai Suburban
- 400068
- Pincode400068
- RERA no.P51800045763
- ReraGenie IDRG-MH-53181
Builder
- NameSADGURU KRUPA DEVELOPERS
- Entity typePartnership
- GSTIN27ACUFS2010G1ZZ
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersRANJEETSINH GOHIL, SHAURYASINH GOHIL
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Jun 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings3 building records
- Documents filed97 files
Current status
Figures as on 25 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SADGURU AVENUE C WING | NA | 14 | 14 | 10 | 4 | 14 |
| SADGURU AVENUE B WING | NA | 15 | 15 | 15 | 0 | 15 |
| SADGURU AVENUE A WING | NA | 15 | 15 | 34 | 69 | 103 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 98%.
SADGURU AVENUE C WING78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 98% |
| Stilt Floor | 97% |
| Slabs of Super Structure | 98% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 96% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
SADGURU AVENUE B WING78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 98% |
| Stilt Floor | 97% |
| Slabs of Super Structure | 98% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 96% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
SADGURU AVENUE A WING78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 98% |
| Stilt Floor | 97% |
| Slabs of Super Structure | 98% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 96% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
Progress on shared amenities15
As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 45% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 65% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed128
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SADGURU AVENUE C WING | 42 | 42 |
| SADGURU AVENUE B WING | 43 | 43 |
| SADGURU AVENUE A WING | 43 | 43 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SADGURU AVENUE C WING | NA | Rs 18.16 cr | Rs 17.62 cr |
| SADGURU AVENUE B WING | NA | Rs 18.16 cr | Rs 17.62 cr |
| SADGURU AVENUE A WING | NA | Rs 18.16 cr | Rs 17.62 cr |
| - | NA | Rs 14.08 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARIVARTAN ARCHITECTS & ENGINEERS |
| Architect | Niten Premchand Dedhia |
| Engineer | B D KULKARNI |
| Engineer | Subhash Nath |
| Engineer | BD Kulkarni |
| Chartered Accountant | ABHISHEK CHOUDHARY |
| Chartered Accountant | Abhishek Chaudhary |
| Chartered Accountant | dilipkumar choudhary |
| Partner | Role in project |
|---|---|
| SADGURU KRUPA DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, Mis Sadguru Krupa Developers, are the promoters of the real estate project known as "Sadguru Avenue" bearing MahaRERA Registration No. P51800045763. The approval for concession from Hon'ble Municipal Commissioner were granted and accordingly IOD & CC issued for proposed building comprising of Wing A and B Ground 1 to 14th Floors and Wing C Ground + 1 to 12 floor. Thereafter BMC allowed additional FSI as per regulation under 33(20) (b) of DCPR 2034 for development of AH/R &R on our property, due to some ambiguity in regulation and delay for such policy of clearance by competent authority Th
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504193 | Laxman ramchandra Kulapkar | SADGURU KRUPA DEVELOPERS | 26/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Avenue Form 1 Q-1-FY 26-27.pdf | 25 Jul 2026 |
| Withdrawal Update Form 2File: Avenue- Form 2 Q-1 FY 26-27.pdf | 25 Jul 2026 |
| Withdrawal Update Form 3File: Avenue_FORM 3- Q1 FY 26-27.pdf | 25 Jul 2026 |
| Form 5 (FY 2025-2026)File: Form 5.pdf | 8 May 2026 |
| Form 2A (FY 2025-2026)File: form 2A.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 Q3.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Q3.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Q3.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 (1).pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Q2.pdf | 16 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Q2.pdf | 16 Mar 2026 |
| Form 5 (FY 2024-2025)File: form5skd (1) (1).pdf | 25 Sep 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A.pdf | 24 Sep 2025 |
| Withdrawal Update Form 1File: form 1 june 25.pdf | 10 Sep 2025 |
| Withdrawal Update Form 2File: form 2 june 25 NEW.pdf | 10 Sep 2025 |
| Withdrawal Update Form 3File: form 3 june 25.pdf | 10 Sep 2025 |
| FORM - 1 | 29 Apr 2025 |
| Form 2 | 29 Apr 2025 |
| Proforma of Agreement for saleFile: FINAL RERA AGREEMENT.pdf | 29 Apr 2025 |
| Layout approvalFile: IOD Drawing 1-3.pdf | 4 Mar 2025 |
| Layout approvalFile: IOD Drawing 4-6.pdf | 4 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: IOD Drawing 1-3.pdf | 4 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: IOD Drawing 4-6.pdf | 4 Mar 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 4 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2449052_FurtherCC_signed.pdf | 25 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf | 24 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory (2).pdf | 15 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 13 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 - Q2.pdf | 12 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 - Q2.pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 - Q2.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SADGURU Architect.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 q1 fy 2023-24.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 27 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Shaurysinh Gohil Interest Disclosure.pdf | 27 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ranjeetsinh Gohil Interest Disclosure.pdf | 27 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account declaration.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 16 Apr 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 6 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate .pdf | 5 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf | 15 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM522-23.pdf | 5 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Q2.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2sadguru_sep23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- CA CERTIFICATE-2.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 - Q2.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 june23.pdf | 16 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 20231014181655.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1JUN23.pdf | 25 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final form3.pdf | 25 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKD-FORM 1.pdf | 28 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKD-FORM 2.pdf | 28 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKD-FORM 3.pdf | 28 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ref No C 5309S ADGURU FORM 2.pdf | 8 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate of Architect - Form 1 (1).pdf | 16 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- CA CERTIFICATE pdf (1).pdf | 16 Mar 2023 |
| Layout approvalFile: Drawing iod.pdf | 13 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Drawing iod.pdf | 13 Feb 2023 |
| Building plan approvalFile: 2356267Amendletter_signed.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2356267Amendletter_signed.pdf | 10 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 8514 FurtherCC_signed.pdf | 10 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200238339530_For_Asset_Based_Search_27_05_2022_18_58_59_314.pdf | 27 May 2022 |
| Proforma of Allotment letterFile: FINAL RERA AGREEMENT (2).pdf | 27 May 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SADGURU AVENUE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAHISAR EAST6,700+ in Mumbai Suburban
ICON
RAGHU LEELA REALTORS PRIVATE LIMITED
ORNATE SOLITAIRE
ORNATE DAHISAR DEVELOPERS
EMPIRE HEIGHTS
EMPIRE REALTY
SHAKTI DHAM-WING A, VRINDAVAN-WING B RESIDENTI
DHARTI DEVELOPERS
RAGHUKUL CHSL
RAMNIYATI REALITIES LLP
Earth Residency Wing C and Wing D
Earth Estate Developers Pvt Ltd
See every Mumbai Suburban project, with the district possession charts
Builder: SADGURU KRUPA DEVELOPERS
SADGURU KRUPA DEVELOPERS has 2 registrations on MahaRERA, including SADGURU AVENUE and SADGURU TRIMURTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SADGURU AVENUE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SADGURU AVENUE?
The registered promoter entity is SADGURU KRUPA DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACUFS2010G1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SADGURU AVENUE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SADGURU AVENUE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SADGURU AVENUE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SADGURU AVENUE?
The professionals named in the filing: Architect: PARIVARTAN ARCHITECTS & ENGINEERS; Architect: Niten Premchand Dedhia; Engineer: B D KULKARNI; Engineer: Subhash Nath; Engineer: BD Kulkarni; Chartered Accountant: ABHISHEK CHOUDHARY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SADGURU AVENUE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback