ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Royal Ranches

Completed No litigation declared Plotted project

Royal Ranches

By Mustafa Ali Shabbar Hassonjee

RG-MH-03492 · RERA P50500026907 · Last updated on MahaRERA portal: 14 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
18 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Royal Ranches is a Plotted project by Mustafa Ali Shabbar Hassonjee in Nagpur, Maharashtra, registered with MahaRERA as P50500026907 on 3 Nov 2020. The registration is recorded completed; possession was promised by 29 Apr 2024. The completion date has moved by 12 months from the original filing. 12 of the 30 units on this registration are recorded sold or booked.

At a glance

Project

  • NameRoyal Ranches
  • TypePlotted
  • Location
    • Hingna Road
    • Hingna
    • Pendhari (536039)
    • Nagpur
    • 441110
  • Pincode441110
  • RERA no.P50500026907
  • ReraGenie IDRG-MH-03492

Builder

  • NameMustafa Ali Shabbar Hassonjee
  • Entity typeIndividual

Key dates

this monthRegisteredNov 2020First promiseApr 2023Revised toApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Nov 2020
  • Promised completion29 Apr 2024
  • Revised completionRevised to 29 Apr 2024 (originally 30 Apr 2023)
  • BuildingsNot stated in filing
  • Documents filed60 files

Current status

40%12 of 30 units booked

Figures as on 14 Apr 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 14 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Masood Hasan Kurban Hussain DariwalaNagpur (M Corp.)Nagpur
Mustafa Ali Shabbar HassonjeeNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI15820.0
Proposed, not sanctioned15,820 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHingna Road Nagpur 440022

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectN K Palsapure
EngineerN K Palsapure
Chartered AccountantAli Hatim Husain
PartnerRole in project
Mustafa Ali Shabbar Hassonjee-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500016484Apr 2023 → Apr 2024

Reason as filed by the promoterCertain Legal Formalities and Compliances could not be completed for various practical and technical reasons.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Apr 2025

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: works completion, mustafa.pdf14 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RL new.pdf14 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: kh 96-3 , mouza- pendhari.pdf14 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: rl 1.pdf14 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form - 4 - Royal Ranches.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ar cert dec 23.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cert dec23 RR.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate dec23.pdf22 Mar 2024
Disclosure of sold/ booked inventoryFile: rr booked dec23.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: royal arch cert apr23.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: royal arc cert july 23.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: royal arct cert oct 23.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: royal engg cert apr23.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: royal engg cert jly23.pdf30 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: royal engg cert oct23.pdf30 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: royal ca cert apr23.pdf30 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: royal ca cert jly23.pdf30 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: royal CA cert oct23.pdf30 Nov 2023
Disclosure of sold/ booked inventoryFile: booked inventory sep23 RR.pdf21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: royal ranches engg cert.pdf21 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: royal ranches annexure F form5.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-ROYAL RANCHES.pdf5 Aug 2023
Declaration in FORM BFile: Form B - Royal Ranches.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2-A - Royal Ranches.pdf16 May 2023
Disclosure of sold/ booked inventoryFile: booked inventory.pdf2 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DEC-22 ROYAL RANCHES.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DEC-22 ROYAL RANCHES.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A QUALITY ASSURANCE.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: BOOKING DEC-22 ROYAL RANCHES.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE DEC-22 ROYAL RANCHES.pdf16 Feb 2023
Proforma of Agreement for saleFile: Agreement for Sale - Royal Ranches - Maharera - Draft.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ROYAL RANCHES CA CERTIFICATE sept22.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ROYAL RANCHES CA CERTIFICATE 21-22.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: IKON BUILDCON ENGINEER CERTIFICATE SEPT22.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ROYAL RANCHESARCHITECT CERTIFICATE SEPT22.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: royal ranches architect cert june 22-1.pdf10 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certi.pdf10 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch certificate royal ranches.pdf30 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cert royal ranches.pdf30 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE ROYAL RANCHES_compressed.pdf30 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: royal ranches annex 2A.pdf6 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE ROYAL RANCHES.pdf18 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE ROYAL RANCHES.pdf18 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate royal ranches_compressed.pdf18 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ROYAL RANCHES AUDIT REPORT AS 22-01-22.pdf7 Mar 2022
Building plan approval or NA orderFile: ROYAL RANCHES FINAL NA ORDER.pdf30 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: ROYAL RANCHES FINAL NA ORDER.pdf30 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: ROYAL RANCHES FINAL NA ORDER.pdf30 Oct 2020
Declaration in FORM BFile: Form - B - Declaration - Royal Ranches (2).pdf30 Oct 2020
Layout approvalFile: Layout Plan - Pendhari - Royal Ranches.pdf29 Oct 2020
PAN CardFile: Mustafa Hassonji - PAN Card.pdf29 Oct 2020
PAN CardFile: Masood Hasan - PAN Card.pdf29 Oct 2020
Copy of the legal title reportFile: Search Royal Ronches Scaned Copy.PDF29 Oct 2020
Details of encumbrancesFile: no encumbrance certificate (1).pdf29 Oct 2020
Copy of Layout Approval (in case of layout)File: Layout Plan - Pendhari - Royal Ranches.pdf29 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Pendhari.pdf29 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Royal Ranches.pdf29 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Royal Ranches.pdf29 Oct 2020
Proforma of Allotment letterFile: Allotment letter - Royal Ranches - Draft.pdf29 Oct 2020
Proforma of Allotment letterFile: Agreement for Sale - Royal Ranches - Maharera - Draft.pdf29 Oct 2020

How this compares with Nagpur

40%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Royal Ranches on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hingna2,800+ in Nagpur

Builder: Mustafa Ali Shabbar Hassonjee

Mustafa Ali Shabbar Hassonjee has 1 registration on MahaRERA, including Royal Ranches. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Royal Ranches is delayed beyond 29 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Royal Ranches?

The registered promoter entity is Mustafa Ali Shabbar Hassonjee, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Royal Ranches?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Royal Ranches?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Royal Ranches?

The professionals named in the filing: Architect: N K Palsapure; Engineer: N K Palsapure; Chartered Accountant: Ali Hatim Husain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Royal Ranches?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Royal Ranches. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Royal Ranches to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.