ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / RUDRAKSHA BUILDING NO 11

Completed No litigation declared Residential / Group Housing project

RUDRAKSHA BUILDING NO 11

By RAJ UNIVERSAL

RG-MH-04286 · RERA P51800021545 · Last updated on MahaRERA portal: 5 Jul 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

RUDRAKSHA BUILDING NO 11 is a Residential / Group Housing project by RAJ UNIVERSAL in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021545 on 8 Jul 2019. The registration is recorded completed; possession was promised by 30 Dec 2023. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRUDRAKSHA BUILDING NO 11
  • TypeResidential / Group Housing
  • Location
    • VAISHALI NAGAR ROAD
    • DAHISAR EAST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800021545
  • ReraGenie IDRG-MH-04286

Builder

  • NameRAJ UNIVERSAL
  • Entity typePartnership
  • PartnersRAJESHKUMAR PHOOLRAJ SINGH, Mukesh Juharmal Parmar, Sureshkumar Phoolraj Singh, Jagdish Bhuralal Thakkar, Khetshi Devraj Barot, Shree DPS Projects and Services Pvt Ltd Through Jitendra Singh
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJul 2019First promiseDec 2022Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Jul 2019
  • Promised completion30 Dec 2023
  • Revised completionRevised to 30 Dec 2023 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 11 WING A AND BNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 11 WING A AND B: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,087 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ARKADE ASSOCIATESAndheriMumbai Suburban

Approvals and building plan

Permissible FSI10088.2
Proposed, not sanctioned8,715 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIRA ROAD EAST

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH SHAH
PartnerRole in project
RAJ UNIVERSAL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013137Dec 2022 → Dec 2023

Reason as filed by the promoterProject work is complete 100% we have already applied for Occupational Certificate. we have attached the reply of MCGM and working on those points.

Litigation declared2

CaseCourtStatus
609/2018High Court of MumbaiPending for hearing
2358/2018City Civil Court DindoshiPending for hearing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000429324Purvi Parag Shah and Parag Chandrakant ShahArkade Associates19/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jul 2023

