Home / Browse projects / Raigarh, Maharashtra / RIVERGATE ARANYA
RIVERGATE ARANYA
By RIVERGATE RESORT (INDIA) LTD.
RG-MH-10972 · RERA P52000002713 · Last updated on MahaRERA portal: 28 Nov 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RIVERGATE ARANYA is a Plotted project by RIVERGATE RESORT (INDIA) LTD. in Raigarh, Maharashtra, registered with MahaRERA as P52000002713 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 5 of the 93 units on this registration are recorded sold or booked.
At a glance
Project
- NameRIVERGATE ARANYA
- TypePlotted
- Location
- Kalamboli Tarf Waredi
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000002713
- ReraGenie IDRG-MH-10972
Builder
- NameRIVERGATE RESORT (INDIA) LTD.
- Entity typeCompany
- ChairpersonCHANDAN MAGRAJ PARMAR
- Managing DirectorsRAJESH RAGHAVJI PATEL, HARISH RAGHAVJI PATEL, AMIT VIJAY POKARNA
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Aug 2017
- Promised completion30 Dec 2022
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed138 files
Current status
Figures as on 28 Nov 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities18
As on 28 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | No | Not applicable |
| Plot Levelling | Yes | 100% |
| Fencing | Yes | 100% |
| Electrical Work LT SIDE | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHIMANT RAWAL |
| Partner | Role in project |
|---|---|
| RIVERGATE RESORT (INDIA) LTD. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Nov 2024
Documents filed138
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 with Letter of non applicability of OC Remarks.pdf | 28 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: INTIMATION OF COMPLETION.pdf | 28 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Rivergate Architect form 4.pdf | 25 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: RIVERGATE RESORT (INDIA) LTD- Form 4 ARCHITECTS CERTIFICATE.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: INTIMATION OF COMPLETION.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 05d 421 Mutation for New Survey No 57 C Plots.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 05c 416 Mutation for C plots NA layout dated 31-5-2010.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 05b C-plot Survey No 57 Collector final NA order.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 05a C Plot Survey no 57 plots Collector approved NA Layout.PDF | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 04d 419 Mutation for New Survey No 55 to amalgamated plots.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 04c 414 Mutation for Amalgamation NA order dated 7-5-2010.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 04b NA order of Resort.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 04a Resort NA Layout.PDF | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 03b 349 Mutation for giving Survey No 53, 54 to plots for final NA order dated 23-5-2003.p | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 03 342 Mutation for NA order dated 21-4-2003, final 23-5-2003.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 02 Survey No 53,54 A and B, FINAL NA ORDER WITH CONSTRUCTION.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 02 Survey No 53 AandB collector approved NA Layout.PDF | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 01b Temporary NA order Survey No 53 plots.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1st Temp Layout survey no 53 Plot A.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY STATEMENT.pdf | 21 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 21 Jun 2024 |
| Declaration about Commencement CertificateFile: NA ORDER Survey Nos 53 54.pdf | 11 Jun 2024 |
| Declaration about Commencement CertificateFile: NA order Survey No 57.pdf | 11 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A ENGINEER CERTIFICATE 2019 20.pdf | 11 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A ENGINEER CERTIFICATE 2020 21.pdf | 11 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A ENGINEER CERTIFICATE 2021 22.pdf | 11 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ENGINEER CERTIFICATE 2022 23.pdf | 11 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FROM 2A ENG CERT 2023 24.pdf | 11 Jun 2024 |
| CERSAI detailsFile: Certificate Of Membership NAREDCO KARJAT.pdf | 11 Jun 2024 |
| Proforma of Agreement for saleFile: Draft Sale Deed.pdf | 11 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 ARCHITEC'S CERT 10-07-2023.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 ARCHITEC'S CERT 09-10-2023.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 ARCHITEC'S CERT 12-01-2024.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 ARCHITEC'S CERT 07-04-2024.pdf | 10 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 ENG CERT-DATE 13-07-2023.pdf | 10 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 ENG CERT-DATE 13-10-2023.pdf | 10 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 ENG CERT-DATE 14-01-2024.pdf | 10 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 ENG CERT-DATE 14-04-2024.pdf | 10 Jun 2024 |
| Certificates of CA (Form 3)File: FORM-3 ARANYA 30-06-2023.pdf | 10 Jun 2024 |
| Certificates of CA (Form 3)File: FORM-3 ARANYA -30-09-2023.pdf | 10 Jun 2024 |
| Certificates of CA (Form 3)File: FORM-3 ARANYA 31-12-2023.pdf | 10 Jun 2024 |
| Certificates of CA (Form 3)File: FORM-3 ARANYA -31-03-2024.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT 30062022.pdf | 4 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT 30092022.pdf | 4 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT 31122022.pdf | 4 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT 31032023.pdf | 4 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER 30062022.pdf | 4 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30092022.pdf | 4 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER 30092022.pdf | 4 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER 31122022.pdf | 4 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER 31032023.pdf | 4 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2 ENGINEER 31122022.pdf | 4 Sep 2023 |
| Certificates of CA (Form 3)File: FORM 3 CA 30062022.pdf | 4 Sep 2023 |
| Certificates of CA (Form 3)File: FORM 3 CA 30092022.pdf | 4 Sep 2023 |
| Certificates of CA (Form 3)File: FORM 3 CA 31122022.pdf | 4 Sep 2023 |
| Certificates of CA (Form 3)File: FORM 3 CA 31032023.pdf | 4 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21.pdf | 17 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-22.pdf | 17 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 30062021.pdf | 7 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 30092021.pdf | 7 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 31122021.pdf | 7 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 31032022.pdf | 7 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30062021.pdf | 7 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30092021.pdf | 7 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31122021.pdf | 7 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31032022.pdf | 7 Sep 2022 |
| Certificates of CA (Form 3)File: FORM 3 30062021.pdf | 7 Sep 2022 |
| Certificates of CA (Form 3)File: FORM 3 30092021.pdf | 7 Sep 2022 |
| Certificates of CA (Form 3)File: FORM 3 31122021.pdf | 7 Sep 2022 |
| Certificates of CA (Form 3)File: FORM 3 31032022.pdf | 7 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RG Form 1 31032021.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RG Form 2 3103 2021.pdf | 6 Sep 2022 |
| Certificates of CA (Form 3)File: RG FORM 3 31032021.pdf | 6 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Rivergate Resort India Ltd-Form 5-RERA.pdf | 16 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT 30062020.pdf | 2 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT 30092020.pdf | 2 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT 31122020.pdf | 2 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER 30062020.pdf | 2 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER 30092020.pdf | 2 Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 138 filed documents as one ZIP, foldered, with a manifest
Keep RIVERGATE ARANYA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalamboli Tarf Waredi5,900+ in Raigarh
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: RIVERGATE RESORT (INDIA) LTD.
RIVERGATE RESORT (INDIA) LTD. has 1 registration on MahaRERA, including RIVERGATE ARANYA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if RIVERGATE ARANYA is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RIVERGATE ARANYA?
The registered promoter entity is RIVERGATE RESORT (INDIA) LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RIVERGATE ARANYA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RIVERGATE ARANYA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RIVERGATE ARANYA?
The professionals named in the filing: Architect: DHIMANT RAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIVERGATE ARANYA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback