Home / Browse projects / Pune, Maharashtra / RKL Shivpuram

Registered Litigation declared Others project

RKL Shivpuram

By LUNKAD VISHWA DEVELOPERS

RG-MH-41712 · RERA P52100053028 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
7 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 90%
192 of 268Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

RKL Shivpuram is a Others project by LUNKAD VISHWA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100053028 on 10 Oct 2023. Possession is promised by 31 Dec 2031. 76 of the 268 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete.

At a glance

Project

  • NameRKL Shivpuram
  • TypeOthers
  • Location
    • Tajne mala road
    • Charholi Pune
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100053028
  • ReraGenie IDRG-MH-41712

Builder

  • NameLUNKAD VISHWA DEVELOPERS
  • Entity typePartnership
  • PartnersSANJAY DHANRAJ GATAGAT, PARIKSHIT PRAKASH NAHAR, VILAS FULCHAND MUTTHA, PRASHANT PRAKSH NAHAR
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2023PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2023
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed98 files

Current status

28%76 of 268 units booked
49.2%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B BuildingNA14118718105
C BuildingNA141293093
D buildingNA101070070

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 90%.

B Building62%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises29%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
C Building61%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises29%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
D building30%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks44%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed215

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots215
Closed/Covered215
BuildingClosed/CoveredTotal
B Building105105
C Building5858
D building5252

Land and ownership18

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,690 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2025
LandownerVillageDistrict
Yogesh TapkirCHARHOLIPune
Anil Sudam Tapkir-Pune
Chabu TapkirCHARHOLIPune
Deepa Haridas HarichandreAlandi RuralPune
Gulab TapkirCHARHOLIPune
Kashinath TapkirCHARHOLIPune
Pooja ThitaShirurPune
Shantaram TapkirAlandi RuralPune
Shivaji TapkirCHARHOLIPune
Shraddha BhalekarAlandi RuralPune
Yamunabai TapkirAlandi RuralPune
Geetanjali TapkirCHARHOLIPune
Subhas TapkirAlandi RuralPune
DNYANESHWAR KESHAV TAPKIRCHARHOLIPune
SURESH KESHAV TAPKIRCHARHOLIPune
MUKTABAI YASHVANT TAPKIRCHARHOLIPune
Tapkir Dnyaneshwar KeshavCHARHOLIPune
Surseh Keshav TapkirCHARHOLIPune

Approvals and building plan

Sanctioning authorityPimri chinchwad muncipality corporation
Permissible FSI39351.24
Proposed, not sanctioned11,111 sq m
Buildings approved5
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThergoan Pune 411033
Estimated costRs 58.40 cr
Cost incurredRs 28.73 cr
Work done49.2%
BuildingWingEstimatedIncurred
B BuildingNARs 22.00 crRs 19.00 cr
D buildingNARs 18.70 crRs 8.13 cr
C BuildingNARs 14.70 crRs 10.00 lakh
-NARs 3.00 crRs 1.50 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA and T Consultants
EngineerSunil Mutalik and Asso
Chartered AccountantMuttha and Lahoti
PartnerRole in project
LUNKAD VISHWA DEVELOPERS-

Litigation declared3

CaseCourtStatus
240/2014/2014Civil Judge Junior DivisionClosed
1437/2015/2015Civil Judge Senior DivisionOngoing
38/2016/2016Additional director of land recordsClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 RKL SHIVPURAM (3).pdf16 Apr 2026
Withdrawal Update Form 2File: form 2 RKL SHIVPURAM.pdf16 Apr 2026
Withdrawal Update Form 3File: FORM 3 RKL SHIVPURAM.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1 Shivpuram updated-DEC 25.pdf19 Jan 2026
Withdrawal Update Form 2File: form 2 rkl shivpuram dec 2025.pdf19 Jan 2026
Withdrawal Update Form 3File: FORM 3 RKL SHIVPURAM.pdf19 Jan 2026
Form 2A (FY 2024-2025)File: Form 2 A dec 2025 381 - Copy.pdf17 Jan 2026
Building plan approvalFile: D building floor plan 1 - converted.pdf11 Dec 2025
Withdrawal Update Form 1File: RKL Shivpuram sept 2025Form 1.pdf19 Oct 2025
Withdrawal Update Form 2File: RKL Shivpuram sept 2025Form 2.pdf19 Oct 2025
Withdrawal Update Form 3File: FORM 3 RKL SHIVPURAM june 2025 (1).pdf19 Oct 2025
Form 5 (FY 2024-2025)File: RKl Shivpuram form 5 sept 2025.pdf18 Oct 2025
Withdrawal Update Form 1File: Form 1 rkl shivpuram june 2025.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2 rkl shivpuram june 2025.pdf16 Oct 2025
Withdrawal Update Form 3File: FORM 3 RKL SHIVPURAM june 2025 (1).pdf16 Oct 2025
Layout approvalFile: layout.pdf16 Aug 2025
Building plan approvalFile: A building floor plan 1.pdf16 Aug 2025
Building plan approvalFile: A building floor plan 2.pdf16 Aug 2025
Building plan approvalFile: A building floor plan 3.pdf16 Aug 2025
Building plan approvalFile: B building floor plan 1.pdf16 Aug 2025
Building plan approvalFile: B building floor plan 2.pdf16 Aug 2025
Building plan approvalFile: B building floor plan 3.pdf16 Aug 2025
Building plan approvalFile: C building floor plan 1.pdf16 Aug 2025
Building plan approvalFile: C building floor plan 2.pdf16 Aug 2025
Building plan approvalFile: Commercial building floor plan 1.pdf16 Aug 2025
Building plan approvalFile: commercial building floor plan 2.pdf16 Aug 2025
Withdrawal Update Form 1File: form1 rkl shivpuram june 2025 (1).pdf29 Jul 2025
Withdrawal Update Form 2File: form 2 rkl shivpuram june 2025 (1).pdf29 Jul 2025
Withdrawal Update Form 3File: FORM 3 RKL SHIVPURAM june 2025 (1).pdf29 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shivpuram_March 2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shivpuram_March 2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shivpuram_March 2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2).pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: RKL SHIVPURAM (1).pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shivpuram.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shivpuram (1).pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A dec 2024 381 - Copy.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: doc14639820241029110456.pdf2 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SHIVAPURAM Signed.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shivpuram.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shivpuram.pdf18 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: 381.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed 381.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed 381.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed (3) 381.pdf22 Jul 2024
Layout approvalFile: 01 - 16 LAYOUT.pdf6 Jul 2024
Building plan approvalFile: 13 - 16 D- BLDG.pdf6 Jul 2024
Copy of Layout Approval (in case of layout)File: 01 - 16 LAYOUT.pdf6 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 13 - 16 D- BLDG.pdf6 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate - converted.pdf6 Jul 2024
Declaration about Commencement CertificateFile: Declaration about Cc JULY 2024.pdf6 Jul 2024
Proforma of Agreement for saleFile: 381 SOURCE Agreement draft final.pdf21 May 2024
Deviation Report with respect to model copy of AgreementFile: deviation 381 23 april 2024.pdf21 May 2024
Declaration about Commencement CertificateFile: Declaration about CC RKL SHIVPURAM.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RKL Shivpuram signed.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RKL Shivpuram signed.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 22 march 2024 381.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RKL Shivpuram signed.pdf19 Apr 2024
Layout approvalFile: LAYOUT april 2024.pdf9 Apr 2024
Building plan approvalFile: B wing.pdf9 Apr 2024
Building plan approvalFile: D wing.pdf9 Apr 2024
Copy of Layout Approval (in case of layout)File: LAYOUT april 2024.pdf9 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: B wing.pdf9 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: D wing.pdf9 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement april 2024.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 DEC 23.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RKL SHIVPURAM DEC 23.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 DEC 23 RKL SHIVPURAM.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 22 annual 381.pdf6 Jan 2024
Layout approvalFile: sanctioned layout 2023_page-0001.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: sanctioned layout 2023_page-0001.pdf14 Sep 2023
Copy of the legal title reportFile: ilovepdf_merged-1-22_11zon.pdf5 Sep 2023
Copy of the legal title reportFile: ilovepdf_merged-23-44_11zon.pdf5 Sep 2023
Details of encumbrances concerned to FinanceFile: SR NO 381 NO ENCUMBRANCES CONCERNED TO FINANCE organized.pdf5 Sep 2023
Details of encumbrances concerned to FinanceFile: SR NO 381 ENCUMBRANCES CONCERNED TO LEGAL organized.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: SR NO 381 NO ENCUMBRANCES CONCERNED TO FINANCE organized.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: SR NO 381 ENCUMBRANCES CONCERNED TO LEGAL organized.pdf5 Sep 2023
Declaration about Commencement CertificateFile: SRNO 381 DECLARATION ACCorganized.pdf5 Sep 2023
Declaration in FORM BFile: 381 form B.pdf5 Sep 2023
CERSAI detailsFile: SR NO 381 UNDERTAKING orga.pdf5 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shivpuram A building LitigationCharholi Pune 41210542CompletedJan 2019Jan 2019

How this compares with Pune

28%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RKL Shivpuram on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charholi Pune13,700+ in Pune

Builder: LUNKAD VISHWA DEVELOPERS

LUNKAD VISHWA DEVELOPERS has 2 registrations on MahaRERA, including SHIVPURAM A PLOT A and RKL Shivpuram. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RKL Shivpuram is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RKL Shivpuram?

The registered promoter entity is LUNKAD VISHWA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RKL Shivpuram?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RKL Shivpuram?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RKL Shivpuram?

The professionals named in the filing: Architect: A and T Consultants; Engineer: Sunil Mutalik and Asso; Chartered Accountant: Muttha and Lahoti. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RKL Shivpuram?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RKL Shivpuram. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RKL Shivpuram to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.