O2
By Snehanjali and S.B.Developers Pvt.Ltd.
RG-MH-26161 · RERA P51800008513 · Last updated on MahaRERA portal: 13 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 51 complaints at MahaRERA
- Completion date moved by 63 months
- 3 extensions taken
- Rs 30.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
O2 is a Residential / Group Housing project by Snehanjali and S.B.Developers Pvt.Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008513 on 19 Aug 2017. Possession was promised by 4 Mar 2026 and is now 7 months past that date. The completion date has moved by 63 months from the original filing. 297 of the 310 units on this registration are recorded sold or booked, and 24 of 66 construction stages are filed complete. 51 complaints are on record with the regulator.
At a glance
Project
- NameO2
- TypeResidential / Group Housing
- Location
- Null
- Kurla
- Mumbai Suburban
- 400022
- Pincode400022
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800008513
- ReraGenie IDRG-MH-26161
Builder
- NameSnehanjali and S.B.Developers Pvt.Ltd.
- Entity typeCompany
- DirectorJia Zhuowen Wei
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion4 Mar 2026
- Revised completionRevised to 4 Mar 2026 (originally 31 Dec 2020)
- Buildings6 building records
- Documents filed301 files
Current status
Figures as on 13 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| O2 WING A | NA | 19 | 19 | 62 | 0 | 62 |
| O2 WING B | NA | 19 | 19 | 32 | 0 | 32 |
| O2 WING C | NA | 19 | 0 | 61 | 0 | 61 |
| O2 WING D | NA | 19 | 0 | 61 | 0 | 61 |
| O2 WING E | NA | 19 | 19 | 32 | 0 | 32 |
| O2 WING F | NA | 19 | 19 | 62 | 0 | 62 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 13 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 70%.
O2 WING A60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 26% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1% |
O2 WING B60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 26% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1% |
O2 WING C60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 26% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1% |
O2 WING D60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 26% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1% |
O2 WING E60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 26% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1% |
O2 WING F60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 44% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 26% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1% |
Progress on shared amenities15
As on 13 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed370
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| O2 WING A | 61 | 61 |
| O2 WING B | 62 | 62 |
| O2 WING C | 62 | 62 |
| O2 WING D | 62 | 62 |
| O2 WING E | 62 | 62 |
| O2 WING F | 61 | 61 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHYAM J HEMRAJANI |
| Architect | Space Moulders |
| Engineer | Paras Consultants |
| Engineer | Sahil Manoj Payer |
| Chartered Accountant | Dhawan & Co. |
| Chartered Accountant | Krishna R. Moondra & Associates LLP |
| Chartered Accountant | Manjunath Gowda and Associates |
| Partner | Role in project |
|---|---|
| Snehanjali and S.B.Developers Pvt.Ltd. | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) Due to the then Prevailing Pandemic situation in year 2020 and 2021, for the majority of the period labours & materials were not available on site which delayed the construction. 2) After lockdown was over, labours started to remobilize. However, it took more time to mobilise the required labours strength to recommence the construction work again. The considerable time was required to be spent in mobilizing the labours. 3)Material delivery was also affected and restarted again after the lockdown got over. 4) The Project is at advanced stage of completion. We will be shortly approaching the
Reason as filed by the promoterDeclaration attached.
Reason as filed by the promoter1. As per NCLT Order dated 12th February 2025 (IA (I.B.C) (Plan) No. 102/MB/2024 in CP (IB) No. 1046/MB/2023), SRA is instructed to revive, complete, and hand over the project.- uploaded in Tab 1 2. Clause 6.8 of the order mandates completion and possession within 1 year from project handover 3. Project was officially handed over on 4th March 2025 and therefore Completion deadline as per NCLT direction is 4th March 2026. 4. Requesting MahaRERA to grant project registration extension till 4th March 2026. 5. The extension is necessary and in the best interest of allottees and resettlers.
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 2906/2014 | Bombay City Civil Court | Pending |
| 2833/2014 | Bombay City Civil Court | Pending |
| 507/2015 | Bombay City Civil Court | Pending |
Complaints filed with MahaRERA51
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000023146 | RAMESH KOTI AND SANDRA KOTI | S B DEVELOPERS | 30/01/2018 |
| CC006000000000998 | MANINDRA KUMAR SINGH | SAI ASHRAY DEVELOPERS PVT LTD | 01/10/2017 |
| CC006000000056232 | Bharat Kenia | S. B. Developers | 18/09/2018 |
| CC006000000078601 | HEMANT KENIA | S B DEVELOPERS | 19/04/2019 |
| CC006000000110794 | HEMANT KENIA | S B DEVELOERS | 21/11/2019 |
| CC006000000078875 | SK INFRATECH SERVICES LLP | S B DEVELOPERS | 19/04/2019 |
| CC006000000110821 | SKI INFRATECH SERVICES | S B DEVELOEPRS | 18/11/2019 |
| CC006000000078876 | BHARAT KENIA | S B DEVELOPERS | 19/04/2019 |
| CC006000000110815 | BHARAT KENIA | S.B. DEVELOPER | 02/12/2019 |
| CC006000000078877 | LAXMICHAND KENIA | S B DEVELOPERS | 19/04/2019 |
| CC006000000110818 | LAXMICHAND KENIA | S B DEVELOPERS | 13/11/2019 |
| CC006000000078880 | KEYUR KENIA | S B DEVELOPERS | 19/04/2019 |
| CC006000000110819 | KEYUR KENIA | S B DEVELOPERS | 02/12/2019 |
| CC006000000078881 | RAMESH CHANDRANI | S B DEVELOPERS | 19/04/2019 |
| CC006000000110820 | RAMESH CHANDRANI | S B DEVELOPERS | 21/11/2019 |
| CC006000000078878 | BHARATI DHIRAJ KENIA | S B DEVELOPERS | 19/04/2019 |
| CC006000000110816 | BHARTI DHIRAJ KENIA | S B DEVELOPERS | 02/12/2019 |
| CC006000000193725 | Satyasheel Divecha | Snehanjali and S.B.Developers Pvt Ltd | 12/09/2020 |
| CC006000000194047 | Ramesh Koti | MESSRS S B Developers (Snehanjali and S B Developers Pvt Limited) | 15/09/2020 |
| CC006000000195239 | Firoz Engineer | SB Developers (Ahuja O2) | 23/12/2020 |
| CC006000000396551 | Firoz Nazir Engineer | SB Developers | 06/07/2023 |
| CC006000000282184 | Prashant Mahendra Bhatt | Snehanjali and S.B Developers Pvt Ltd | 05/08/2022 |
| CC006000000292266 | Mrs Conception John Rumao | Snehanjali and S B Developers Pvt Ltd | 07/08/2022 |
| CC006000000292290 | Sunita Robert Rumao | Snehanjali and S B Developers Pvt Ltd | 08/08/2022 |
| CC006000000292518 | Mr Rakesh Peter DSouza & Mrs Jobina Inas Gonsalves | Snehanjali and S B Developers Pvt Ltd | 01/09/2022 |
| CC006000000303726 | Mr Harish Awtaney and Mr Ramesh Hotchand Premaney | Snehanjali & S B Developers Pvt Ltd | 19/12/2022 |
| CC006000000375323 | Mr Sanjay H Jagwani and Mr Amit H Jagwani | Snehanjali and S B Developers Pvt Ltd | 18/04/2023 |
| CC006000000375338 | Himanshu Kantilal Bheda HUF | Snehanjali and S B Developers Pvt Ltd | 20/04/2023 |
| CC006000000397260 | Himanshu Kantilal Bheda HUF | Snehanjali and S B Developers Pvt. Ltd. | 28/08/2023 |
| CC006000000395791 | Ramprasad V Gupta and Maya R. Gupta Vishwanath - Ramprasad Gupta | Snehanjali and S.B. Developers Pvt. Ltd. | 13/05/2023 |
| CC006000000396313 | Aishwarya Varkhedkar | Snehajali sbd o2 | 19/06/2023 |
| CC006000000396639 | Subodh K Shah | Snehanjali and S,\. B. Developers Pvt. Ltd. | 08/07/2023 |
| CC006000000396671 | PRADIP JAGJIVAN SHAH | M/S S B Developers (SNEHANJALI AND S B DEVELOPERS PVT LIMITED | 13/07/2023 |
| CC006000000396679 | Kalpana Shah | M/S. S.B. Developers (SNEHANJALI AND S B DEVELOPERS PVT LIMITED) | 13/07/2023 |
| CC006000000396937 | Rajesh Yashwant Bandarkar | Snehanjali and S.B. Developers Pvt. Ltd. | 02/08/2023 |
| CC006000000396942 | Vidyacharan-Rasika Jagannath-Vidyacharan Yadav | Snehanjali and S.B. Developers Pvt. Ltd. | 03/08/2023 |
| CC006000000397024 | Akhilesh Tripurari Tripathi | Snehanjali and S.B. Developers Pvt. Ltd. | 11/08/2023 |
| CC006000000397113 | Sunil Purohit | Snehaanjali & SB Developers Pvt Ltd | 17/08/2023 |
| CC006000000397262 | Harshit Kantilal Bheda | Snehanjali and S B Developers Pvt Ltd | 28/08/2023 |
| CC006000000397708 | Asmita Dave | SNEHANJALI & SB DEVELOPERS PVT LTD | 06/10/2023 |
| CC006000000397948 | HARISH MORDANI HUF | SNEHANJALI & S.B. DEVELOPERS PVT. LTD. | 23/10/2023 |
| CC006000000397951 | TIKAMDAS MORDANI HUF | SNEHANJALI & S. B. DEVELOPERS PVT. LTD. | 23/10/2023 |
| CC006000000397960 | KAMLESH PARWANI | SNEHANJALI & S. B. DEVELOPERS PVT. LTD. | 25/10/2023 |
| CC006000000397964 | VICKY & KAMLESH PARWANI | SNEHANJALI & S. B. DEVELOPERS PVT. LTD. | 25/10/2023 |
| CC006000000397965 | VICKY PARWANI | SNEHANJALI & S. B. DEVELOPERS PVT. LTD. | 25/10/2023 |
| CC006000000397966 | RAMESH PARWANI | SNEHANJALI & S. B. DEVELOPERS PVT. LTD. | 25/10/2023 |
| CC006000000408545 | Rajesh Yashwant Bandarkar | Snehaanjali & SB Developers Pvt Ltd | 19/12/2023 |
| CC006000000428727 | RAJENDRA SHASHIKANT MODAK | SNEHANJALI AND SB DEVELOPERS PVT LTD | 08/01/2024 |
| CC006000000429249 | Abhijeet Avinash Barve | Snehanjali and S B Developers Pvt Ltd | 26/02/2024 |
| CC006000000429219 | Bhagwati Vyas | Snehanjali & SB Developers | 13/02/2024 |
| CC006000000439639 | USHA NARENDRA MAMANIA | Snehanjali and S.B.Developers Pvt. Ltd. | 20/03/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed301
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 301 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 1File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 2File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Form 3File: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Rera Declaration-O2.pdf | 13 Jan 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 301 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep O2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Null6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 166 registered projects within 2 km.
KINGS MY HOMES
Nilesh Laxmikant Kudalkar
RUNWAL TIMELESS
RUNWAL DEVELOPERS LIMITED
PROMONT
Sheth Smarthomes LLP
Proposed Redevelopment of existing Transit Cam
Maharashtra Housing and Area Development A
RAUNAK CENTRUM - A
Raunak Jigna Associates
SHIKARA HEIGHTS Phase-I
Shikara Constructions Pvt. Ltd.
See every Mumbai Suburban project, with the district possession charts
Builder: Snehanjali and S.B.Developers Pvt.Ltd.
Snehanjali and S.B.Developers Pvt.Ltd. has 1 registration on MahaRERA, including O2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that O2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if O2 is delayed beyond 4 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of O2?
The registered promoter entity is Snehanjali and S.B.Developers Pvt.Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in O2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against O2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for O2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at O2?
The professionals named in the filing: Architect: SHYAM J HEMRAJANI; Architect: Space Moulders; Engineer: Paras Consultants; Engineer: Sahil Manoj Payer; Chartered Accountant: Dhawan & Co.; Chartered Accountant: Krishna R. Moondra & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in O2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback