Home / Browse projects / Mumbai Suburban, Maharashtra / RANG TARANG CO OP HSG SOCIETY LTD

Registered No litigation declared Residential / Group Housing project

RANG TARANG CO OP HSG SOCIETY LTD

By RANG TARANG CHS LTD

RG-MH-05346 · RERA P51800051613 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
71 of 122Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

RANG TARANG CO OP HSG SOCIETY LTD is a Residential / Group Housing project by RANG TARANG CHS LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051613 on 27 Jun 2023. Possession is promised by 31 Dec 2027. 51 of the 122 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameRANG TARANG CO OP HSG SOCIETY LTD
  • TypeResidential / Group Housing
  • Location
    • SHAILENDRA NAGAR S V ROAD
    • DAHISAR EAST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051613
  • ReraGenie IDRG-MH-05346

Builder

  • NameRANG TARANG CHS LTD
  • Entity typeSociety
  • SecretoryVAIBHAV SUDHKAR PHANASGAONKAR
  • ChairpersonHEMANT RAMCHANDRA RAUT

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

42%51 of 122 units booked
44.7%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RANG TARANG CO OP HSG SOCIETY LTD - A WINGNA191962062
RANG TARANG CO OP HSG SOCIETY LTD - B WINGNA191960060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

RANG TARANG CO OP HSG SOCIETY LTD - A WING47%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)70%
Plinth100%
Stilt Floor50%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RANG TARANG CO OP HSG SOCIETY LTD - B WING48%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)70%
Plinth100%
Stilt Floor50%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19
BuildingClosed/CoveredTotal
RANG TARANG CO OP HSG SOCIETY LTD - A WING1010
RANG TARANG CO OP HSG SOCIETY LTD - B WING99

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,600 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Mar 2026