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf5 Jul 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate Rudraksha Bldg11.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raj universal Architech Form 1.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raj Universal Engineer Form 2.pdf6 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Raj Universal Quality Form 2A.pdf6 Jul 2023
Certificates of CA (Form 3)File: Raj Universal C A Certificate.pdf6 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Raj Universal Bldg No 11 OC.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Raj Universal Form 5 2021-22.pdf24 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rudraksh Building Form 1 Compressed.pdf4 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rudraksha Engineer.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A)File: Rudraksha Quality.pdf4 Apr 2023
Certificates of CA (Form 3)File: Ca Certificate.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rudraksh Building No11 Architect.pdf6 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rudraksha Engineer.pdf6 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rudraksha Engineer Certificate 30092022.pdf6 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rudraksha Quality Certificate 30092022.pdf6 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RudrakshBldg11 Architect.pdf4 Oct 2022
Certificates of CA (Form 3)File: rudraksha bilding n 11.pdf4 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raj Universal Engineer.pdf8 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A)File: RAj Universal Quality.pdf8 Jul 2022
Declaration about Commencement CertificateFile: Raj Universal Declaration of CC.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Rudraksha.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Raj Universal Discloser of Inventories.pdf7 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200241627039_For_Debtor_Based_Search_07_07_2022_12_31_01_661.pdf7 Jul 2022
Certificates of CA (Form 3)File: CA RAj Universal.pdf7 Jul 2022
Certificates of CA (Form 3)File: CA Certificate Raj Universal.pdf30 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rudraksh Building No11 Architect.pdf19 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RUDRAKSHA BLDG 11 ENGINEER CERTIFICATE.pdf19 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A)File: RUDRAKSHA QUALITY BLDG11.pdf19 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate 201920.pdf19 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Certificate 202021.pdf19 Apr 2022
Certificates of CA (Form 3)File: RAJ UNIVRSAL FORAM 3 13042022.pdf18 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rudraksh Building No 11 Work Completion Certificate (RERA) 220128.pdf12 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A)File: RUDRAKSHA BLDG 11 ENGINEER CERTIFICATE JAN22.pdf12 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A)File: RUDRAKSHA QUALITY BLDG 11 JAN 22.pdf12 Feb 2022
Certificates of CA (Form 3)File: raj universal.pdf12 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RUDRAKSHA BLDG11 ENGINEER CERTIFICATE.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A)File: RUDRAKSHA QUALITY BLDG 11SEP21.pdf7 Oct 2021
Certificates of CA (Form 3)File: rera certificate RERA FORM 3.pdf7 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RUDRAKSHA ARCITECT.pdf14 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RUDRAKSHAENGINEERCERTIFICATE.pdf14 May 2021
Engineers Certificate on Quality Assurance (Form 2A)File: RUDRAKSHAQUALITY31stMar2021.pdf14 May 2021
Certificates of CA (Form 3)File: RUDRAKSHA BLDG11CA.pdf14 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT.pdf21 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER.pdf21 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A)File: QUALITY.pdf21 Nov 2020
Certificates of CA (Form 3)File: 4th C A CERTIFICATE_compressed.pdf21 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Raj Universal 11 Revised CC.pdf20 Mar 2020
Certificates of CA (Form 3)File: RUDRAKSHA BLDG 11 CA CETIFICATE.pdf28 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT Rudraksha Building No 11.pdf25 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE RU 11 2 2020.pdf25 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A)File: ENGN QUALITY CERTIFICATE RU.pdf25 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCITECT CERTI OCTOBER 19.pdf9 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE OCTOBER 19.pdf9 Nov 2019
Engineers Certificate on Quality Assurance (Form 2A)File: QUALITY CERTI OCTOBER 19.pdf9 Nov 2019
Certificates of CA (Form 3)File: 2nd CA Certificate Bldg No 11.pdf9 Nov 2019
Layout approvalFile: APPROVED AMENDED DWG 1 DT 19-09-2018 (1)_1.pdf3 Jul 2019
Layout approvalFile: APPROVED AMENDED DWG 1 DT 19-09-2018 (1)_2.pdf3 Jul 2019
Layout approvalFile: APPROVED AMENDED DWG 2 DT 19-09-2018.pdf3 Jul 2019
Building plan approvalFile: IOD COPY BLDG11.pdf3 Jul 2019
Details of encumbrancesFile: ENCUMBRANCE RAJ UNIVERSAL.pdf3 Jul 2019
Copy of Layout Approval (in case of layout)File: APPROVED AMENDED DWG 1 DT 19-09-2018 (1)_1.pdf3 Jul 2019
Copy of Layout Approval (in case of layout)File: APPROVED AMENDED DWG 1 DT 19-09-2018 (1)_2.pdf3 Jul 2019
Copy of Layout Approval (in case of layout)File: APPROVED AMENDED DWG 2 DT 19-09-2018.pdf3 Jul 2019
Building Plan Approval (IOD)File: IOD COPY BLDG11.pdf3 Jul 2019
Declaration in FORM BFile: FORM-B RAJ UNIVERSAL.pdf3 Jul 2019
Certificates of CA (Form 3)File: Form 3 CA CERTIFICATE 1.pdf3 Jul 2019
Proforma of Allotment letterFile: MOFA Agreement Bldg No 11 - Raj Universal.pdf3 Jul 2019
Copy of the legal title reportFile: TITLE REPORT.pdf26 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: C C COPY.pdf26 Jun 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUDRAKSHA BUILDING NO 11 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR EAST6,700+ in Mumbai Suburban

2 kmRUDRAKSHA BUILDING NO 11Completed 34Lapsed / revoked 26Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 126 registered projects within 2 km.

Builder: RAJ UNIVERSAL

RAJ UNIVERSAL has 2 registrations on MahaRERA, including RUDRAKSHA and RUDRAKSHA BUILDING NO 11. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RUDRAKSHA BUILDING NO 11 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUDRAKSHA BUILDING NO 11?

The registered promoter entity is RAJ UNIVERSAL, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUDRAKSHA BUILDING NO 11?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUDRAKSHA BUILDING NO 11?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUDRAKSHA BUILDING NO 11?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUDRAKSHA BUILDING NO 11?

The professionals named in the filing: Architect: MANISH SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUDRAKSHA BUILDING NO 11?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUDRAKSHA BUILDING NO 11. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUDRAKSHA BUILDING NO 11 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.