Home / Browse projects / Palghar, Maharashtra / ROYAL RESIDENCY

Completed No litigation declared Residential / Group Housing project

ROYAL RESIDENCY

By SKYLINE SHELTERS

RG-MH-60136 · RERA P99000047035 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 16 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

ROYAL RESIDENCY is a Residential / Group Housing project by SKYLINE SHELTERS in Palghar, Maharashtra, registered with MahaRERA as P99000047035 on 26 Sep 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 16 months from the original filing.

At a glance

Project

  • NameROYAL RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • KOLIWADA
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401201
  • Pincode401201
  • RERA no.P99000047035
  • ReraGenie IDRG-MH-60136

Builder

  • NameSKYLINE SHELTERS
  • Entity typePartnership
  • PartnersFAIZAL GANI BHAGWANI, GANI ABDUL KADAR BHAGWANI, RAZIYA GANI BHAGWANI

Key dates

this monthRegisteredSep 2022First promiseAug 2024Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Aug 2024)
  • Buildings1 building record
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

1: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Open Space20

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area193 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2024
LandownerVillageDistrict
ROYAL RESIDENCYVasai-Virar City (M Corp)Palghar
ABDULGANI ABDULKADAR BHAGWANIVasai-Virar City (M Corp)Palghar
FAIZAL GANI BHAGWANIVasai-Virar City (M Corp)Palghar
RAZIYA BHAGWANIVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI768.38
Proposed, not sanctioned768 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMOTISHA BHAVAN ZENDA BAZAR VASAI WEST

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectONE SOURCE
ArchitectKANCHAN ARUN PATIL
EngineerSS & ASSOCIATES
EngineerMohd Sufiyan Shaikh
Chartered AccountantSM VAGADARGI & CO
Chartered AccountantSHITAL MANJUNATH VAGADARGI
Chartered AccountantJALPA JAYDEEP RAITHATHA
Chartered AccountantRahim Mansur Rajwani
PartnerRole in project
SKYLINE SHELTERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000024789Aug 2024 → Dec 2025

Reason as filed by the promoterReason for Extension 1. The project is almost on completion stage and we have applied for Occupancy Certificate however , some of the activity has been pending which are listed below. Following are PERT Details which will be completed within stipulated time a. External Plumbing and external plaster - 95% Completed b. Waterproofing of all building - 95 % Completed c. Installation of Lifts and fire fitting equipment’s - 90% Completed d. Electrical fittings and entrance finishing - 90% completed e. Plinth Protection of area appurtenant to building - 90 % Completed f. Partial Finishing of Compound

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Apr 2025

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 05-08-24.pdf21 May 2026
Form 2File: FORM 2 05-08-2024.pdf21 May 2026
Form 3File: Form-3 Sign.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Form-3 Sign_removed.pdf21 May 2026
Form 1File: FORM 1 14-10-24.pdf21 May 2026
Form 2File: FORM 2 14-10-24.pdf21 May 2026
Form 3File: Scan FORM 3 Q2.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Scan FORM 3 Q2_removed.pdf21 May 2026
Form 1File: FORM 1 14-10-24.pdf21 May 2026
Form 2File: FORM 2 14-10-24.pdf21 May 2026
Form 3File: Scan FORM 3 Q2.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Scan FORM 3 Q2_removed.pdf21 May 2026
Form 1File: FORM 1 14-10-24.pdf21 May 2026
Form 2File: FORM 2 14-10-24.pdf21 May 2026
Form 3File: Scan FORM 3 Q2.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Scan FORM 3 Q2_removed.pdf21 May 2026
Form 1File: FORM 1 14-10-24.pdf21 May 2026
Form 2File: FORM 2 14-10-24.pdf21 May 2026
Form 3File: Scan FORM 3 Q2.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Scan FORM 3 Q2_removed.pdf21 May 2026
Form 1File: FORM 1 14-10-24.pdf21 May 2026
Form 2File: FORM 2 14-10-24.pdf21 May 2026
Form 3File: Scan FORM 3 Q2.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Scan FORM 3 Q2_removed.pdf21 May 2026
Form 1File: FORM 1 14-10-24.pdf21 May 2026
Form 2File: FORM 2 14-10-24.pdf21 May 2026
Form 3File: Scan FORM 3 Q2.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Form-3 Sign_removed.pdf21 May 2026
Occupational CertificateFile: OC.pdf21 May 2026
Form 5 (FY 2024-2025)File: Signed FORM 5 24-25.pdf29 Sep 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM-1.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 14-10-24 Signed F.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan fORM 3 Q-4.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan FORM 3 Q2.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3 Q-3.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3 Q-2.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3 Q-4.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3 Q3.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3 Q-1.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 14-10-24 Signed F.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 13-12-22.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 20-01-23.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 18-07-23.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 14-10-24.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 14-10-24.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 18-07-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 20-01-23.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 13-12-22.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 30-09-2023.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 30-12-23.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM-1signed.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certficate signed.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Signed.pdf12 Nov 2024
Declaration in FORM BFile: FORM-B_0001 - Declaration.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM-1_compressed.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf11 Nov 2024
Other - TechnicalFile: Format B - Allotte Consent.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: IMRAN GANI SITE ENGG_0001 - Form 2A.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: IMRAN GANI SITE ENGG_0001 - Form 2A F.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM-1.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sign.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form-2.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sign.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf24 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate form-1.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form -2.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form-2.pdf24 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SKYLINE SHELTERS.pdf4 Oct 2023
Layout approvalFile: PLAN LAYOUT- highlighted.pdf14 Sep 2022
Copy of the legal title reportFile: TITLE DEED LATEST 2_compressed.pdf14 Sep 2022
Copy of Layout Approval (in case of layout)File: PLAN LAYOUT- highlighted.pdf14 Sep 2022
Copy of the legal title reportFile: TITLE DEED LATEST 1 compressed.pdf27 Aug 2022
Details of encumbrances concerned to FinanceFile: letter of encumbrances dated.pdf27 Aug 2022
Proforma of Allotment letterFile: Allotment letter proforma_Final as per rera skyline shelter (1).pdf27 Aug 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE_RERA MODEL.pdf27 Aug 2022
Layout approvalFile: PLAN LAYOUT.pdf23 Aug 2022
Building plan approvalFile: PLAN LAYOUT.pdf23 Aug 2022

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 16 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROYAL RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

Builder: SKYLINE SHELTERS

SKYLINE SHELTERS has 1 registration on MahaRERA, including ROYAL RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ROYAL RESIDENCY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROYAL RESIDENCY?

The registered promoter entity is SKYLINE SHELTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROYAL RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROYAL RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROYAL RESIDENCY?

The professionals named in the filing: Architect: ONE SOURCE; Architect: KANCHAN ARUN PATIL; Engineer: SS & ASSOCIATES; Engineer: Mohd Sufiyan Shaikh; Chartered Accountant: SM VAGADARGI & CO; Chartered Accountant: SHITAL MANJUNATH VAGADARGI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.