Home / Browse projects / Nagpur, Maharashtra / ROYAL CITY

Registered No litigation declared Plotted project

ROYAL CITY

By TARMAL INFRA

RG-MH-94619 · RERA P50500053686 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
39 of 81Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

ROYAL CITY is a Plotted project by TARMAL INFRA in Nagpur, Maharashtra, registered with MahaRERA as P50500053686 on 22 Nov 2023. Possession is promised by 31 Dec 2029. 42 of the 81 units on this registration are recorded sold or booked.

At a glance

Project

  • NameROYAL CITY
  • TypePlotted
  • Location
    • PH 44
    • KATOL
    • Katol (M Cl)
    • Nagpur
    • 441302
  • Pincode441302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053686
  • ReraGenie IDRG-MH-94619

Builder

  • NameTARMAL INFRA
  • Entity typePartnership
  • PartnersMUSTUFA ZOEB BHAI GULZAR, YOUSUF HASSAN ALI BAHRAINWALA, ZOHER HUSAIN ZAHID HUSAIN SAIFEE

Key dates

this monthRegisteredNov 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Nov 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed76 files

Current status

52%42 of 81 units booked
89.5%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes89%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes74%
Street LightingYes74%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,977 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Aug 2025

Approvals and building plan

Sanctioning authorityNagar Parishad Katol

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1157,CA ROAD,NEAR ADARSH VIDYA MANDIR AND HOTEL INDIA SUN,GANDHIBAG,NAGPUR
Estimated costRs 9.79 cr
Cost incurredRs 8.76 cr
Work done89.49%
BuildingWingEstimatedIncurred
-NARs 9.79 crRs 8.76 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHISH N KHOBRAGADE
EngineerWILL UPADTE LATER
EngineerAshfaque Husain
Chartered AccountantAGARWAL HUSAIN AND ASSOCIATES
Chartered AccountantSonali Singhal
PartnerRole in project
TARMAL INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1- royal City.pdf23 May 2026
Withdrawal Update Form 2File: form 2- royal City.pdf23 May 2026
Withdrawal Update Form 3File: form 3- royal City.pdf23 May 2026
Withdrawal Update Form 1File: Form1 Tarmal dec25.pdf6 Mar 2026
Withdrawal Update Form 2File: Form2 Tarmal dec25.pdf6 Mar 2026
Withdrawal Update Form 3File: Form3 Tarmal dec25.pdf6 Mar 2026
Withdrawal Update Form 1File: Form1 July-Sep25 Tarmal.pdf5 Dec 2025
Withdrawal Update Form 2File: Form2 July-Sep25 Tarmal.pdf5 Dec 2025
Withdrawal Update Form 3File: Form3 July-Sep25 Tarmal.pdf5 Dec 2025
Withdrawal Update Form 1File: Form1 tarmal April june25.pdf4 Dec 2025
Withdrawal Update Form 2File: Form2 Tarmal April june25.pdf4 Dec 2025
Withdrawal Update Form 3File: Form3 Tarmal April june 25.pdf4 Dec 2025
Form 5 (FY 2024-2025)File: Form5 24-25 Tarmal.pdf2 Dec 2025
Withdrawal Update Form 1File: Form1 tarmal April june25.pdf7 Aug 2025
Withdrawal Update Form 2File: Form2 Tarmal April june25.pdf7 Aug 2025
Withdrawal Update Form 3File: Form3 Tarmal April june 25.pdf7 Aug 2025
Withdrawal Update Form 1File: Form1 tarmal April june25.pdf6 Aug 2025
Withdrawal Update Form 2File: Form2 Tarmal April june25.pdf6 Aug 2025
Withdrawal Update Form 3File: Form3 Tarmal April june 25.pdf6 Aug 2025
Withdrawal Update Form 1File: Form1 Jan-March25.pdf25 Jun 2025
Withdrawal Update Form 2File: Form2 Jan-March25 TARMAL.pdf25 Jun 2025
Withdrawal Update Form 3File: Form3 Jan-March25 TARMAL.pdf25 Jun 2025
Form 1File: Form1 Nov-dec23 Tarmal.pdf24 Jun 2025
Form 2File: FORM 2 Nov-Dec23.pdf24 Jun 2025
Form 3File: Form3 Nov-Dec23 Tarmal.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Nov-Dec23.pdf24 Jun 2025
Form 3File: Form3 Jan-March24 Tarmal.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Jan-March24.pdf24 Jun 2025
Form 1File: Form1 Jan-March24 Tarmal.pdf24 Jun 2025
Form 2File: Form2 Jan-March24 TARMAL (1).pdf24 Jun 2025
Form 1File: Form1 April-June24 TARMAL.pdf24 Jun 2025
Form 2File: Form2 April-June24Tarmal.pdf24 Jun 2025
