ReraGenieLog inGet a buyer report

Home / Browse projects / Mysore, Karnataka / Rathasapthami Heights

Registration approved No litigation declared Residential/Group Housing project

Rathasapthami Heights

By M-PRO BUILD GROUPS

RG-KA-91225 · RERA PRM/KA/RERA/1268/378/PR/280722/005111 · Last updated on RERA Karnataka portal: 26 Jul 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 116 documents Report an error

Rathasapthami Heights is a Residential/Group Housing project by M-PRO BUILD GROUPS in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/280722/005111 on 28 Jul 2022. Possession is promised by 1 Jun 2025.

At a glance

Project

  • NameRathasapthami Heights
  • TypeResidential/Group Housing
  • Location
    • MYSORE
    • 570026
  • Pincode570026
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/280722/005111
  • ReraGenie IDRG-KA-91225

Builder

  • NameM-PRO BUILD GROUPS
  • Entity typePartnership Firm
  • GSTIN29ABQFM5726N1ZC
  • Authorized SignatoryMR. SURESH. C.M.

Key dates

this monthRegisteredJul 2022PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Jul 2022
  • Promised completion1 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rathasapthami Heights---56056

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Other works-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 26 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,842 sq m
Named landowners1
LandownerVillageDistrict
I.N. CHIDAMBARA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 21.42 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 21.42 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMRS. IMPANA. T.K.
EngineerANOOP G G
Chartered AccountantSUBEK AGARWAL

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed116

As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/280722/005111 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer CertificateFile: Engineer Certificate 2.pdf26 Jul 2022
Firm registration certificateFile: FIRM REGST CERT COPY.pdf18 Jul 2022
Bank Acct Statement 1File: Bank StatementMPro.pdf18 Jul 2022
JDA between chidambara to promoterFile: JDA_Latest.pdf18 Jul 2022
OLD JDAFile: OLD JDA.pdf18 Jul 2022
EC Both Sy Nos 1993-2007File: EC Both Sy Nos 1993-2007.jpg18 Jul 2022
EC Both Sy Nos 2007-10 2File: EC Both Sy Nos 2007-10 2.jpg18 Jul 2022
EC Both Sy Nos 2007-10File: EC Both Sy Nos 2007-10.jpg18 Jul 2022
EC COPY 01-04-2010 TO 07-11-2021 2File: EC COPY 01-04-2010 TO 07-11-2021 2.pdf18 Jul 2022
EC COPY 01-04-2010 TO 07-11-2021File: EC COPY 01-04-2010 TO 07-11-2021.pdf18 Jul 2022
EC COPY 01-04-2021 TO 07-06-2022File: EC COPY 01-04-2021 TO 07-06-2022.pdf18 Jul 2022
EC Sy58 1984-2003File: EC Sy58 1984-2003.jpg18 Jul 2022
Partnership DeedFile: PARTNERSHIP DEED MPRO.pdf18 Jul 2022
Hissa Phody 1File: Hissa 1.pdf18 Jul 2022
Hissa Phody 2File: Hissa 2.pdf18 Jul 2022
Single Plot Layout PlanFile: MUDA SINGLE PLAN APPROVAL LETTER WITH PLAN COPY.pdf18 Jul 2022
Single Plot Layout OrderFile: MUDA SINGLE PLAN APPROVAL LETTER.pdf18 Jul 2022
Village MapFile: Bogadi VILLAGE MAP.pdf18 Jul 2022
Building LicenseFile: CommencementCertificateMpro.pdf18 Jul 2022
Engineer CertificateFile: Engineer Certificate (2).pdf18 Jul 2022
Fee paid Receipt for Water NOCFile: WATER SUPPLY BILL PAYMENT DD.jpeg18 Jul 2022
MPRO GSTFile: MPRO GST CERTIFICATE.pdf18 Jul 2022
ARCHITECT DETAILFile: ARCHITECT CERT GOVT.pdf18 Jul 2022
MUDA SINGLE KHATAFile: MUDA SINGLE KHATHA COPY.pdf18 Jul 2022
RTC, survey 35/2 and 58/3-
Mutation, survey 35/2 and 58/3-
Encumbrance Certificate, survey 35/2 and 58/3-
Conversion/Alienation Order, survey 35/2 and 58/3-
Sale/Title/Gift Deed, survey 35/2 and 58/3-
JDA, survey 35/2 and 58/3-
Khatha, survey 35/2 and 58/3-
Registration CertificateFile: RC_compressed.pdf-
Partnership DeedFile: RH Partnership deed and amendment_compressed.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CA CERTIFICATE_compressed.pdf-
Certificate issued by Architect Form 2File: ARCHITECT CERTIFICATE.pdf-
Certificate issued by Engineer Form 3File: ENGINEER CERTIFICATE.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NO LITIGATION.pdf-
Certificate from Chartered AccountFile: CA CERTIFICATE_compressed.pdf-
Balance Sheet 2020 - 2021File: P&L BAL 21-22.pdf-
Balance Sheet 2019 - 2020File: ITR declaration.pdf-
Balance Sheet 2018 - 2019File: ITR declaration.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L BAL 21-22.pdf-
Audited Profit and Loss Statement 2019 - 2020File: ITR declaration.pdf-
Audited Profit and Loss Statement 2018 - 2019File: ITR declaration.pdf-
Director's Report 2019 - 2020File: ITR declaration.pdf-
Director's Report 2018 - 2019File: ITR declaration.pdf-
Cash Flow Statement 2019 - 2020File: ITR declaration.pdf-
Auditor's Report 2019 - 2020File: ITR declaration.pdf-
Auditor's Report 2018 - 2019File: ITR declaration.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR declaration.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR declaration.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR declaration.pdf-
Commencement certificate_compressed-
ELECTRICITY NOC WITH FEES PAID_compressed-
RH water noc-
LAYOUT FINAL-
LAYOUT FINAL_compressed-
LAYOUT FINAL-
LAYOUT FINAL_compressed-
LAYOUT FINAL-
Project Specification (2)-converted-
LAYOUT FINAL_compressed-
Area Development final-
ADVOCATE SEARCH REPORT-
declaration final (2)-
JDA-
NA ORDER_compressed-
declaration final (2)-
NA ORDER_compressed-
declaration final (2)-
Agreement of Sale Proforma format-
Provisional Allotment Letter Format (1)-converted-
Brochure final -
FORM B_compressed-

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep Rathasapthami Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmRathasapthami HeightsOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: M-PRO BUILD GROUPS

M-PRO BUILD GROUPS has 1 registration on RERA Karnataka, including Rathasapthami Heights. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if Rathasapthami Heights is delayed beyond 1 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Rathasapthami Heights?

The registered promoter entity is M-PRO BUILD GROUPS, a partnership firm as per the filing. Its GSTIN 29ABQFM5726N1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Rathasapthami Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Rathasapthami Heights?

The professionals named in the filing: Architect: MRS. IMPANA. T.K.; Engineer: ANOOP G G; Chartered Accountant: SUBEK AGARWAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rathasapthami Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rathasapthami Heights. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rathasapthami Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.