Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Washim registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

RIDDHI SIDDHI is a Residential / Group Housing project by TECTON BUILDERS AND DEVELOPERS PVT LTD in Washim, Maharashtra, registered with MahaRERA as P50200002611 on 2 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date.

At a glance

Project

  • NameRIDDHI SIDDHI
  • TypeResidential / Group Housing
  • Location
    • Washim (M Cl)
    • Washim
    • 444505
  • Pincode444505
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50200002611
  • ReraGenie IDRG-MH-00279

Builder

  • NameTECTON BUILDERS AND DEVELOPERS PVT LTD
  • Entity typeCompany
  • Managing DirectorVivek Sukhanand Patni
  • DirectorsSuresh Pannalal Jain, Phoolchand Ratanchand Parekh
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredAug 2017PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RIDDHI SIDDHI A/B/CNA50000
RIDDHI SIDDHI D/E/FNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

RIDDHI SIDDHI A/B/C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RIDDHI SIDDHI D/E/F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Multipurpose HallYes100%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Open Space40
BuildingOpen SpaceTotal
RIDDHI SIDDHI A/B/C2020
RIDDHI SIDDHI D/E/F2020

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,738 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9345.0
Proposed, not sanctioned7,188 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWASHIM

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahaveer Associates
PartnerRole in project
TECTON BUILDERS AND DEVELOPERS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 May 2025

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: dddddddddddddew.pdf2 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for20 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: f 4 signed, certified anf declaration - Phse I.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: F 4_organized.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ilovepdf_merged (57).pdf31 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Riddhi Siddhi as on March 2018.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Riddhi Siddhi as on March 2019.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Riddhi Siddhi as on 16 May 2019.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Riddhi Siddhi as on 16 May 2019.pdf17 Feb 2023
Certificates of CA (Form 3)File: Form 3- Riddhi Siddhi as on March 2018.pdf17 Feb 2023
Certificates of CA (Form 3)File: Form 3- Riddhi Siddhi as on March 2019.pdf17 Feb 2023
Certificates of CA (Form 3)File: Form 3- Riddhi Siddhi as on 16 May 2019.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - Riddhi Siddhi - FY 2017-18.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Riddhi Siddhi - FY 2018-19.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Riddhi Siddhi - FY 2019-20.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Riddhi Siddhi - FY 2020-21.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Riddhi Siddhi - FY 2021-22.pdf14 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A NEW_compressed.pdf11 Jan 2023
Building plan approvalFile: Plans.pdf10 Jan 2023
Building Plan Approval (IOD)File: Plans.pdf10 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING CC.pdf10 Jan 2023
Declaration about Commencement CertificateFile: Riddhi Siddhi FORMAT D.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM 2A_compressed.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: C 29 _compressed.pdf10 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C ABC TECTON.pdf10 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C DEF PDF.pdf10 Jan 2023
OtherFile: O C DEF PDF.pdf9 Jun 2019
Building plan approvalFile: APPROVAL PLAN 1.pdf26 Jul 2017
Building plan approvalFile: APPROVAL PLAN 2.pdf26 Jul 2017
Layout approvalFile: LAYOUT PLAN.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf26 Jul 2017
Building Plan Approval (IOD)File: APPROVAL PLAN 1.pdf26 Jul 2017
Building Plan Approval (IOD)File: APPROVAL PLAN 2.pdf26 Jul 2017
Proforma of Allotment letterFile: SALE DEED RERA TECTON.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CER TECTON.pdf25 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA.pdf22 Jul 2017
Building plan approvalFile: Bul ( A, B, C ) Ground To 4th Floor Plan.pdf21 Jul 2017
Building plan approvalFile: Bul ( D, E, F ) Ground To 4th Floor Plan.pdf21 Jul 2017
PAN CardFile: PAN CARD TECTON.pdf21 Jul 2017
Copy of the legal title reportFile: TITLE TECTON.pdf21 Jul 2017
Details of encumbrancesFile: ENCRUMBANCE LETTER.pdf21 Jul 2017
Building Plan Approval (IOD)File: Bul ( A, B, C ) Ground To 4th Floor Plan.pdf21 Jul 2017
Building Plan Approval (IOD)File: Bul ( D, E, F ) Ground To 4th Floor Plan.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC TECTON 1.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC TECTON 2.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC TECTON.pdf21 Jul 2017
Declaration in FORM BFile: FORM B.pdf21 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE RIDDHI SIDDHI.pdf21 Jul 2017
Proforma of Allotment letterFile: PROPOSAL LETTER.pdf21 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf21 Jul 2017

How this compares with Washim

0%of Washim projects moved their completion datethis one has not
42%of Washim registrations have lapsed or been cancelledthis one is among them

Computed across the 28 Washim projects on ReraGenie, from their own filings.

Keep RIDDHI SIDDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Washim (M Cl)28 in Washim

2 kmRIDDHI SIDDHICompleted 4Lapsed / revoked 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: TECTON BUILDERS AND DEVELOPERS PVT LTD

TECTON BUILDERS AND DEVELOPERS PVT LTD has 3 registrations on MahaRERA, including RIDDHI SIDDHI and RIDDHI SIDDHI PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Washim district page.

Frequently asked questions

What does it mean that RIDDHI SIDDHI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RIDDHI SIDDHI is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RIDDHI SIDDHI?

The registered promoter entity is TECTON BUILDERS AND DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RIDDHI SIDDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RIDDHI SIDDHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RIDDHI SIDDHI?

The professionals named in the filing: Architect: Mahaveer Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIDDHI SIDDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIDDHI SIDDHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIDDHI SIDDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.