Home / Browse projects / Raigarh, Maharashtra / RIVA RYTHM WING A, B, C, D
RIVA RYTHM WING A, B, C, D
RG-MH-86046 · RERA P52000034946 · Last updated on MahaRERA portal: 2 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 27 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RIVA RYTHM WING A, B, C, D is a Mixed project by SAHABHAGI INFRA PVT LTD. in Raigarh, Maharashtra, registered with MahaRERA as P52000034946 on 28 Apr 2022. Possession is promised by 31 Mar 2028. The completion date has moved by 27 months from the original filing. 34 of the 118 units on this registration are recorded sold or booked, and 20 of 38 construction stages are filed complete.
At a glance
Project
- NameRIVA RYTHM WING A, B, C, D
- TypeMixed
- Location
- BARDI VILLAGE ROAD
- BHIVPURI ROAD
- Bardi
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000034946
- ReraGenie IDRG-MH-86046
Builder
- NameSAHABHAGI INFRA PVT LTD.
- Entity typeCompany
- GSTIN27AARCS0268C1Z9
- DirectorSHAMJI KANJI PARSIYA
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Apr 2022
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 31 Dec 2025)
- Buildings4 building records
- Documents filed54 files
Current status
Figures as on 2 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RIVA RYTHM WING A | NA | 5 | 5 | 24 | 5 | 29 |
| RIVA RYTHM WING B | NA | 5 | 5 | 24 | 0 | 24 |
| RIVA RYTHM WING C | NA | 5 | 5 | 24 | 6 | 30 |
| RIVA RYTHM WING D | NA | 5 | 5 | 24 | 11 | 35 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 38 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 20%.
RIVA RYTHM WING A1%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
RIVA RYTHM WING B26%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
RIVA RYTHM WING C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RIVA RYTHM WING D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 30% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| RIVA RYTHM WING A | 7 | 7 |
| RIVA RYTHM WING B | 13 | 13 |
| RIVA RYTHM WING C | 7 | 7 |
| RIVA RYTHM WING D | 3 | 3 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RIVA RYTHM WING D | NA | Rs 2.71 cr | Rs 2.71 cr |
| RIVA RYTHM WING A | NA | Rs 2.48 cr | - |
| RIVA RYTHM WING C | NA | Rs 2.47 cr | Rs 2.47 cr |
| RIVA RYTHM WING B | NA | Rs 2.23 cr | Rs 24.58 lakh |
| - | NA | Rs 1.04 cr | Rs 64.42 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DESTINATION ARCHITECURE DHARMESH BHALANI |
| Engineer | S V PATEL AND ASSOCIATES SURENDRA VELJI PROPRIETOR |
| Engineer | Nitesh Shamji Parasiya |
| Engineer | Ujas Mulchand Chheda |
| Chartered Accountant | L K DEDHIA LAXMICHAND KHERAJ DEDHIA |
| Chartered Accountant | Ravi Vitthaldas Thakkar |
| Partner | Role in project |
|---|---|
| SAHABHAGI INFRA PVT LTD. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to unforeseen circumstances and unavoidable delays in construction, the project could not progress as per the originally proposed timeline. The reasons for the delay include financial constraints, shortage of labour, lack of material availability, force majeure conditions, etc which were beyond our reasonable control.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: SAHABHAGI ABCD WING FORM 1.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: FORM 2 CERTIFICATE.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4.pdf | 2 May 2026 |
| Layout approvalFile: Layout Plan Marked ABCD building.pdf | 5 Mar 2026 |
| Building plan approvalFile: Wing A Building Plan.pdf | 5 Mar 2026 |
| Building plan approvalFile: Wing B Building Plan.pdf | 5 Mar 2026 |
| Building plan approvalFile: Wing C Building Plan.pdf | 5 Mar 2026 |
| Building plan approvalFile: Wing D Building Plan.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 3rd quatar_compressed.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 3rd quatar.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_compressed.pdf | 31 Jan 2026 |
| Withdrawal Update Form 1File: 01 FORM 1 25-26 Q1.pdf | 25 Dec 2025 |
| Withdrawal Update Form 1File: 01 FORM 1 25-26 Q2.pdf | 25 Dec 2025 |
| Withdrawal Update Form 2File: 02 FORM 2 25-26 Q1.pdf | 25 Dec 2025 |
| Withdrawal Update Form 2File: 02 FORM 2 25-26 Q2.pdf | 25 Dec 2025 |
| Withdrawal Update Form 3File: 03 FORM 3 25-26 Q1.pdf | 25 Dec 2025 |
| Withdrawal Update Form 3File: 03 FORM 3 25-26 Q2.pdf | 25 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 24-25 FINAL.pdf | 25 Dec 2025 |
| Form 1File: 01 FORM 1 24-25 A B C D Q4.pdf | 24 Dec 2025 |
| Form 2File: 02 FORM 2 24-25 A B C D Q4.pdf | 24 Dec 2025 |
| Form 3File: 03 FORM 3 24-25 A B C D Q4 C.pdf | 24 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 04 INVENTORY 24-25 A B C D Q4.pdf | 24 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAHABHAGI, BARDI _ Form 1 ARCHITECT'S CERTIFICATE - PHASE 1 _ WING - ABCD.pdf | 23 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1201 - RERA CERTIFICATE.pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: A B C D 1.pdf | 27 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 4 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ABCD FORM 2A.pdf | 4 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold flat in A B C D.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA FINAL.pdf | 4 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ABCD.pdf | 4 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 15 MAY 2023.pdf | 26 May 2023 |
| Details of encumbrances concerned to FinanceFile: WING ABCD ENCUMBRANCE LEGAL.pdf | 25 May 2023 |
| Details of encumbrances concerned to LegalFile: WING ABCD ENCUMBRANCE LEGAL.pdf | 25 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTERST IN OTHER PROJECT.pdf | 25 May 2023 |
| Proforma of Agreement for saleFile: ABCD Rera_Draft_SIPL AGG FOR SALEadv sanman.pdf | 25 May 2023 |
| Proforma of Allotment letterFile: draft allotment for abcd wing_compressed.pdf | 25 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS RIVA ABCD.pdf | 25 May 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT WING ABCD.pdf | 25 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: WING ABCD DEVIATION REPORT AGGREMENT.pdf | 25 May 2023 |
| Copy of the legal title reportFile: Legal Title Report-compressed.pdf | 13 Apr 2022 |
| Declaration in FORM BFile: FORM B LANDLOARD_compressed.pdf | 13 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 13 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RIVA RYTHM A,B,C,D.pdf | 13 Apr 2022 |
| Building plan approvalFile: NA ORDER.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf | 5 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf | 5 Apr 2022 |
| Declaration about Commencement CertificateFile: 17 NEW DECLRATION OF COOMM CERT.pdf | 5 Apr 2022 |
| CERSAI detailsFile: CERSAI.pdf | 5 Apr 2022 |
| Proforma of Allotment letterFile: 33 draft COPY OF SALE AGGREMENT A,B,C,D WING.pdf | 5 Apr 2022 |
| Layout approvalFile: 4 APPROVED PLAN.pdf | 4 Apr 2022 |
| PAN CardFile: 1 FIRM PAN.pdf | 4 Apr 2022 |
| Details of encumbrancesFile: non encumbrance certificate.pdf | 4 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: 4 APPROVED PLAN.pdf | 4 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RIVA RYTHM WING A, B, C, D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHIVPURI ROAD5,900+ in Raigarh
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: SAHABHAGI INFRA PVT LTD.
SAHABHAGI INFRA PVT LTD. has 2 registrations on MahaRERA, including RIVA RYTHM -I, J,K,L WING and RIVA RYTHM WING A, B, C, D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if RIVA RYTHM WING A, B, C, D is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RIVA RYTHM WING A, B, C, D?
The registered promoter entity is SAHABHAGI INFRA PVT LTD., a company as per the filing. Its GSTIN 27AARCS0268C1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RIVA RYTHM WING A, B, C, D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RIVA RYTHM WING A, B, C, D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RIVA RYTHM WING A, B, C, D?
The professionals named in the filing: Architect: DESTINATION ARCHITECURE DHARMESH BHALANI; Engineer: S V PATEL AND ASSOCIATES SURENDRA VELJI PROPRIETOR; Engineer: Nitesh Shamji Parasiya; Engineer: Ujas Mulchand Chheda; Chartered Accountant: L K DEDHIA LAXMICHAND KHERAJ DEDHIA; Chartered Accountant: Ravi Vitthaldas Thakkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIVA RYTHM WING A, B, C, D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback