ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / RAUNAK CENTRUM

Registered No litigation declared Residential / Group Housing project

RAUNAK CENTRUM

By Raunak Jigna Associates

RG-MH-47161 · RERA P51800006705 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Rs 192.00 crore secured on the land, in favour of KOTAK MAHINDRA BANK LIMITED

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 73%
5 of 213Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

RAUNAK CENTRUM is a Residential / Group Housing project by Raunak Jigna Associates in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006705 on 16 Aug 2017. Possession is promised by 31 Dec 2026. 208 of the 213 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRAUNAK CENTRUM
  • TypeResidential / Group Housing
  • Location
    • Eastern Express Highway
    • Rahul Nagar
    • Everard Nagar
    • Sion
    • Kurla
    • Mumbai Suburban
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006705
  • ReraGenie IDRG-MH-47161

Builder

  • NameRaunak Jigna Associates
  • Entity typeOthers
  • Named personsShree Viraj Enterprises, Jigna Builders
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2027Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2027)
  • Buildings3 building records
  • Documents filed84 files

Current status

98%208 of 213 units booked
92.2%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAUNAK CENTRUMNA34302094213
00NA00000
0NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 73%.

RAUNAK CENTRUM68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises2%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
0028%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks3%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
028%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks3%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,291 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofKOTAK MAHINDRA BANK LIMITED
Secured amountRs 192.00 crore
CERSAI search filedYes
Declared on31 Dec 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI15501.0
Proposed, not sanctioned10,501 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai - Nariman Point
Estimated costRs 129.44 cr
Cost incurredRs 119.27 cr
Work done92.15%
BuildingWingEstimatedIncurred
RAUNAK CENTRUMNARs 120.98 crRs 119.27 cr
-NARs 8.46 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectREZA KABUL ARCHITECTS PVT LTD
EngineerRAJAN TIPNIS
EngineerHARSHAL MANOHARRAO POTODE
Chartered AccountantANKIT GOYANKA
Chartered AccountantSANDEEP SHETH
PartnerRole in project
Raunak Jigna Associates-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000591274Raunak Jigna AssociatesShabnam Mohd. Rafiq Ansari22/07/2024
CC12500700Sudhir Sharad ButalaRaunak Jigna Associates28/02/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Raunak Centrum RJA.pdf11 Jun 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Centrum.pdf28 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form 2 Centrum B.pdf28 May 2026
Withdrawal Update Form 3File: CA Certificate Raunak Centrum 31032026.pdf28 May 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 Centrum.pdf26 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form 2 Centrum B.pdf26 May 2026
Withdrawal Update Form 3File: CA Certificate Raunak Centrum 31032026.pdf26 May 2026
Withdrawal Update Form 1File: Form 1 Raunak Centrum Dec25.pdf10 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 Centrum.pdf10 Feb 2026
Withdrawal Update Form 3File: CA Certificate Raunak Centrum 31122025.pdf10 Feb 2026
Form 1File: Form 1 300625.pdf26 Dec 2025
Form 2File: Form2 Raunak Centrum 300625.pdf26 Dec 2025
Form 3File: Signed CA Certificate Raunak Centrum 30062025.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Raunak Centrum B 300625.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Raunak Centrum B 300925.pdf26 Dec 2025
Form 2File: Form2 Raunak Centrum 300925.pdf26 Dec 2025
Form 1File: Form 1 300925 Raunak Centrum.pdf26 Dec 2025
Form 3File: Raunak Centrum 30092025.pdf26 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A Raunak Centrum.pdf26 Dec 2025
Form 3File: CA Certificate Raunak Centrum 31032025.pdf22 Dec 2025
Form 2File: Form 2 Engineers Certificate Centrum.pdf22 Dec 2025
Form 1File: Form 1Raunak Centrum 31032025.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: Raunak Centrum B.pdf22 Dec 2025
Form 5 (FY 2024-2025)File: Raunak Centrum.pdf22 Dec 2025
Details of encumbrancesFile: Encumbarance Details - Kotak.pdf3 Mar 2025
Details of encumbrancesFile: RJA - Encumbarance Kotak.pdf10 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Centrum 311224.pdf10 Feb 2025
