Rukhmini Vallabh

By Mahika Constructions

RG-MH-19011 · RERA P50500077978 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Excavation, 90%
23 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Rukhmini Vallabh is a Residential / Group Housing project by Mahika Constructions in Nagpur, Maharashtra, registered with MahaRERA as P50500077978 on 14 Nov 2024. Possession is promised by 30 Jun 2027. 5 of the 28 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameRukhmini Vallabh
  • TypeResidential / Group Housing
  • Location
    • Samrat Navshaktijanvikas Sanastha
    • New Manish Nagar
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440015
  • Pincode440015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500077978
  • ReraGenie IDRG-MH-19011

Builder

  • NameMahika Constructions
  • Entity typePartnership
  • PartnersAshutosh Rajendra Shivhare, Sushant Pramod Chilwe

Key dates

this monthRegisteredNov 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

18%5 of 28 units booked
32.7%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rukhmini VallabhNA7728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

Rukhmini Vallabh: 48% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,024 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jun 2025
LandownerVillageDistrict
Sushant ChilweDesaiganj (M Cl)Gadchiroli
Ashutosh ShivhareNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority.
Permissible FSI2947.42
Proposed, not sanctioned2,947 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Akarshan Busiplex, 26, Central Bazaar Road, Ramdaspeth, Nagpur Maharashtra.440010
Estimated costRs 6.94 cr
Cost incurredRs 2.27 cr
Work done32.74%
BuildingWingEstimatedIncurred
Rukhmini VallabhNARs 6.74 crRs 2.27 cr
-NARs 20.00 lakh-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Satpute
ArchitectDesign cell
EngineerB P Gohar
EngineerPC Engineers And Consultants
Chartered AccountantPushpak Gadewar
Chartered AccountantVilas Gadewar
Chartered AccountantGadewar & Associates
Chartered AccountantVilas Gadewar & company
Chartered AccountantSANJAY CHINDALIYA & CO
PartnerRole in project
Mahika Constructions-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Rukhmini Vallabh_Engineers Certificate for Quality Assurance_31032026.pdf7 Aug 2026
Withdrawal Update Form 1File: Rukmini Vallabh_Architect Certificate_30062026.pdf29 Jul 2026
Withdrawal Update Form 2File: Rukmini Vallabh_Engineers Certificate_30062026.pdf29 Jul 2026
Withdrawal Update Form 3File: Rukmini Vallabh_Form3_30062026.pdf29 Jul 2026
Withdrawal Update Form 1File: RukhminiVallabh_Form1_ArchtCert_31032026.pdf15 May 2026
Withdrawal Update Form 2File: RukhminiVallabh_Form2_EnggCert_31032026.pdf15 May 2026
Withdrawal Update Form 3File: RukhminiVallabh_Form3_31032026.pdf15 May 2026
Withdrawal Update Form 1File: Architect Certificate_31122025.pdf30 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate_31122025.pdf30 Jan 2026
Withdrawal Update Form 3File: CA Certificate_Form 3_31122025.pdf30 Jan 2026
Withdrawal Update Form 1File: Architect Certificate_Mahika Construction_30092025.pdf31 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate_Mahika Construction_30092025.pdf31 Oct 2025
Withdrawal Update Form 3File: CA Certificate_Mahika Constructions_30092025.pdf31 Oct 2025
Form 5 (FY 2024-2025)File: Maharera_Form5_Mahika Construction.pdf29 Sep 2025
Withdrawal Update Form 1File: Architect Certificate_Mahika_30062025.pdf22 Jul 2025
Withdrawal Update Form 1File: Architect Certificate_Mahika_30062025.pdf22 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate_Mahika_30062025.pdf22 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate_Mahika_30062025.pdf22 Jul 2025
Withdrawal Update Form 3File: CA Certificate_Mahika Constructions_30062025.pdf22 Jul 2025
Withdrawal Update Form 3File: CA Certificate_Mahika Constructions_30062025.pdf22 Jul 2025
Form 1File: Architect Form 1_Rukmini Vallabh_31122024.pdf23 Jun 2025
Form 2File: ENGINEER CERTIFICATE 31122024.pdf23 Jun 2025
Form 3File: Rukhmini Vallabh_Form 3_31122024.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Mahika Inventory Update_31122024.pdf23 Jun 2025
Self-declaration of Quarterly ProgressFile: Mahika Self Declaration_31122024.pdf23 Jun 2025
Form 1File: Architect Certificate_Mahika_31032025.pdf23 Jun 2025
Form 2File: Engineer Certificate_Mahika_31032025.pdf23 Jun 2025
Form 3File: Mahika Constructions_CA certificate_31032025 (2).pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Mahika Inventory Update_31032025.pdf23 Jun 2025
Self-declaration of Quarterly ProgressFile: Mahika Self Declaration_31032025.pdf23 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahika Constructions_CA certificate_31032025 (2).pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Mahika_31032025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Mahika_31032025.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1_Rukmini Vallabh_31122024.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rukhmini Vallabh_Form 3_31122024.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31122024.pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Mail Confirmation.pdf8 Nov 2024
Other - LegalFile: CC Mail Confirmation.pdf8 Nov 2024
Home Buyer /Allottee Grievance Redressal CellFile: CC Mail Confirmation.pdf8 Nov 2024
Other - TechnicalFile: Reply for Non Confirmation from Sanctioning Authority.pdf5 Nov 2024
Other - TechnicalFile: Annexure A Order 50_Mahika Construction13062024.pdf4 Nov 2024
Proforma of Allotment letterFile: Allotment Letter Mahika Construction 281024.pdf29 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report ALLOTMENT LETTER 281024.pdf29 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report ATS 281024.pdf29 Oct 2024
Proforma of Agreement for saleFile: Agreement to Sale 281024.pdf29 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Mahika Construction_Bank Declaration_15102024.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MAHIKA CONSTRUCTION FORM 3 14102024.pdf15 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Document 133 15102024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30092024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30092024.pdf14 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of No Finance.pdf8 Aug 2024
Building plan approvalFile: SANCTION MAP.pdf5 Aug 2024
Layout approvalFile: SANCTION MAP.pdf5 Aug 2024
Copy of the legal title reportFile: MAHIKA LSR RERA_compressed (1).pdf5 Aug 2024
Copy of Layout Approval (in case of layout)File: SANCTION MAP.pdf5 Aug 2024
Declaration in FORM BFile: Form B Sushant Chilwe18072024.pdf5 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Building Permit.pdf5 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: SANCTION MAP.pdf5 Aug 2024
Declaration about Commencement CertificateFile: Commencement Certificate_Mahika Construction13062024.pdf5 Aug 2024
CERSAI detailsFile: CERSAI_Search_Report_200316097096_For_Asset_Based_Search_05_08_2024_22_17_48_118.pdf5 Aug 2024
CERSAI detailsFile: CERSAI_Search_Report_200316097024_For_Asset_Based_Search_05_08_2024_22_12_30_965.pdf5 Aug 2024
PAN CardFile: Mahika Constructions PAN.pdf12 Jul 2024
Details of encumbrances concerned to FinanceFile: Mahika Construction_Finance13062024.pdf12 Jul 2024
Details of encumbrances concerned to FinanceFile: Mahika Construction_Legal13062024.pdf12 Jul 2024
Declaration in FORM BFile: Form B Ashutosh Shivhare_Mahika Construction13062024.pdf12 Jul 2024
Details of encumbrances concerned to LegalFile: Mahika Construction_Finance13062024.pdf12 Jul 2024
Details of encumbrances concerned to LegalFile: Mahika Construction_Legal13062024.pdf12 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Project Abhishek_Mahika Construction13062024.pdf12 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Project Sushant_Mahika Construction13062024.pdf12 Jul 2024

How this compares with Nagpur

18%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rukhmini Vallabh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near New Manish Nagar2,800+ in Nagpur

2 kmRukhmini VallabhCompleted 17Lapsed / revoked 7Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: Mahika Constructions

Mahika Constructions has 1 registration on MahaRERA, including Rukhmini Vallabh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Rukhmini Vallabh is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rukhmini Vallabh?

The registered promoter entity is Mahika Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rukhmini Vallabh?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rukhmini Vallabh?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rukhmini Vallabh?

The professionals named in the filing: Architect: Prashant Satpute; Architect: Design cell; Engineer: B P Gohar; Engineer: PC Engineers And Consultants; Chartered Accountant: Pushpak Gadewar; Chartered Accountant: Vilas Gadewar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rukhmini Vallabh?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rukhmini Vallabh. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rukhmini Vallabh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.