Form 3File: Form3 April-June24 Tarmal.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory April-June24.pdf24 Jun 2025
Form 1File: Form1 July-Sep24 TARMAL.pdf24 Jun 2025
Form 2File: Form2 July-Sep24 TARMAL.pdf24 Jun 2025
Form 3File: Form3 July-Sep24 Tarmal.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory July-Sep24.pdf24 Jun 2025
Form 1File: Form1 Oct-Dec24 TARMAL.pdf24 Jun 2025
Form 2File: Form2 Oct-Dec24 TARMAL.pdf24 Jun 2025
Form 3File: Form3 Oct-Dec24 Tarmal.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Oct-Dec24.pdf24 Jun 2025
Form 1File: Form1 Jan-March25.pdf24 Jun 2025
Form 2File: Form2 Jan-March25 TARMAL.pdf24 Jun 2025
Form 3File: Form3 Jan-March25 TARMAL.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Jan-March25.pdf24 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A (1).pdf24 Jun 2025
Form 5 (FY 2023-2024)File: Form5 23 to 24 TARMAL.pdf24 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TARMAL INFRA FORM3.pdf21 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: TARMAL INFRA CC.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TARMAL VERIFICATION MAIL.pdf23 Oct 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL (2).pdf20 Oct 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL (2).pdf20 Oct 2023
CERSAI detailsFile: CERSAI UNDERTAKING.pdf18 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSER OF INTEREST IN OTHER ORGANISATION_compressed.pdf13 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: TARMAL SEPRATE ACCOUNT DETAILS.pdf13 Oct 2023
Other - LegalFile: PARTNERSHIP DEED_compressed TARMAL.pdf13 Oct 2023
Copy of the legal title reportFile: SALE DEED_compressed.pdf22 Sep 2023
Layout approvalFile: SANCTION DRAWING_compressed.pdf21 Sep 2023
Building plan approval or NA orderFile: 15 MAY 2023_compressed.pdf21 Sep 2023
PAN CardFile: TARMAL PANCARD.pdf21 Sep 2023
Copy of the legal title reportFile: Legal Title Report_compressed.pdf21 Sep 2023
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf21 Sep 2023
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf21 Sep 2023
Copy of Layout Approval (in case of layout)File: SANCTION DRAWING_compressed.pdf21 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 15 MAY 2023_compressed.pdf21 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: 15 MAY 2023_compressed.pdf21 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: काटोल_1051_Satbara.pdf21 Sep 2023
Declaration about Commencement CertificateFile: Deviation of CC.pdf21 Sep 2023
Declaration in FORM BFile: Form-B_compressed.pdf21 Sep 2023
CERSAI detailsFile: Latest CERSAI ROyal City.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 TARMAL INFRA_compressed.pdf21 Sep 2023
Proforma of Agreement for saleFile: Model Form of Agreement_compressed.pdf21 Sep 2023
Proforma of Allotment letterFile: THE MODEL ALOTMENT LETTER_compressed.pdf21 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Report With Respect to the Allotment Letter.pdf21 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation copy of Agreement.pdf21 Sep 2023

How this compares with Nagpur

52%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROYAL CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATOL2,800+ in Nagpur

2 kmROYAL CITYCompleted 4Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: TARMAL INFRA

TARMAL INFRA has 1 registration on MahaRERA, including ROYAL CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ROYAL CITY is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROYAL CITY?

The registered promoter entity is TARMAL INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROYAL CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROYAL CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROYAL CITY?

The professionals named in the filing: Architect: ASHISH N KHOBRAGADE; Engineer: WILL UPADTE LATER; Engineer: Ashfaque Husain; Chartered Accountant: AGARWAL HUSAIN AND ASSOCIATES; Chartered Accountant: Sonali Singhal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.