Home / Browse projects / Raigarh, Maharashtra / ROSEWOOD BUILDING NO. 1

Completed No litigation declared Others project

ROSEWOOD BUILDING NO. 1

By SVS GROUPS

RG-MH-39857 · RERA P52000011741 · Last updated on MahaRERA portal: 17 May 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 80%
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

ROSEWOOD BUILDING NO. 1 is a Others project by SVS GROUPS in Raigarh, Maharashtra, registered with MahaRERA as P52000011741 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2023. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameROSEWOOD BUILDING NO. 1
  • TypeOthers
  • Location
    • Kajat
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000011741
  • ReraGenie IDRG-MH-39857

Builder

  • NameSVS GROUPS
  • Entity typePartnership
  • PartnerVIJAY CHANDRAKANT JADHAV

Key dates

this monthRegisteredAug 2017First promiseMar 2022Revised toMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Mar 2023
  • Revised completionRevised to 30 Mar 2023 (originally 30 Mar 2022)
  • Buildings1 building record
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROSEWOODNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

ROSEWOOD: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%

Progress on shared amenities16

As on 17 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Club House Common for Gut No 1042 Plot No 1 and 2Yes0%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Open Space104

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,023 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
HARISHCHANDRA VISHNU KAMBLEDahiwali T. WarediRaigarh

Approvals and building plan

Permissible FSI1617.28
Proposed, not sanctioned1,617 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShreeji Develoeprs, Katrap Naka, Badlapur East

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU RACHANA CONSULTANCY
EngineerATUL KUDTARKAR AND ACCOCIATES
Chartered AccountantAMRRITA JAGANAANI
PartnerRole in project
SVS GROUPS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000011653Mar 2022 → Mar 2023

Reason as filed by the promoterCOVID 19

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 May 2023

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE (FORM 1).pdf17 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf17 May 2023
Certificates of CA (Form 3)File: SVS GROUP FORM 3.pdf17 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SVS GROUP Occupancy Certificate.pdf17 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECTS CERTIFICATE (FORM 4).pdf17 May 2023
Certificates of CA (Form 3)File: SVS GROUP FORM 3 FINAL.pdf12 Nov 2022
Details of encumbrances concerned to FinanceFile: Non-Encumbrances Certificate-Legal.pdf7 Nov 2022
Details of encumbrances concerned to FinanceFile: Non-Encumbrances Certificate-Fincance.pdf7 Nov 2022
Details of encumbrances concerned to LegalFile: Non-Encumbrances Certificate-Legal.pdf7 Nov 2022
Details of encumbrances concerned to LegalFile: Non-Encumbrances Certificate-Fincance.pdf7 Nov 2022
Declaration about Commencement CertificateFile: SVS CC.pdf7 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SVS FORM 1_compressed.pdf7 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SVS FORM2_compressed.pdf7 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200251569763_For_Asset_Based_Search_07_11_2022_17_19_50_082.pdf7 Nov 2022
Certificates of CA (Form 3)File: SVS FORM 3_compressed.pdf7 Nov 2022
Proforma of Allotment letterFile: svs AGREEMENT FOR SALE.pdf7 Nov 2022
Proforma of Agreement for saleFile: svs AGREEMENT FOR SALE.pdf7 Nov 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER_compressed.pdf7 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details.pdf7 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation.pdf7 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Final.pdf7 Nov 2022
Certificates of CA (Form 3)File: Attested Form 3_compressed.pdf29 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect_compressed (2).pdf4 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer_compressed.pdf4 Mar 2022
Building plan approvalFile: BLUE PRINT ROSEWOOD.pdf31 Jul 2017
Layout approvalFile: BLUE PRINT ROSEWOOD.pdf31 Jul 2017
PAN CardFile: PAN.pdf31 Jul 2017
Copy of the legal title reportFile: SEARCH REPORT.pdf31 Jul 2017
Details of encumbrancesFile: NON ENCUMBRANCES.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: BLUE PRINT ROSEWOOD.pdf31 Jul 2017
Building Plan Approval (IOD)File: BLUE PRINT ROSEWOOD.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Bandhkam Parvangi Arj.pdf31 Jul 2017
Declaration in FORM BFile: FORM B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE BUILDING NO 1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE BUILDING 1.pdf31 Jul 2017
Certificates of CA (Form 3)File: C A CERTIFICATE BUILDING 1(C).pdf31 Jul 2017
Proforma of Allotment letterFile: AGGREMENT FOR SALE AND ALLOTMENT LETTER.pdf31 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROSEWOOD BUILDING NO. 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karjat5,900+ in Raigarh

2 kmROSEWOOD BUILDING NO. 1Completed 47Lapsed / revoked 30Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: SVS GROUPS

SVS GROUPS has 1 registration on MahaRERA, including ROSEWOOD BUILDING NO. 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ROSEWOOD BUILDING NO. 1 is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROSEWOOD BUILDING NO. 1?

The registered promoter entity is SVS GROUPS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROSEWOOD BUILDING NO. 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROSEWOOD BUILDING NO. 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROSEWOOD BUILDING NO. 1?

The professionals named in the filing: Architect: VASTU RACHANA CONSULTANCY; Engineer: ATUL KUDTARKAR AND ACCOCIATES; Chartered Accountant: AMRRITA JAGANAANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROSEWOOD BUILDING NO. 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROSEWOOD BUILDING NO. 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROSEWOOD BUILDING NO. 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.