ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Runwal Bliss Wing - D

Completed No litigation declared Residential / Group Housing project

Runwal Bliss Wing - D

By Evie Real Estate Private Limited

RG-MH-11482 · RERA P51800001296 · Last updated on MahaRERA portal: 16 Apr 2025

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
9Complaints at MahaRERAon this registration
Jump to the 459 documents Report an error

Runwal Bliss Wing - D is a Residential / Group Housing project by Evie Real Estate Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001296 on 27 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. 9 complaints are on record with the regulator.

At a glance

Project

  • NameRunwal Bliss Wing - D
  • TypeResidential / Group Housing
  • Location
    • Kanjurmarg
    • Kanjurmarg(E)
    • Kurla
    • Mumbai Suburban
    • 400042
  • Pincode400042
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001296
  • ReraGenie IDRG-MH-11482

Builder

  • NameEvie Real Estate Private Limited
  • Entity typeCompany
  • CINU74999MH2014PTC251834
  • GSTIN27AADCE7724P1Z3
  • DirectorsVijay Patil, Ashutosh Navare
  • Other registrations10 more →
  • Completed5 of 11
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed459 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing DNA540000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Wing D: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities28

As on 16 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Floral GardenYes0%
AmphitheaterYes0%
Arrival PlazaYes0%
Children Play AreaYes0%
Common Basement and PodiumYes19%
Common ParkingYes0%
Tennis CourtYes0%
Swimming Pool with Kids PoolYes0%
Swimming pool No 1Yes0%
Skating RinkYes0%
Senior Citizen CornerYes0%
Jogging and Cycling trackYes0%
DG Backup for critical servicesYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area629 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2.0
Proposed, not sanctioned2 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSION EAST, MUMBAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSunil Ambre & Associates
EngineerJ W Consultants LLP (formerly Y S Sane Associates)
Chartered AccountantS M Gupta & Co
Chartered AccountantKshirsagar & Associates
PartnerRole in project
Evie Real Estate Private Limited-

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000001820Pattabiraman SadhasivamRUNWAL HOMES PRIVATE LIMITED11/12/2017
CC006000000001068Ajay SagarEvie Real Estate Private Limited27/10/2017
CC006000000023332KARAN S CHELLANIEVIE REAL ESTATE PRIVATE LIMITED21/02/2018
CC006000000044025KARAN S CHELLANIEVIE REAL ESTATE PVT LTD06/04/2018
CC006000000056002MANJU VICKY SHARMAM/S EVIE REAL ESTATE PRIVATE LIMITED26/09/2018
CC006000000195613GAURAV BAGKAREVIE REAL EASTATE PVT LTD21/01/2021
CC006000000209443Nishant SinghAnkitha Palissery23/12/2021
CC006000000428850Saumitra TiwaryEvie Real Estate Pvt Ltd27/02/2024
CC12504311Evie Real Estate Private LimitedShantaram Eknath Shinde06/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Mar 2023

Documents filed459

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 459 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Wing D.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing D_11zon.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Runwal Bliss Wing D 30092024_11zon.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing D - as on 30 June 2024_11zon.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing D_11zon.pdf16 Apr 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Runwal Bliss Wing D and Wing E Society Registration Certificate 31 January 2024.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Runwal Bliss - Wing D - 31 December 2023_11zon.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Runwal Bliss - Wing D - 31 December 2023_11zon.pdf6 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0001.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0002.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0003.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0004.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0005.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0006.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0007.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0022.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0023.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0024.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0025.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0026.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0041.pdf2 Jan 2024
Building plan approvalFile: MYSCAN_20240101_0042.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0022.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0023.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0024.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0025.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0026.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0041.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0042.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0001.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0002.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0003.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0004.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0005.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0006.pdf2 Jan 2024
Building Plan Approval (IOD)File: MYSCAN_20240101_0007.pdf2 Jan 2024
Certificates of CA (Form 3)File: Form 3 Runwal Bliss Tower D - 31 December 2021_11zon.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Inventory - Runwal Bliss Wing D - 30 September 2023_11zon.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory - Runwal Bliss Wing D - 30 September 2023_11zon.pdf25 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Runwal Bliss Wing D - 30 September 2023.pdf18 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Runwal Bliss Wing D and E Name Reservation Certificate 4 October 2023_11zon.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Runwal Bliss - Wing D - April 22 to March 23.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: Runwal Bliss Wing D - 30 June 2023_11zon (1).pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Runwal Bliss Wing D Architect certificate - 30 June 2023.pdf10 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Other - Technical.pdf20 Jun 2023
Details of encumbrancesFile: Runwal Bliss - Wing D - Encumbrance Certificate - as on 25 April 2023.pdf26 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Runwal Bliss Wing D - 31 March 2023_11zon.pdf25 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Runwal Bliss Wing D - 31 March 2023_11zon.pdf25 Apr 2023
Certificates of CA (Form 3)File: Form 3 - Runwal Bliss Wing D - 31 March 2023.pdf25 Apr 2023
Disclosure of sold/ booked inventoryFile: Runwal Bliss Wing D- Sold Inventory - as on 31 March 2023_11zon.pdf12 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architec Certificate R Bliss D 31 March 2023 LRC.pdf7 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 _R Bliss D and E - 3 April 2023 -LRC.pdf7 Apr 2023
Other - TechnicalFile: FORM 2 A 2022-2023 R BLISS Wing D 31 March 2023 - LRC_11zon.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A R Bliss Wing D Year 2019-2020 - LRC.pdf3 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 June 2022 Tower D Form 1 - LRC.pdf28 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 Sep 2022 Tower D Form 1 - LRC.pdf28 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 Dec 2022 Tower D Form 1 - LRC.pdf28 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 Dec 2022 Tower D Form 2 - LRC.pdf27 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 Dec 2022 Tower D Form 2 - LRC.pdf27 Mar 2023
Certificates of CA (Form 3)File: Form 3 Tower D 31 Dec 2022 - LRC.pdf27 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 June 2022 Tower D Bliss Form 2 - LRC.pdf24 Mar 2023
Certificates of CA (Form 3)File: 30 June 2022 Tower D Form 3 - LRC.pdf24 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 Sep 2022 Tower D Bliss Form 2 - LRC.pdf23 Mar 2023
Certificates of CA (Form 3)File: 30 Sep 2022 Tower D Form 3 - LRC.pdf23 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration regarding society formation and Conveyance -Runwal Bliss Wing D - 21 March 20223 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC -Runwal Bliss Wing D and E - 17 March 2023.pdf17 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) (3).pdf9 Mar 2023
Disclosure of sold/ booked inventoryFile: Runwal Bliss - Tower D_11zon.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-R Bliss Wing D-FY 21-22_11zon.pdf8 Dec 2022
Certificates of CA (Form 3)File: FORM 3 Runwal Bliss Wing D_11zon.pdf17 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Oct 2022
Certificates of CA (Form 3)File: 7 Certificates of CA (Form 3).pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Inventory Details - Runwal Bliss - Tower D - 27 Sep 2022.pdf29 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A -R BLISS - Wing D - 30 Sep 2022.pdf28 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A R BLISS Wing D.pdf20 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Runwal Bliss Wing D - 31 Mar 2022.pdf13 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2- Runwal Bliss Wing D - 31 Mar 2022.pdf13 Jul 2022
Certificates of CA (Form 3)File: CA Certificate Form 3- Runwal Bliss Wing D - 31 Mar 2022.pdf13 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventories - Runwal Bliss Wing D - 27 June 2022.pdf4 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Runwal Bliss Wing AVillage Kanjurmarg293CompletedDec 2021Late, Jun 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Runwal Bliss Wing - D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kanjurmarg(E)6,700+ in Mumbai Suburban

2 kmRunwal Bliss Wing - DCompleted 43Lapsed / revoked 27Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: Evie Real Estate Private Limited

Evie Real Estate Private Limited has 11 registrations on MahaRERA, including Runwal Bliss Wing - A and Runwal Bliss Wing - C. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Runwal Bliss Wing - D is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Runwal Bliss Wing - D?

The registered promoter entity is Evie Real Estate Private Limited, a company as per the filing. Its CIN U74999MH2014PTC251834 and GSTIN 27AADCE7724P1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Runwal Bliss Wing - D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Runwal Bliss Wing - D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Runwal Bliss Wing - D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Runwal Bliss Wing - D?

The professionals named in the filing: Architect: Sunil Ambre & Associates; Engineer: J W Consultants LLP (formerly Y S Sane Associates); Chartered Accountant: S M Gupta & Co; Chartered Accountant: Kshirsagar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Runwal Bliss Wing - D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Runwal Bliss Wing - D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Runwal Bliss Wing - D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.