ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ROYAL HOMES PHASE I

Registration lapsed No litigation declared Others project

ROYAL HOMES PHASE I

By SHRI SHIRSAI BUILDERS AND DEVELOPERS

RG-MH-13151 · RERA P52100022511 · Last updated on MahaRERA portal: 17 Oct 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 38 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2023Possession promised38 months past this date
24 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

ROYAL HOMES PHASE I is a Others project by SHRI SHIRSAI BUILDERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100022511 on 30 Sep 2019. Possession was promised by 15 Aug 2023 and is now 38 months past that date.

At a glance

Project

  • NameROYAL HOMES PHASE I
  • TypeOthers
  • Location
    • JALOCHI MIDC ROAD
    • BEHIND NAKSHTRA GARDEN
    • Jalochi
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • RERA no.P52100022511
  • ReraGenie IDRG-MH-13151

Builder

  • NameSHRI SHIRSAI BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersLAXMAN MAHADU JEDGE, YOGESH BHAGWAN PANSARE, ATUL ARVIND GAIKWAD

Key dates

38 months past promisethis monthRegisteredSep 2019PromisedAug 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on30 Sep 2019
  • Promised completion15 Aug 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA80000
BUILDING BNA80000
BUILDING CNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING A73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership95

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners95
LandownerVillageDistrict
DATTATRAY MAHADEO CHOUDHARRuiPune
UMESH RAMKUSHNA BHAGWATDaund (CT)Pune
POOJA SAMIR SHITOLEKurkumbhPune
SANTOSH TUKARAM ZAGADEPandharwadiPune
LATIKA JANARDHAN DHPHALKurkumbhPune
MAHESH ANATRAO KENJALEDaund (CT)Pune
MAHADEO KISAN RAYKARAmbi KhPune
ASHOK RAMCHANDRA KULANGEpandhrewadiPune
PRITSINH VIJAY SHITOLEpandhrewadiPune
SATISH PARSHURAM SHITOLEpandhrewadiPune
SUREKHA NAVNATH SATPUTEPandharwadiPune
SAKSHI ABHIJIT KONDEJKARDaund (CT)Pune
MAHAVIR SAMBHAJI KOKRESonwadiPune
DIPAK ARJUN GAVALIParitwadiAhmednagar
NITIN NAMDEO SHINDERotiPune
SUNIL PANDURANG PANSAREJalochiPune
SACHIN SHIVAJI ABHANGBijwadiPune
NILAM DATTATRAY CHOUDHARRuiPune
BALASAHEB BABAN DHAIGUDESukhedSatara
VIJAY GULAB BHAGWATpandhrewadiPune
AMOL RAMHARI PHAVADEPatasPune
GORAKSHANATH BHAGWAN WABALEWarwandPune
RAVINDRA MADHUKAR KUMBHARWasundePune
RAJESHRI DHANANJAY BHAGWATpandhrewadiPune
MADHAV BHALCHANDRA SOLUNKEAWALKONDALatur
NALINI RAJENDRA SHITOLEKurkumbhPune
NANDA GANPAT DHAVADEDaund (CT)Pune
ABASO MAHADEO ATOLEShirsuphalPune
SAMIR SURESH SHITOLEKurkumbhPune
DADA BHAU DALIMBEDaund (CT)Pune
ARTI MACHINDRA KUDALEBaburdiPune
BABASO RAMCHANDRA SANGALERavangaonPune
HEMLATA SUBHASH SHINDERavangaonPune
SANDIP HIRAMAN DHAGEWarwandPune
JAYRAM ABA SANGALERavangaonPune
DILIP RAMCHANDRA BHAGWATKurkumbhPune
NAVNATH MOHAN KULANGEKurkumbhPune
MAYUR RAMDAS JADHAVBelewadiPune
DILIP BAYAJI WANAVEPatasPune
RATNMALA DILIP WANAVEPatasPune
KALPANA DATTATRAY WANAVEMumbai CityMumbai City
NARAYAN RAMLING GHOLAPKadaBeed
NANDKISHOR SHASHIKANT BHOSALEBhawaninagarPune
SWATI PRAKASH ZAGADEpandhrewadiPune
APPA SHIVAJI PARKALEAnjangaonPune
MEENA MADHUKAR PHADBaramati RuralPune
VIJAY BABURAO DARADEJalochiPune
NANDKUMAR MADHAV KULKARNIKedgaon StationPune
SATYAWAN GANPAT DHAGESonwadiPune
AMOL POPAT KADAMJalkewadiPune
TULSIRAM MAIKUJI PIPARDE (MEHAR)KurkumbhPune
CHAYA MAHADEV PAGAREDaund (CT)Pune
SUDHIR RAMESH GAYKAWADGultekadiPune
SANTOSH DATTATRYA HOLEPatasPune
ROHIDAS NARAYAN BHUJBALNagapur (CT)Ahmednagar
ROHINI RAJENDRA SURYAWANSHIWarjePune
NANA GAJANAN BHAPKARPatasPune
PRADIP HANUMANT SHELAKEJalgaon Kade PatharPune
ARVIND BHIVAJI JADHAVJiregaonPune
RAJU LAXMAN JADHAVGirimPune
SANDIPAN BAPURAO REDAKEKalthan No.2Pune
BALKRUSHNA SHIVRAM BHAGWATKurkumbhPune
NAMDEO NIVRUTTI ATOLEParwadiPune
KIRAN BABANRAO JAGTAPSansarPune
RAMCHANDRA KISAN GADHAVERavangaonPune
JYOTI ABHAY BHOSALEJankshanPune
NILIMA NITIN THORATSongaonPune
SUNITA SANDIP ZAGADEpandhrewadiPune
SANDIP ATMARAM ZAGADEpandhrewadiPune
SACHIN CHAGANRAO PASALKARDaund (M Cl)Pune
VRUSHALI SUBHASH ZAGADEKurkumbhPune
NARAYAN KERABA KHATAKEMaladpatasPune
LAXMAN MAHADU JEDAGEMaladpatasPune
MALHARI MAHADU JEDAGEMaladpatasPune
KISHOR UTTAM DESHMUKHBaramati (M Cl)Pune
NAVNATH MADHUKAR GAWADEChambharliRaigarh
DAYA KRUSHNA GHODKEWarjePune
RUPESH DINANATH SALUNKEIndapur (M Cl)Pune
MANISHA MACHINDRA HIVARKARShirsuphalPune
DIPAK MAHADEO MEHTREShirsuphalPune
RAMKRUSHNA DNYANDEO JAGTAPDaund (CT)Pune
SULOCHANA BALKRUSHNA KHARATNimsakharPune
BALU VISHWNATH ZAGADEKurkumbhPune
RAVINDRA VANSAT AHIWALEKatphalPune
AJIT ASHOKRAO SHITOLEPatasPune
NILESH VASANTRAO NIMBALKARpandhrewadiPune
PRASHANT ABASO PAWARRajuriSatara
HANUMANT MOHAN PAWARRajuriSatara
JYOTI BALASO KALEBaramati (M Cl)Pune
SANDIP RAGHUNATH KEDKARPathardi(MC)Ahmednagar
SHIVAJI WAMAN ATOLEShirsuphalPune
RAVINDRA YASHWANT KHOMANEJalgaon SupePune
ARVIND YASHWANT KHOMANEJalgaon SupePune
ASHWINI RAMESH PAWARKhadakiPune
ASHRU DATTATRAY MISKIN PA UMESH RAMKRISHNA BHAGWATRuiPune

Approvals and building plan

Permissible FSI15487.0
Proposed, not sanctioned10,216 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNAGAR PARISHAD BUILDING BARAMATI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS HARSHAL ROKADE & ASSOCIATES
EngineerMR NILESH SHINDE
Chartered AccountantJSPM AND COMPANY
PartnerRole in project
SHRI SHIRSAI BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Oct 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf17 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certificate.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shirsai-Architect Certificate_compressed.pdf9 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report.pdf9 Apr 2023
Building plan approvalFile: Revised Plan 1.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 2.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 3.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 4.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 5.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 5.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 6.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 7.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 8.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 9.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 10.pdf19 Aug 2020
Building plan approvalFile: Revised Plan 11.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 1.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 2.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 3.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 4.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 5.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 5.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 6.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 7.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 8.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 9.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 10.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 11.pdf19 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate.pdf19 Aug 2020
Proforma of Allotment letterFile: Format for Rera Agreement.pdf22 Sep 2019
PAN CardFile: PAN.pdf10 Sep 2019
Copy of the legal title reportFile: Search of Project.pdf4 Sep 2019
Building plan approvalFile: Plan 7.pdf3 Sep 2019
Building plan approvalFile: Plan 8.pdf3 Sep 2019
Building plan approvalFile: Plan 9.pdf3 Sep 2019
Building plan approvalFile: Plan 10.pdf3 Sep 2019
Building plan approvalFile: Plan 11.pdf3 Sep 2019
Layout approvalFile: NA Order.pdf3 Sep 2019
Building plan approvalFile: Plan 1.pdf3 Sep 2019
Building plan approvalFile: Plan 2.pdf3 Sep 2019
Building plan approvalFile: Plan 3.pdf3 Sep 2019
Building plan approvalFile: Plan 4.pdf3 Sep 2019
Building plan approvalFile: Plan 5.pdf3 Sep 2019
Building plan approvalFile: Plan 6.pdf3 Sep 2019
Details of encumbrancesFile: Encumbrances Cerificate.pdf3 Sep 2019
Copy of Layout Approval (in case of layout)File: NA Order.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 8.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 9.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 10.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Plan 11.pdf3 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Sep 2019
Declaration in FORM BFile: Form B of Builder.pdf3 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate.pdf3 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf3 Sep 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Sep 2019
Proforma of Allotment letterFile: Allotment Letter.pdf3 Sep 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROYAL HOMES PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND NAKSHTRA GARDEN13,700+ in Pune

Builder: SHRI SHIRSAI BUILDERS AND DEVELOPERS

SHRI SHIRSAI BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including ROYAL HOMES PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ROYAL HOMES PHASE I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ROYAL HOMES PHASE I is delayed beyond 15 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROYAL HOMES PHASE I?

The registered promoter entity is SHRI SHIRSAI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROYAL HOMES PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROYAL HOMES PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROYAL HOMES PHASE I?

The professionals named in the filing: Architect: MS HARSHAL ROKADE & ASSOCIATES; Engineer: MR NILESH SHINDE; Chartered Accountant: JSPM AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL HOMES PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL HOMES PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL HOMES PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.