Home / Browse projects / Mumbai Suburban, Maharashtra / S N sahayog CHSL
S N sahayog CHSL
RG-MH-20591 · RERA P51800008921 · Last updated on MahaRERA portal: 5 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 24 months past the filed date
- Completion date moved by 31 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
S N sahayog CHSL is a Residential / Group Housing project by umang construction co in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008921 on 19 Aug 2017. Possession was promised by 15 Oct 2024 and is now 24 months past that date. The completion date has moved by 31 months from the original filing.
At a glance
Project
- NameS N sahayog CHSL
- TypeResidential / Group Housing
- Location
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800008921
- ReraGenie IDRG-MH-20591
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion15 Oct 2024
- Revised completionRevised to 15 Oct 2024 (originally 30 Mar 2022)
- Buildings2 building records
- Documents filed99 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| S N sahayog CHSL phase 1 | NA | 16 | 0 | 0 | 0 | 0 |
| S N sahayog CHSL phase 2 | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 5 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
S N sahayog CHSL phase 1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
S N sahayog CHSL phase 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| umang construction co | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | abhijit a mehta |
| Engineer | Ellora structural consultant |
| Partner | Role in project |
|---|---|
| umang construction co | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 1 AR q2 23.pdf | 5 Jun 2025 |
| Form 2File: 1 ER Q2 23.pdf | 5 Jun 2025 |
| Form 3File: 1 CA Sept 23.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 Sept 23.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 1 AR q2 23.pdf | 5 Jun 2025 |
| Form 1File: 2 AR Q3 23.pdf | 5 Jun 2025 |
| Form 2File: 2 ER Q3 23.pdf | 5 Jun 2025 |
| Form 3File: 2 CA Dec 23.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 Dec 23.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 2 AR Q3 23.pdf | 5 Jun 2025 |
| Form 1File: 3 AR Q4 24.pdf | 5 Jun 2025 |
| Form 2File: 3 ER Q4 24.pdf | 5 Jun 2025 |
| Form 3File: 3 CA Mar 24.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Mar 24.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 3 AR Q4 24.pdf | 5 Jun 2025 |
| Form 1File: 4 AR Q1 24.pdf | 5 Jun 2025 |
| Form 2File: 4 ER Q1 24.pdf | 5 Jun 2025 |
| Form 3File: 4 CA June 24.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 June 24.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 4 AR Q1 24.pdf | 5 Jun 2025 |
| Form 1File: 5 AR Q2 24.pdf | 5 Jun 2025 |
| Form 2File: 5 ER Q2 24.pdf | 5 Jun 2025 |
| Form 3File: 5 CA Sept 24.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Sept 24.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 5 AR Q2 24.pdf | 5 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 23 Sahyog.pdf | 28 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 23 Sahyog.pdf | 28 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate sahyog March 23 (2).pdf | 28 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate sahyog June 23 (2).pdf | 28 Nov 2023 |
| Certificates of CA (Form 3)File: 1 CA Certificate-MARCH 23.pdf | 28 Nov 2023 |
| Certificates of CA (Form 3)File: 2 CA Certificate-June 23.pdf | 28 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: S N Sahayog CHSL Inventory.pdf | 4 Aug 2023 |
| PAN CardFile: Umang Construction Co Pan Card.pdf | 10 Apr 2023 |
| Declaration about Commencement CertificateFile: Form D-S N Sahayog Chl_1 (2 files merged).pdf | 27 Mar 2023 |
| Certificates of CA (Form 3)File: 9 CA Certificate-Form 3 30 06 2022.pdf | 10 Mar 2023 |
| Certificates of CA (Form 3)File: 10 CA Certificate-Form 3 30 09 2022.pdf | 10 Mar 2023 |
| Certificates of CA (Form 3)File: 11 CA Certificate-Form 3 31 12 2022.pdf | 10 Mar 2023 |
| Certificates of CA (Form 3)File: CA June 21.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: CA Dec 21.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: CA Mar 17.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: CA Mar 22.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: CA Mar 21.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: CA Mar 20.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: CA Mar 18.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: CA Mar 19.pdf | 28 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: umang construction RA 19-20.pdf | 28 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: umang construction RA 20-21.pdf | 28 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: umang construction RA 21-22.pdf | 28 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 31 03 2018.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 31 03 2019.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 31 03 2020.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 31 03 2021.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 30 06 2021.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 30 09 2021.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 30 12 2021.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 31 03 2022.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 30 06 2022.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 30 09 2022.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 31 12 2022.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA 06 02 2023.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 3132018.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 3132019.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 3132020.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 3132021.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 30062021.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 30092021.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 31122021.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 31032022.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 30062022.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 30092022.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 31122022.pdf | 9 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Site Supervisor Certificate 3.pdf | 9 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site Supervisor Certificate 4.pdf | 9 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Site Supervisor Certificate 5.pdf | 9 Feb 2023 |
| Other - TechnicalFile: Prvin Kumar Jain.pdf | 9 Feb 2023 |
| Other - TechnicalFile: Site Supervisor Certificate 1.pdf | 9 Feb 2023 |
| Other - TechnicalFile: Site Supervisor Certificate 2.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Umang RERA Audit 18-19.pdf | 8 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5)File: Umang Construction Co Form 5 rera 2017-18.pdf | 3 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: Umang Construction Co Form 5 Rera 2018-19.pdf | 3 Oct 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shastri Nagar West View CHS LtdP51800028563 | Shastri Nagar, Mumbai Suburban | Mar 2021 | Completed | Jun 2026 | Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep S N sahayog CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 336 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: umang construction co
umang construction co has 2 registrations on MahaRERA, including S N sahayog CHSL and Shastri Nagar West View CHS Ltd. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that S N sahayog CHSL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if S N sahayog CHSL is delayed beyond 15 Oct 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of S N sahayog CHSL?
The registered promoter entity is umang construction co, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in S N sahayog CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for S N sahayog CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at S N sahayog CHSL?
The professionals named in the filing: Architect: abhijit a mehta; Engineer: Ellora structural consultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in S N sahayog CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback