Home / Browse projects / Yavatmal, Maharashtra / RAM SHEWALKAR PARISAR
RAM SHEWALKAR PARISAR
By SHEWALKAR DEVELOPERS LIMITED
RG-MH-00527 · RERA P51000009928 · Last updated on MahaRERA portal: 20 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Yavatmal registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAM SHEWALKAR PARISAR is a Others project by SHEWALKAR DEVELOPERS LIMITED in Yavatmal, Maharashtra, registered with MahaRERA as P51000009928 on 22 Aug 2017. Possession was promised by 15 Apr 2026 and is now 6 months past that date.
At a glance
Project
- NameRAM SHEWALKAR PARISAR
- TypeOthers
- Location
- Wani (M Cl)
- Wani
- Yavatmal
- 445304
- Pincode445304
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51000009928
- ReraGenie IDRG-MH-00527
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Aug 2017
- Promised completion15 Apr 2026
- Revised completionNone
- Buildings5 building records
- Documents filed138 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ASHOSHI CLUSTER COMMERCIAL | NA | 7 | 0 | 0 | 0 | 0 |
| REGHA CLUSTER COMMERCIAL | NA | 9 | 0 | 0 | 0 | 0 |
| AGNIMITRA CLUSTER COMMERCIAL | NA | 3 | 0 | 0 | 0 | 0 |
| AMRUTZARI CLUSTER COMMERCIAL | NA | 8 | 0 | 0 | 0 | 0 |
| SNEHAGOTRI CLUSTER COMMERCIAL | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 20 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 85%.
ASHOSHI CLUSTER COMMERCIAL82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
REGHA CLUSTER COMMERCIAL44%
| Activity | Progress |
|---|---|
| Excavation | 60% |
| Basement (if any) | 60% |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
AGNIMITRA CLUSTER COMMERCIAL49%
| Activity | Progress |
|---|---|
| Excavation | 60% |
| Basement (if any) | 60% |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
AMRUTZARI CLUSTER COMMERCIAL31%
| Activity | Progress |
|---|---|
| Excavation | 45% |
| Basement (if any) | 45% |
| Podiums (if any) | 0% |
| Plinth | 45% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 35% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 35% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 35% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
SNEHAGOTRI CLUSTER COMMERCIAL65%
| Activity | Progress |
|---|---|
| Excavation | 75% |
| Basement (if any) | 75% |
| Podiums (if any) | 0% |
| Plinth | 75% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 20 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 100% |
Parking filed112
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| ASHOSHI CLUSTER COMMERCIAL | 19 | 19 |
| REGHA CLUSTER COMMERCIAL | 18 | 18 |
| AGNIMITRA CLUSTER COMMERCIAL | 20 | 20 |
| AMRUTZARI CLUSTER COMMERCIAL | 32 | 32 |
| SNEHAGOTRI CLUSTER COMMERCIAL | 23 | 23 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ADsysarchitects |
| Engineer | P S PATANKAR & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHEWALKAR DEVELOPERS LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed138
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: FORM-3-R-PARISAR-1-4-24 TO 30-6-24_compressed.pdf | 20 Dec 2024 |
| Certificates of CA (Form 3)File: FORM - 3 - R - PARISAR- 1-7-24 TO 30-9-24_compressed.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold unsold inventory-R-Parisar_compressed.pdf | 20 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM - 5 R - PARISAR - 1-4-2023 TO 31-3-2024.pdf | 20 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-R-PARISAR-ARCHITECT CERTI APRILTO JUNE24_compressed.pdf | 16 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-R-PARISAR-ARCHITECTS CERTI-JULY TO SEP24_compressed.pdf | 16 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE-APRIL TO JUNE24.pdf | 16 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE-JULY TO SEP2024.pdf | 16 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2-A-QUALITY ASSURANCE CERTIFICATE-MARCH-24.pdf | 16 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - R-PARISAR-1-4-2023 TO 31-03-2024.pdf | 16 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Adobe Scan 02 Jun 2024_compressed.pdf | 2 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct dec17_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jan march18_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April june18_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July sep18_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct dec18_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jan march19_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April june19_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July sep19_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct dec19_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jan march20_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April June 20_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July sep20_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct dec20_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jan march21_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April june21_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July sep2021_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct dec21_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jan march22_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April June 22_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July sep22_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct dec22_compressed (2).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jan march23_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: April June 23_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July sep2023_compressed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Oct dec23_compressed (1).pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jan Mar 24_compressed.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2017.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1ST QUARTER 2018.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2ND QUARTER 2018.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3RD QUATER 2018.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2018.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1ST QUARTER 2019.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2ND QUARTER 2019.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3RD QUARTER 2019.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2019.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 ST QUARTER 2020.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2ND QUARTER 2020.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3RD QUARTER 2020.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2020.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1ST QUARTER 2021.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2ND QUARTER 2021.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3RD QUARTER 2021.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2021.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1ST QUARTER 2022.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2ND QUARTER 2022.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3RD QUARTER 2022.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2022.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2022.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1ST QAURTER 2023.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2ND QUARTER 2023.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3RD QUARTER 2023.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4TH QUARTER 2023.pdf | 1 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1ST QAURTER 2024.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: 4 QuarterOct-dec17_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: jan March 18_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: April June 18_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: July sep18_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Oct dec18_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: jan march19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: April June 19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: July sep19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Oct dec19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: jan march20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: april june20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: July sep20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Oct dec20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: jan march21_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: April June 21_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: July sep 21_compressed.pdf | 1 Jun 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHEWALKAR ARCADE | LAXMI BHAWAN SQUARE WHC ROAD DHARAMPETH NAGPUR | 160 | Completed | Oct 2015 | Late, Dec 2016 |
| SHEWALKAR ENCLAVE | RAJAPETH BUS-STATION RAJAPETH BADNERA ROAD AMRAVATI | 70 | Completed | Mar 2015 | Late, Oct 2015 |
| SHEWALKAR LAKE-VIEW | SUBHASH NAGAR T-POINT HINGNA ROAD NAGPUR | 18 | Completed | Dec 2014 | Late, Dec 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Yavatmal
Computed across the 67 Yavatmal projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 138 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep RAM SHEWALKAR PARISAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wani (M Cl)67 in Yavatmal
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
SMD TOWER
SMD INFRASTRUCTURE
GOPAL RESIDENCY
Kiran Gopalrao Dikundwar
AAMER TOWER II
JAMIR MAHABOOB KHAN
AAMER TOWNSHIP
ZAMEER KHAN MAHEBOOB KHAN KHAN
ANAND SAGAR RESIDENCY I
SUPRIYA NANDKUMAR DHUMNE
AYODHYA NAGARI
SHREE RAM BUILDERS & DEVELOPERS
See every Yavatmal project, with the district possession charts
Builder: SHEWALKAR DEVELOPERS LIMITED
SHEWALKAR DEVELOPERS LIMITED has 4 registrations on MahaRERA, including RAM SHEWALKAR PARISAR and MULTANI APARTMENT. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Yavatmal district page.
Frequently asked questions
What does it mean that RAM SHEWALKAR PARISAR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RAM SHEWALKAR PARISAR is delayed beyond 15 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAM SHEWALKAR PARISAR?
The registered promoter entity is SHEWALKAR DEVELOPERS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAM SHEWALKAR PARISAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAM SHEWALKAR PARISAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAM SHEWALKAR PARISAR?
The professionals named in the filing: Architect: ADsysarchitects; Engineer: P S PATANKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAM SHEWALKAR PARISAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback