RAVIKIRAN ANNEXE PHASE II

By DREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED

RG-MH-05206 · RERA P52100055879 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2028Possession promisedno revision filed
13 of 33Construction stages doneacross 3 buildings; furthest along: Plinth, 98%
27 of 184Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

RAVIKIRAN ANNEXE PHASE II is a Others project by DREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100055879 on 29 Apr 2024. Possession is promised by 28 Feb 2028. 157 of the 184 units on this registration are recorded sold or booked, and 13 of 33 construction stages are filed complete.

At a glance

Project

  • NameRAVIKIRAN ANNEXE PHASE II
  • TypeOthers
  • Location
    • -
    • Wadmukhwadi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055879
  • ReraGenie IDRG-MH-05206

Builder

  • NameDREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorAmit Sunil Israni
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2024PromisedFeb 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion28 Feb 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed68 files

Current status

85%157 of 184 units booked
73.3%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
5ANA111187087
5BNA111187087
8NA1101010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 98%.

5A58%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth98%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
5B61%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth98%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.68%
882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes95%
Street LightingYes70%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes50%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60
BuildingClosed/CoveredTotal
5A3030
5B3030

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,807 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI13238.23
Proposed, not sanctioned13,238 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC Thermax Chowk Pune
Estimated costRs 31.86 cr
Cost incurredRs 23.34 cr
Work done73.27%
BuildingWingEstimatedIncurred
5ANARs 14.59 crRs 10.65 cr
5BNARs 14.59 crRs 10.65 cr
-NARs 2.12 crRs 1.49 cr
8NARs 55.65 lakhRs 55.65 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManik Buchade Kimaya Associates
ArchitectKimaya Associates
EngineerAlok Kulkarni Setu Engineering
Chartered AccountantSCT & COMPANY
Chartered AccountantMilani Gattani & Co
PartnerRole in project
DREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
1539/2017Honble Civil Judge Senior Division Pune Issue summons to the defendant

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2028

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE - RK PH II.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate - RK PH II.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf26 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf26 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf26 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 PH II.pdf26 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ravikiran annexe Phase II Architect.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ravikiran A Ph II_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ravikiran Annexe Phase II Engineer.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure_compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect RK Phase II.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RK PH II.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Engineer Certificate RK A Phase II.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure_compressed.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure_compressed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rk Annexe Phase II_compressed.pdf16 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Intrest.pdf16 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest ASI.pdf15 Apr 2024
Other - LegalFile: 00991-2011 Sale Deed_compressed.pdf15 Apr 2024
Other - LegalFile: 02820-2011 Sale Deed.pdf15 Apr 2024
Other - LegalFile: 4532-2011 POA.pdf15 Apr 2024
Other - LegalFile: 03151-2011 POA_compressed.pdf15 Apr 2024
Other - LegalFile: 3150-2011 Sale Deed_compressed.pdf15 Apr 2024
Other - LegalFile: 3152-2011_compressed.pdf15 Apr 2024
Other - LegalFile: 4531-2011 Sale Deed_compressed.pdf15 Apr 2024
Declaration about Commencement CertificateFile: Declaration ABout CC.pdf10 Apr 2024
Proforma of Agreement for saleFile: Agreement to Sale compressed.pdf5 Apr 2024
Proforma of Allotment letterFile: Allotment Letter compressed.pdf4 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf4 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation of Agreement To Sale compressed.pdf4 Apr 2024
Other - TechnicalFile: New Declaration Cum Undertaking.pdf4 Apr 2024
Building plan approvalFile: Bldg 5 Elevation NEW.PDF26 Mar 2024
Building plan approvalFile: Bldg 5 NEW.PDF26 Mar 2024
Building plan approvalFile: Bldg 7 and 8 Elevation and CLub House NEW.PDF26 Mar 2024
Building plan approvalFile: Bldg 5 Ground Floor New.PDF26 Mar 2024
Building plan approvalFile: Bldg 5 1 NEW.PDF26 Mar 2024
Layout approvalFile: Layout Plan NEW.PDF26 Mar 2024
Copy of the legal title reportFile: Legal Title Report 1 compressed.pdf26 Mar 2024
Copy of the legal title reportFile: Legal Title Report 2 compressed.pdf26 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf26 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Legal.pdf26 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Finance.pdf26 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Legal.pdf26 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout Plan NEW.PDF26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg 5 Elevation NEW.PDF26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg 5 NEW.PDF26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg 7 and 8 Elevation and CLub House NEW.PDF26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg 5 Ground Floor New.PDF26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg 5 1 NEW.PDF26 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate New compressed.pdf26 Mar 2024
Declaration in FORM BFile: Form B compressed.pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate compressed.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf26 Mar 2024
CERSAI detailsFile: Cersai Declaration.pdf26 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Details.pdf26 Mar 2024
PAN CardFile: Firm PAN Card.pdf22 Mar 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAVIKIRAN PHASE II154-2 Plot no 1 Part Wadhmukhwadi PCMC90CompletedDec 2021Mar 2018
RAVIKIRAN PHASE II154-2 Plot no 1 Part Wadhmukhwadi PCMC90CompletedDec 2021Mar 2018
RAVIKIRAN PHASE I154 2 Plot no 1 Part Wadhmukhwadi PCMC140CompletedNov 2018Mar 2018
THE ICONIC LIVINGSR NO 64 OPP BEVERLY HILLS SOC PANCARD CLUB ROAD BANER39CompletedDec 2014Apr 2014
DREAMVILLE35-4-2 BEHIND GLIDING CENTRE KALEPADAL HADAPSAR PUNE175CompletedNov 2013Apr 2013

How this compares with Pune

85%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAVIKIRAN ANNEXE PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadmukhwadi13,700+ in Pune

2 kmRAVIKIRAN ANNEXE PHASE ICompleted 33Lapsed / revoked 14Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: DREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED

DREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED has 4 registrations on MahaRERA, including RAVIKIRAN PHASE I and RAVIKIRAN PHASE II. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RAVIKIRAN ANNEXE PHASE II is delayed beyond 28 Feb 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAVIKIRAN ANNEXE PHASE II?

The registered promoter entity is DREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAVIKIRAN ANNEXE PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAVIKIRAN ANNEXE PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAVIKIRAN ANNEXE PHASE II?

The professionals named in the filing: Architect: Manik Buchade Kimaya Associates; Architect: Kimaya Associates; Engineer: Alok Kulkarni Setu Engineering; Chartered Accountant: SCT & COMPANY; Chartered Accountant: Milani Gattani & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAVIKIRAN ANNEXE PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAVIKIRAN ANNEXE PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAVIKIRAN ANNEXE PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.