Certificates of CA (Form 3)File: Signed CA Certificate Raunak Centrum 311224.pdf10 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Centrum.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Centrum 31122024.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Centrum.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 11_Form-2A-Raunak Centrum.pdf2 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_Centrum_22-23.pdf1 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Raunak Centrum Form 2A 2023.pdf4 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20.pdf25 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_Raunak Centrum.pdf7 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC_Raunak Centrum.pdf7 Feb 2023
Certificates of CA (Form 3)File: CA_Raunak Centrum.pdf7 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RJA_FORM5_RAUNAK CENTRUM_21-22.pdf22 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Raunak Centrum_22.pdf2 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Raunak Jigna Associates_Form 5.pdf20 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A)File: Raunak Centrum.pdf18 Oct 2021
Layout approvalFile: Layout Plan.pdf25 Jan 2021
Building plan approvalFile: Building Plan1.pdf25 Jan 2021
Building plan approvalFile: Building Plan2.pdf25 Jan 2021
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf25 Jan 2021
Building Plan Approval (IOD)File: Building Plan1.pdf25 Jan 2021
Building Plan Approval (IOD)File: Building Plan2.pdf25 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Jan 2021
Details of Restarting of Construction work post lockdownFile: RJA - R Centrum RERA Updation - Restarting Work.pdf26 Jun 2020
Layout approvalFile: 01-1-12 (1)-1.pdf1 Apr 2020
Building plan approvalFile: 02- D Wing 1-4_compressed (1).pdf1 Apr 2020
Copy of Layout Approval (in case of layout)File: 01-1-12 (1)-1.pdf1 Apr 2020
Building Plan Approval (IOD)File: 02- D Wing 1-4_compressed (1).pdf1 Apr 2020
Commencement Certificates / NA Order for plotted developmentFile: Raunak Centrum CC.pdf1 Apr 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Raunak Centrum.pdf3 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Raunak Centrum.pdf28 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Form - 2A Raunak Centrum.pdf7 Nov 2019
Building plan approvalFile: Building plan.pdf3 May 2019
Layout approvalFile: Layout.pdf3 May 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf3 May 2019
Building Plan Approval (IOD)File: Building plan.pdf3 May 2019
Commencement Certificates / NA Order for plotted developmentFile: CC 12-07-2018.pdf3 May 2019
Certificates of CA (Form 5)File: Raunak Jigna.pdf15 Oct 2018
Layout approvalFile: PLAN-12-07-2018-1-1 (1).pdf10 Oct 2018
Copy of Layout Approval (in case of layout)File: PLAN-12-07-2018-1-1 (1).pdf10 Oct 2018
Building plan approvalFile: CC N PLAN (1)_1.pdf31 Jul 2017
Layout approvalFile: CC N PLAN (1)_1.pdf31 Jul 2017
Building plan approvalFile: CC N PLAN (1)_2.pdf31 Jul 2017
Layout approvalFile: CC N PLAN (1)_2.pdf31 Jul 2017
PAN CardFile: PAN.pdf31 Jul 2017
Copy of the legal title reportFile: TITILE.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrances 2.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: CC N PLAN (1)_1.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: CC N PLAN (1)_2.pdf31 Jul 2017
Building Plan Approval (IOD)File: CC N PLAN (1)_1.pdf31 Jul 2017
Building Plan Approval (IOD)File: CC N PLAN (1)_2.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Jul 2017
Declaration in FORM BFile: Form B.pdf31 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
NANACompletedFeb 2022Feb 2022

How this compares with Mumbai Suburban

98%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAUNAK CENTRUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rahul Nagar, Everard Nagar, Sion6,700+ in Mumbai Suburban

Builder: Raunak Jigna Associates

Raunak Jigna Associates has 2 registrations on MahaRERA, including RAUNAK CENTRUM and RAUNAK CENTRUM - A. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RAUNAK CENTRUM is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAUNAK CENTRUM?

The registered promoter entity is Raunak Jigna Associates, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAUNAK CENTRUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAUNAK CENTRUM?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAUNAK CENTRUM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAUNAK CENTRUM?

The professionals named in the filing: Architect: REZA KABUL ARCHITECTS PVT LTD; Engineer: RAJAN TIPNIS; Engineer: HARSHAL MANOHARRAO POTODE; Chartered Accountant: ANKIT GOYANKA; Chartered Accountant: SANDEEP SHETH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAUNAK CENTRUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAUNAK CENTRUM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAUNAK CENTRUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.