Home / Browse projects / Pune, Maharashtra / REAL DREAM HOMES WING A AND B

Completed No litigation declared Residential / Group Housing project

REAL DREAM HOMES WING A AND B

By REAL BUILDCON BUILDERS AND DEVELOPERS

RG-MH-13073 · RERA P52100021993 · Last updated on MahaRERA portal: 19 Dec 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

REAL DREAM HOMES WING A AND B is a Residential / Group Housing project by REAL BUILDCON BUILDERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100021993 on 25 Aug 2019. The registration is recorded completed; possession was promised by 29 Aug 2024.

At a glance

Project

  • NameREAL DREAM HOMES WING A AND B
  • TypeResidential / Group Housing
  • Location
    • TALEGAON - AMBI ROAD
    • GANESH NAGAR
    • Varale
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021993
  • ReraGenie IDRG-MH-13073

Builder

  • NameREAL BUILDCON BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersDEVJI MANSINGH NAIK, RAMESH MALLAIAH AKULA, DINESH RAMESH AKULA, NIVRUTTI NAMDEV PANMAND
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1

Key dates

this monthRegisteredAug 2019PromisedAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2019
  • Promised completion29 Aug 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA140000
B WINGNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.

A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 19 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes75%
Street LightingYes75%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24
BuildingClosed/CoveredTotal
A WING1212
B WING1212

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,248 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10920.64
Proposed, not sanctioned10,921 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch567/7, RIVER VIEW APARTMENT,CONGRESS BHAVAN, SHIVAJI NAGAR PUNE 411005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJIT THAKUR
EngineerYUVRAJ KHEDKAR
Chartered AccountantDEEPAK PARDESHI
PartnerRole in project
REAL BUILDCON BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jan 2023

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: FORM 3 SEPT 2023.pdf19 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2023.pdf19 Dec 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf19 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM - 1 DEC 2022.pdf21 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEPT 2022.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAR -2022.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 JUNE -2022.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 SEPT 22.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2022.pdf21 Feb 2023
Certificates of CA (Form 3)File: FORM 3 - MARCH - 2022.pdf21 Feb 2023
Certificates of CA (Form 3)File: FORM - 3 JUNE - 2022.pdf21 Feb 2023
Certificates of CA (Form 3)File: FORM - 3 SEPT - 2022.pdf21 Feb 2023
Certificates of CA (Form 3)File: FORM - 3 DEC - 2022.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE 2020.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE 2021.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE 2022.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2 ENGINEERS CERTIFICATE 2020.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 ENGINEERS CERTIFICATE 2021.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 ENGINEERS CERTIFICATE 2022.pdf6 Feb 2023
Certificates of CA (Form 3)File: FORM - 3 MARCH - 2022.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2020.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2022.pdf6 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf6 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE RERA-min.pdf8 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech.pdf18 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2021_compressed.pdf12 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA Certificate Form 5.pdf12 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecs Cer Sept -21 for RERA.pdf4 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate RERA_compressed 07082021.pdf7 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech May2021.pdf24 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate for RERA_compressed.pdf19 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate for RERA_compressed.pdf23 Sep 2020
Certificates of CA (Form 3)File: CA Letter 1_compressed.pdf23 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARCHITECH.pdf3 Feb 2020
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf25 Jan 2020
Details of encumbrancesFile: INDEX 2 MORTGAGE DEED.pdf25 Jan 2020
Declaration in FORM BFile: Co- Promotor dabhade.pdf13 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf13 Aug 2019
Declaration in FORM BFile: Form B Promotor.pdf9 Aug 2019
Declaration in FORM BFile: Form B Co-Promotor.pdf9 Aug 2019
Layout approvalFile: 1.pdf5 Aug 2019
Building plan approvalFile: 1.pdf5 Aug 2019
Building plan approvalFile: 2.pdf5 Aug 2019
Building plan approvalFile: 3.pdf5 Aug 2019
Building plan approvalFile: 4.pdf5 Aug 2019
Building plan approvalFile: 5.pdf5 Aug 2019
Building plan approvalFile: 6.pdf5 Aug 2019
Building plan approvalFile: 7.pdf5 Aug 2019
Building plan approvalFile: 8.pdf5 Aug 2019
Building plan approvalFile: 9.pdf5 Aug 2019
Building plan approvalFile: 10.pdf5 Aug 2019
Building plan approvalFile: 11.pdf5 Aug 2019
Building plan approvalFile: 12.pdf5 Aug 2019
PAN CardFile: Real Pan.pdf5 Aug 2019
Copy of the legal title reportFile: 3 Search Report.pdf5 Aug 2019
Details of encumbrancesFile: Non Encumbrance certificate.pdf5 Aug 2019
Copy of Layout Approval (in case of layout)File: 1.pdf5 Aug 2019
Building Plan Approval (IOD)File: 1.pdf5 Aug 2019
Building Plan Approval (IOD)File: 2.pdf5 Aug 2019
Building Plan Approval (IOD)File: 3.pdf5 Aug 2019
Building Plan Approval (IOD)File: 4.pdf5 Aug 2019
Building Plan Approval (IOD)File: 5.pdf5 Aug 2019
Building Plan Approval (IOD)File: 6.pdf5 Aug 2019
Building Plan Approval (IOD)File: 7.pdf5 Aug 2019
Building Plan Approval (IOD)File: 8.pdf5 Aug 2019
Building Plan Approval (IOD)File: 9.pdf5 Aug 2019
Building Plan Approval (IOD)File: 10.pdf5 Aug 2019
Building Plan Approval (IOD)File: 11.pdf5 Aug 2019
Building Plan Approval (IOD)File: 12.pdf5 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: PMRDA ORDER.pdf5 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf5 Aug 2019
Certificates of CA (Form 3)File: CA Certificate.pdf5 Aug 2019
Proforma of Allotment letterFile: Agreement_as_per_RERA_01_07_2019.pdf5 Aug 2019
Proforma of Allotment letterFile: Allotment Letter.pdf5 Aug 2019
OtherFile: E C PUNE001.pdf5 Aug 2019
OtherFile: E C Mumbai.pdf5 Aug 2019
OtherFile: FIRE NOC001.pdf5 Aug 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REAL DREAM HOMES WING A AND B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GANESH NAGAR13,700+ in Pune

2 kmREAL DREAM HOMES WING A Completed 30Lapsed / revoked 26Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: REAL BUILDCON BUILDERS AND DEVELOPERS

REAL BUILDCON BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including REAL DREAM HOMES WING A AND B and REAL DREAM HOMES WING C AND D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if REAL DREAM HOMES WING A AND B is delayed beyond 29 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REAL DREAM HOMES WING A AND B?

The registered promoter entity is REAL BUILDCON BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REAL DREAM HOMES WING A AND B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REAL DREAM HOMES WING A AND B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REAL DREAM HOMES WING A AND B?

The professionals named in the filing: Architect: AJIT THAKUR; Engineer: YUVRAJ KHEDKAR; Chartered Accountant: DEEPAK PARDESHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REAL DREAM HOMES WING A AND B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REAL DREAM HOMES WING A AND B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REAL DREAM HOMES WING A AND B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.