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI8201.05
Proposed, not sanctioned1,756 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUMAN KUNJ MARATH COLONY DAHISAR EAST MUMBAI 400068
Estimated costRs 87.10 cr
Cost incurredRs 38.90 cr
Work done44.66%
BuildingWingEstimatedIncurred
RANG TARANG CO OP HSG SOCIETY LTD - A WINGNARs 41.83 crRs 19.06 cr
RANG TARANG CO OP HSG SOCIETY LTD - B WINGNARs 41.83 crRs 19.06 cr
-NARs 3.44 crRs 76.95 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHARSHAD MAANOHAAR MORE
EngineerHARSHAD MAANOHAAR MORE
Chartered AccountantA K O R D & CO Partner CA Dattatray Bhanage
Chartered AccountantRVB & ASSOCIATES PROPRIETOR CA RAHUL VISHNU BOMBALE
Chartered AccountantR V B & ASSOCIATES
PartnerRole in project
RANG TARANG CHS LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA FORM 1 - Q3 - SIGNED.pdf25 Jun 2026
Withdrawal Update Form 1File: FORM 1 Architechts certificate _Rang tarang -2026 Q1_1.pdf25 Jun 2026
Withdrawal Update Form 2File: RERA FORM 2 - SIGNED -Q3.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate_2026_Q1_A.pdf25 Jun 2026
Withdrawal Update Form 3File: RERA FORM_3_SIGNED_Q3-compressed 1.pdf25 Jun 2026
Withdrawal Update Form 3File: RANG TARANG FORM 3_SIGNED.pdf25 Jun 2026
Form 2A (FY 2025-2026)File: Rang Tarang_Form 2A RERA 2025-26 Sign.pdf23 Jun 2026
Withdrawal Update Form 1File: RERA FORM 1 - SIGNED.pdf23 Mar 2026
Withdrawal Update Form 1File: RERA FORM 1 - SIGNED.pdf23 Mar 2026
Withdrawal Update Form 1File: RERA FORM 1 - SIGNED - Q2.pdf23 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate_2025_Q1 - Signed.pdf23 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate_2025_Q1 - Signed.pdf23 Mar 2026
Withdrawal Update Form 2File: RERA FORM 2 - SIGNED - Q2.pdf23 Mar 2026
Withdrawal Update Form 3File: RERA FORM 3 - RANGTARANG CHSL Q1.pdf23 Mar 2026
Withdrawal Update Form 3File: RERA FORM 3 - RANGTARANG CHSL Q1.pdf23 Mar 2026
Withdrawal Update Form 3File: RERA FORM 3 - RANGTARANG CHSL Q2.pdf23 Mar 2026
Form 5 (FY 2024-2025)File: RERA FORM 05 FINAL_SIGNED.pdf15 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate _Rang tarang -2025 Q1.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate_2025_Q1.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RANGTARANG.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate _Rang tarang -2024 Q4.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 - RANG TARANG CHSL - SIGNED_compressed.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate_2024_Q4.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate _Rang tarang -2024 Q3.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate_2024_Q3.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RANG TRANG SIGNED FORM-3.pdf30 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RANG TARANG FORM 5 SIGNED FORM.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate _Rang tarang -2024 Q2.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate_2024_Q2.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - RERA FORM 3_RANG TARANG CHSL 300624.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Charkop Kshitij_FORM 2A 2024.pdf6 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RANG TARANG_FORM 2A 2024.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate _Rang tarang -2024 Q1.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Rang Tarang_Engineers certificate_2024_Q1.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - JFM - 15-Apr2024_11zon.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_Q4 2023.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Certificate_Q4_2023.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - Rang Tarang chsl - SINGED_11zon (2).pdf6 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 01 FOMAT - A - SEPRATE BANK AC.pdf26 Dec 2023
Other - TechnicalFile: DECLARATION_WRONG DOCS UPLOADED.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 FORM 1 Architechts certificate _Rang tarang -2023 Q1.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 FORM 1 Architechts certificate _Rang tarang -2023 Q2.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 2023-06-31_Form 2 Engineers certificate.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 2023-09-31_Form 2 Engineers certificate.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Singed.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - singed.pdf23 Nov 2023
Building plan approvalFile: Approved Plan 1_11zon.pdf13 Oct 2023
Building plan approvalFile: Approved Plan 2_11zon.pdf13 Oct 2023
Building plan approvalFile: Approved Plan 3_11zon.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan 1_11zon.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan 2_11zon.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan 3_11zon.pdf13 Oct 2023
Declaration about Commencement CertificateFile: 4 DECLARATION - CC - NEW FINAL .pdf19 Jun 2023
Details of encumbrances concerned to FinanceFile: 1 Declaration of Encumbrance.pdf9 Jun 2023
Details of encumbrances concerned to LegalFile: 1 Declaration of Encumbrance.pdf9 Jun 2023
CERSAI detailsFile: 2 Annexure G-Asset Based Declaration - Mergerd.pdf9 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 - RANG TARANG CHSL DT 09062023.pdf9 Jun 2023
Proforma of Agreement for saleFile: DRAFT AFS_RANG TARANG CHSL_FINAL 160523.pdf17 May 2023
Details of encumbrances concerned to FinanceFile: 3 Declaration of encumbrance.pdf15 May 2023
Details of encumbrances concerned to LegalFile: 3 Declaration of encumbrance.pdf15 May 2023
Deviation Report with respect to model copy of AgreementFile: 1 No Deviation Certificate.pdf15 May 2023
Building plan approvalFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - ORIGINAL-08.pdf6 May 2023
Building plan approvalFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - Pg no -09 -10.pdf6 May 2023
Building plan approvalFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - ORIGINAL-11.pdf6 May 2023
Building plan approvalFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - ORIGINAL-12.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - ORIGINAL-08.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - Pg no -09 -10.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - ORIGINAL-11.pdf6 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 04 APPROVED IOA PLAN - TIL 3RD FLOOR - ORIGINAL-12.pdf6 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of interest in other Real Estate Org - Copy.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf26 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 21 FORMAT - A SEPARATE BANK ACCOUNT - HMM.pdf26 Apr 2023
Copy of the legal title reportFile: 02 LEGAL TITLE REPORT_AS PER RERA FORMAT_compressed.pdf22 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate New Registration_Rang tarang (1).pdf21 Apr 2023
Proforma of Allotment letterFile: Model Form of Allotment Letter.pdf21 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 04 COMMENCEMENT CERTIFICATE_PLINTH.pdf18 Apr 2023
Deviation Report with respect to Allotment letterFile: No Deviation report_Allotment - HMM.pdf18 Apr 2023
Layout approvalFile: 10 APPROVED IOA PLAN - 1-7 .pdf1 Apr 2023
PAN CardFile: 2 PAN CARD - RANGTARANG CHS LTD.pdf1 Apr 2023
Copy of Layout Approval (in case of layout)File: 10 APPROVED IOA PLAN - 1-7 .pdf1 Apr 2023

How this compares with Mumbai Suburban

42%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RANG TARANG CO OP HSG SOCIETY LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR EAST6,700+ in Mumbai Suburban

2 kmRANG TARANG CO OP HSG SOCompleted 101Lapsed / revoked 62Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 314 registered projects within 2 km.

Builder: RANG TARANG CHS LTD

RANG TARANG CHS LTD has 1 registration on MahaRERA, including RANG TARANG CO OP HSG SOCIETY LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RANG TARANG CO OP HSG SOCIETY LTD is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RANG TARANG CO OP HSG SOCIETY LTD?

The registered promoter entity is RANG TARANG CHS LTD, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RANG TARANG CO OP HSG SOCIETY LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RANG TARANG CO OP HSG SOCIETY LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RANG TARANG CO OP HSG SOCIETY LTD?

The professionals named in the filing: Architect: HARSHAD MAANOHAAR MORE; Engineer: HARSHAD MAANOHAAR MORE; Chartered Accountant: A K O R D & CO Partner CA Dattatray Bhanage; Chartered Accountant: RVB & ASSOCIATES PROPRIETOR CA RAHUL VISHNU BOMBALE; Chartered Accountant: R V B & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RANG TARANG CO OP HSG SOCIETY LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RANG TARANG CO OP HSG SOCIETY LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RANG TARANG CO OP HSG SOCIETY LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.