Home / Browse projects / Ruparel Regalia
Ruparel Regalia
By Shree Siddhivinayak Classic Construction
RG-MH-83575 · RERA P51900009359 · Last updated on MahaRERA portal: 28 Oct 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 79 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ruparel Regalia is a Residential / Group Housing project by Shree Siddhivinayak Classic Construction in GTB Nagar, 400022, registered with MahaRERA as P51900009359 on 22 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 79 complaints are on record with the regulator.
At a glance
Project
- NameRuparel Regalia
- TypeResidential / Group Housing
- Location
- GTB road
- GTB Nagar
- 400022
- Pincode400022
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900009359
- ReraGenie IDRG-MH-83575
Builder
- NameShree Siddhivinayak Classic Construction
- Entity typeCompany
- CINU45200MH2013PTC245154
- DirectorsAmit Ruparel, Parikshit Sharma, Pradeep Ahire
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Aug 2017
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed32 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ruparel Regalia | NA | 25 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Ruparel Regalia: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed168
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Prarthana Developers | Mumbai City | Mumbai City |
| Shree Siddhivinayak Classic Construction Pvt.Ltd. | - | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Rahul Kamathi Kamathi |
| Engineer | Sanjeev Sinha |
| Chartered Accountant | Sarveshwar Sharma |
| Chartered Accountant | Shereena Jacob |
| Partner | Role in project |
|---|---|
| Shree Siddhivinayak Classic Construction pvt Ltd | - |
Complaints filed with MahaRERA79
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000192635 | Rohit Raghunath Barot & Sudha rohit Barot | Shree Sukhalarta develoers Private Limited & ors. | 18/02/2020 |
| CC006000000397969 | Raghunath Barot | M/s Shree Sukhkarta Developers Pvt Ltd | 25/10/2023 |
| CC006000000195231 | Mohit Deepak Mehra | Amit Mahendra Ruparel | 19/12/2020 |
| CC006000000196114 | Harsh Nilesh Chheda | Shree Siddhivinayak Classic Construction Pvt Ltd | 03/03/2021 |
| CC006000000591123 | Rishikesh Yashwant Mane | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591007 | Akash Anand | Shree Sidhhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591073 | Umashankar Gupta | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591074 | Umashankar Gupta | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591078 | Vallabh Jagtap | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591084 | Abrar Ahmed Maqsood Ali Ansari | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591117 | Vilas Rajdeo Rajbhar | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591083 | Yeshwant Rajdeo Rajbhar | Shree Siddhivinayak Classic Constrution Private Limited | 11/07/2024 |
| CC006000000591080 | Sudhir Kashinath Hedaoo | Shree Siddhivinayak Classic Construction Private Limitedn | 11/07/2024 |
| CC006000000591087 | Nazmeen Bashir Lunje | Shree Sidhhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591035 | Pankaj Kanji Bhanushali | Shree Siddhivinayak Classic Constrution Private Limited | 11/07/2024 |
| CC006000000591140 | Anil K Anabatulla | Shree Siddhivinayak Classic Construction Private Limited | 12/07/2024 |
| CC006000000591022 | Ruksana Shabbir Haveliwala | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591086 | Mamta A Bodele | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591129 | Pooja Nagesh Gujjeti | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591125 | Sandesh Vinod Jaiswal | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591021 | Vikas Rajdeo Rajbhar | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591079 | Smita Rupesh Patil | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591081 | Ramnik Singh Kocher | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591082 | Jashpreet singh Kocher | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591124 | Thilaga Fernando | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC006000000591131 | Dilip Parshuram Kamble | Shree Siddhivinayak Classic Construction Private Limited | 11/07/2024 |
| CC12504498 | Thirumalesh Rajamoli Gulle | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 16/12/2025 |
| CC12400622 | Shailendra Madhusudan Kharche | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 31/10/2024 |
| CC12400621 | Medha Anil Nawar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 31/10/2024 |
| CC12400623 | Swastik Ashok Yadav | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 31/10/2024 |
| CC12400624 | Vaibhavkumar Shambahadur yadav | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 31/10/2024 |
| CC12400625 | Swapnil Prakash Patil | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 31/10/2024 |
| CC12400626 | Uttamkumar Bhikshapati Bitla | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 31/10/2024 |
| CC12401189 | Abhishek Sunil Moorjani | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 21/12/2024 |
| CC12500193 | Manish Nandkumar Ghag | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 21/01/2025 |
| CC12500196 | Ramu Anand Sanchu | Shree Siddhivinayak Classic Construction Private Limited | 21/01/2025 |
| CC12500201 | Darshan Gangaram Adulkar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 21/01/2025 |
| CC12500228 | Rupesh Raju Gupta | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 23/01/2025 |
| CC12500231 | Rupesh Raju Gupta | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 23/01/2025 |
| CC12500240 | Sharanya Santaan Naidu | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 23/01/2025 |
| CC12500266 | Amit Vijay Karkhanis | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 25/01/2025 |
| CC12500268 | Abhishek Malay Kumar Chakrabarti | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 25/01/2025 |
| CC12500276 | Kiran Liladhar Patel | Shree Siddhivinayak Classic Construction Private Limited | 25/01/2025 |
| CC12500368 | Sadashiv Raghunath Shetye | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 03/02/2025 |
| CC12500434 | Abhijeet Pratapsingh Pawar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 10/02/2025 |
| CC12500452 | Nagraju Ashok Dharna | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 11/02/2025 |
| CC12500474 | Padma Vasista Yemberi | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 12/02/2025 |
| CC12500511 | Sampada Yogesh Natekar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 14/02/2025 |
| CC12500516 | Imran Siraj Khan | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 15/02/2025 |
| CC12500567 | Prashant Vishwanath Mhatre | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 18/02/2025 |
| CC12500588 | Raj Mahesh Kandalkar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 20/02/2025 |
| CC12500589 | Laxmi Narayana Gardas | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 20/02/2025 |
| CC12500601 | Yadnesh Pravin Kolhe | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 21/02/2025 |
| CC12500607 | Trushant Anant Ghanate | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 21/02/2025 |
| CC12500613 | Samrat Shivaji Vemula | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 22/02/2025 |
| CC12500614 | Samrat Shivaji Vemula | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 22/02/2025 |
| CC12500627 | Chandrashekhar Ramchandra Urankar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 22/02/2025 |
| CC12500626 | Dipti Amit Chilekar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 22/02/2025 |
| CC12500761 | Ravindra Sawlaram Gaikwad | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 06/03/2025 |
| CC12500772 | Maruti Reuba Pawar | SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | 07/03/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Mar 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Mar 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed32
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: Ruparel Rgalia Details of encumbrances.pdf | 28 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Ruparel Rgalia Details of encumbrances.pdf | 28 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Regalia 19-20_signed.pdf | 15 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Regalia 20-21_signed.pdf | 15 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Regalia 21-22_signed.pdf | 15 Dec 2023 |
| CERSAI detailsFile: CERSAI REPORT RUPAREL REGALIA.pdf | 4 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Regalia_Form5_FY19-20.pdf | 27 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Regalia_Form5_FY20-21.pdf | 27 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Regalia_Form 5_FY 21-22.pdf | 27 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-Regalia.pdf | 22 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Regalia CC.pdf | 29 Jun 2021 |
| Details of encumbrancesFile: Encumbrance-SSCCPL.pdf | 10 Dec 2020 |
| Building plan approvalFile: IOA-Regalia.pdf | 6 Mar 2020 |
| Layout approvalFile: Lay Out.pdf | 6 Mar 2020 |
| PAN CardFile: PAN of SSCCPL.pdf | 6 Mar 2020 |
| Copy of Layout Approval (in case of layout)File: Lay Out.pdf | 6 Mar 2020 |
| Building Plan Approval (IOD)File: IOA-Regalia.pdf | 6 Mar 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-regalia.pdf | 6 Mar 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Regalia.pdf | 2 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: Regalia.pdf | 16 Sep 2019 |
| Layout approvalFile: Layout Plan.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD.pdf | 31 Jul 2017 |
| PAN CardFile: SSDPL PAN.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Title Regalia.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Nil Encumbrance.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Form B.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Regalia.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA Regalia.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Agreement.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 32 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Ruparel Regalia on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GTB Nagar
Filed coordinates, straight-line distance. 64 registered projects within 2 km.
KINGS MY HOMES
Nilesh Laxmikant Kudalkar
RUNWAL TIMELESS
RUNWAL DEVELOPERS LIMITED
PROMONT
Sheth Smarthomes LLP
Proposed Redevelopment of existing Transit Cam
Maharashtra Housing and Area Development A
RAUNAK CENTRUM - A
Raunak Jigna Associates
SHIKARA HEIGHTS Phase-I
Shikara Constructions Pvt. Ltd.
Builder: Shree Siddhivinayak Classic Construction
Shree Siddhivinayak Classic Construction has 1 registration on MahaRERA, including Ruparel Regalia. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What does it mean that Ruparel Regalia shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Ruparel Regalia is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ruparel Regalia?
The registered promoter entity is Shree Siddhivinayak Classic Construction, a company as per the filing. Its CIN U45200MH2013PTC245154 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ruparel Regalia?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ruparel Regalia?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ruparel Regalia?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ruparel Regalia?
The professionals named in the filing: Architect: Mr Rahul Kamathi Kamathi; Engineer: Sanjeev Sinha; Chartered Accountant: Sarveshwar Sharma; Chartered Accountant: Shereena Jacob. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ruparel Regalia?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback