Runwal Bliss Wing - E
By Evie Real Estate Private Limited
RG-MH-12247 · RERA P51800001477 · Last updated on MahaRERA portal: 16 Apr 2025
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Runwal Bliss Wing - E is a Residential / Group Housing project by Evie Real Estate Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001477 on 28 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. 2 complaints are on record with the regulator.
At a glance
Project
- NameRunwal Bliss Wing - E
- TypeResidential / Group Housing
- Location
- Kanjurmarg
- Kanjurmarg(E)
- Kurla
- Mumbai Suburban
- 400042
- Pincode400042
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800001477
- ReraGenie IDRG-MH-12247
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jul 2017
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed460 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing E | NA | 47 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Wing E: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities28
As on 16 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Floral Garden | Yes | 0% |
| Amphitheater | Yes | 0% |
| Arrival Plaza | Yes | 0% |
| Childrens Play Area | Yes | 0% |
| Common Basement and Podium | Yes | 19% |
| Common Parking | Yes | 0% |
| Tennis Court | Yes | 0% |
| Swimming Pool No with Kids Pool | Yes | 0% |
| Swimming Pool No 1 | Yes | 0% |
| Skating rink | Yes | 0% |
| Senior citizen corner | Yes | 0% |
| Jogging / Cycling Track | Yes | 0% |
| DG Backup for critical services | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Evie Real Estate Private Limited | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397256 | Parwati Sunil Khanduri | Lucy Roychaudhary(CEO) | 29/08/2023 |
| CC006000000591107 | Quickresolve Professionals Private Limited | Evie Real Estate Private Limited | 11/07/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Oct 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Mar 2023
Documents filed460
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 460 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Wing E.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing E_11zon.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss Wing E 30092024_11zon.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing E - as on 30 June 2024_11zon.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing F - as on 30 June 2024_11zon.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing E_11zon (1).pdf | 16 Apr 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Runwal Bliss Wing D and Wing E Society Registration Certificate 31 January 2024.pdf | 20 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Runwal Bliss - Wing E - 31 December 2023_11zon.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing E - 31 December 2023_11zon.pdf | 6 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0027.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0028.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0029.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0030.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0043.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0044.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0001.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0002.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0003.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0004.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0005.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0006.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0006.pdf | 2 Jan 2024 |
| Building plan approvalFile: MYSCAN_20240101_0007.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0027.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0028.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0029.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0030.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0043.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0044.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0001.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0002.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0003.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0004.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0005.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0006.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0006.pdf | 2 Jan 2024 |
| Building Plan Approval (IOD)File: MYSCAN_20240101_0007.pdf | 2 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Runwal Bliss Tower E - 31 December 2021_11zon.pdf | 29 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Runwal Bliss Tower E - 31 December 2021.pdf | 28 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Runwal Bliss Wing E - 31 December 2022.pdf | 17 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory - Runwal Bliss Wing E - 30 September 2023_11zon.pdf | 25 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Runwal Bliss Wing E - 30 September 2023.pdf | 18 Oct 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Runwal Bliss Wing D and E Name Reservation Certificate 4 October 2023_11zon.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Runwal Bliss - Wing E - April 22 to March 23.pdf | 29 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss Wing E - 30 June 2023_11zon.pdf | 19 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Runwal Bliss Wing E Architect certificate - 30 June 2023.pdf | 10 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Other - Technical.pdf | 20 Jun 2023 |
| Details of encumbrancesFile: Runwal Bliss - Wing E - Encumbrance Certificate - as on 25 April 2023.pdf | 26 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Runwal Bliss Wing E - 31 March 2023_11zon.pdf | 25 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Runwal Bliss Wing E - 31 March 2023_11zon.pdf | 25 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Runwal Bliss Wing E - 31 March 2023_11zon.pdf | 25 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3 - Runwal Bliss Wing E - 31 March 2023.pdf | 25 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss Wing E- Sold Inventory - as on 31 March 2023_11zon.pdf | 12 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architec Certificate R Bliss E 31 March 2023 LRC.pdf | 7 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Certificates of CA (Form 3).pdf | 7 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 _R Bliss D and E - 3 April 2023 -LRC.pdf | 7 Apr 2023 |
| Other - TechnicalFile: FORM 2 A 2022-2023 R BLISS Wing E 31 March 2023 - LRC_11zon.pdf | 4 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A R Bliss Wing E Year 2019-2020 - LRC.pdf | 3 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 June 2022 Tower E Form 1 - LRC.pdf | 28 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 Sep 2022 Tower E Form 1 - LRC.pdf | 28 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 Sep 2022 Tower E Form 1 - LRC.pdf | 28 Mar 2023 |
| Certificates of CA (Form 3)File: 31 Dec 2022 Tower E Form 2 - LRC.pdf | 27 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 Tower E 31 Dec 2022 - LRC.pdf | 27 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 June 2022 Tower E Bliss Form 2 - LRC.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: 30 June 2022 Tower E Form 3 - LRC.pdf | 24 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 Sep 2022 Tower E Bliss Form 2 - LRC.pdf | 23 Mar 2023 |
| Certificates of CA (Form 3)File: 30 Sep 2022 Tower E Form 3 - LRC.pdf | 23 Mar 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration regarding society formation and Conveyance -Runwal Bliss Wing E - 21 March 202 | 23 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC -Runwal Bliss Wing D and E - 17 March 2023.pdf | 17 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 10 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) (4).pdf | 10 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Runwal Bliss Tower E_11zon (1).pdf | 9 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-R Bliss Wing E-FY 21-22_11zon.pdf | 8 Dec 2022 |
| Certificates of CA (Form 3)File: FORM 3 Runwal Bliss Wing E_11zon.pdf | 17 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 20 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 20 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 20 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 20 Oct 2022 |
| Certificates of CA (Form 3)File: 7 Certificates of CA (Form 3).pdf | 20 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Details - Runwal Bliss - Tower E - 27 Sep 2022.pdf | 29 Sep 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Runwal Bliss Wing A | Village Kanjurmarg | 293 | Completed | Dec 2021 | Late, Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 460 filed documents as one ZIP, foldered, with a manifest
Keep Runwal Bliss Wing - E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kanjurmarg(E)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 169 registered projects within 2 km.
Runwal Meadows-Daisy
Evie Real Estate Private Limited
Runwal Commerz - Tower 1
Evie Real Estate Private Limited
Flora
UVK Divine Realty
Runwal Avenue Wing-J
Susneh Infrapark Private Limited
Runwal Avenue Wing K
Susneh Infrapark Private Limited
Runwal Avenue Wing - M
Susneh Infrapark Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Evie Real Estate Private Limited
Evie Real Estate Private Limited has 11 registrations on MahaRERA, including Runwal Bliss Wing - A and Runwal Bliss Wing - C. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Runwal Bliss Wing - E is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Runwal Bliss Wing - E?
The registered promoter entity is Evie Real Estate Private Limited, a company as per the filing. Its CIN U74999MH2014PTC251834 and GSTIN 27AADCE7724P1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Runwal Bliss Wing - E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Runwal Bliss Wing - E?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Runwal Bliss Wing - E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Runwal Bliss Wing - E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback