RATNATRAY RESIDENCY

By VISION DEVELOPERS

RG-MH-91412 · RERA P53000034826 · Last updated on MahaRERA portal: 30 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 2.50 crore secured on the land, in favour of jankalyan nagari sahakari patsantha maryadit karad
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 50%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

RATNATRAY RESIDENCY is a Residential / Group Housing project by VISION DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000034826 on 28 Apr 2022. Possession was promised by 30 Sep 2025 and is now 13 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameRATNATRAY RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • LANE NO 2 JAYSINGPUR
    • LANE NO 2
    • Jaysingpur (M Cl)
    • Shirol
    • Kolhapur
    • 416101
  • Pincode416101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000034826
  • ReraGenie IDRG-MH-91412

Builder

  • NameVISION DEVELOPERS
  • Entity typePartnership
  • GSTIN27AASFV5479J1Z5
  • Partnerpranjal prakash khot
  • Other registrations12 more →
  • Completed5 of 13
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

13 months past promisethis monthRegisteredApr 2022First promiseSep 2024Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2022
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RATNATRAY RESIDENCYNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

RATNATRAY RESIDENCY: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered20
Open Space4

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area527 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofjankalyan nagari sahakari patsantha maryadit karad
Secured amountRs 2.50 crore
Declared on1 Oct 2024
LandownerVillageDistrict
SMT ARUNADEVI TATYASAHEB PATILJaysingpur (M Cl)Kolhapur
padmshree mahesh burseJaysingpur (M Cl)Kolhapur
padmakshi subhash patilSangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authorityJAYSINGPUR MUNICIPAL COUNCIL
Permissible FSI1937.3
Proposed, not sanctioned1,937 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 94/B OPP CHAMBER OF COMMERCE BUILDING VASANT MARKET YARD 416416

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITTHAL TODKAR AND ASSOCIATES
Engineermahavir patil
Chartered Accountantmegha mahesh jadhav
Chartered Accountantmoreshwar GOVIND DESHPANDE
PartnerRole in project
VISION DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53000025177Sep 2024 → Sep 2025

Reason as filed by the promoterThere is no proper response to the flat booking. And the site is getting late because the material rate is too high. So we need an extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: CPM REPORT.pdf30 Dec 2024
Declaration in FORM BFile: FORM B.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 12 2023.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 03 2024.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 6 24.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 9 24.pdf23 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 30-09-23.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31-12-23.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 31-3-24.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 30-6-24.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-09-24.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-09-2023.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - UPTO - 30-9-24.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - UPTO - 30-6-24.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - UPTO - 31-3-24.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 3 - UP TO - 31-12-23.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UPTO 30-09-2023.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UPTO - 1-10-23 TO 31-12-23.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UPTO - 1-1-2024 TO 31-3-24.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 1-4-24 TO 30-6-2024.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 1-7-24 TO 30-9-24.pdf22 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf22 Nov 2024
Details of encumbrancesFile: incumbrance certificate.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 15102022.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 15012023.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 15042023.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 15072023.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 10102022.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 10012023.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 10042023.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 10072023.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality assurance certificate.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE 30092022.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE 31122022.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE 31032023.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE 30092022.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate - 25092023.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: annual report statement of account - 1042022 to 31032023.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: annual report statement of account - 1042022 to 31032023.pdf30 Sep 2023
Layout approvalFile: nakasha.pdf22 Apr 2022
Building plan approvalFile: sanction plan.pdf22 Apr 2022
PAN CardFile: vision dev pan.pdf22 Apr 2022
Copy of the legal title reportFile: search report.pdf22 Apr 2022
Details of encumbrancesFile: encumbrance certificate.pdf22 Apr 2022
Copy of Layout Approval (in case of layout)File: nakasha.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: sanction plan.pdf22 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: building permission certificate.pdf22 Apr 2022
Declaration about Commencement CertificateFile: declation about commencement certificate.pdf22 Apr 2022
Declaration in FORM BFile: form b pranjal khot.pdf22 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf22 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200235637130_For_Asset_Based_Search_22_04_2022_14_06_20_281.pdf22 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf22 Apr 2022
Proforma of Allotment letterFile: agreement to sale.pdf22 Apr 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf22 Apr 2022

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one moved by 12 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is among them

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep RATNATRAY RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LANE NO 2880+ in Kolhapur

2 kmRATNATRAY RESIDENCYCompleted 7Lapsed / revoked 3Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: VISION DEVELOPERS

VISION DEVELOPERS has 13 registrations on MahaRERA, including Visions Indradhanu Phase 2 and VISION ETERNITY. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What does it mean that RATNATRAY RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RATNATRAY RESIDENCY is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RATNATRAY RESIDENCY?

The registered promoter entity is VISION DEVELOPERS, a partnership as per the filing. Its GSTIN 27AASFV5479J1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RATNATRAY RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RATNATRAY RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RATNATRAY RESIDENCY?

The professionals named in the filing: Architect: VITTHAL TODKAR AND ASSOCIATES; Engineer: mahavir patil; Chartered Accountant: megha mahesh jadhav; Chartered Accountant: moreshwar GOVIND DESHPANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RATNATRAY RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RATNATRAY RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RATNATRAY RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.