AAMER TOWER II
RG-MH-01329 · RERA P51000015004 · Last updated on MahaRERA portal: 2 Apr 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 31 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Yavatmal registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AAMER TOWER II is a Others project by JAMIR MAHABOOB KHAN in Yavatmal, Maharashtra, registered with MahaRERA as P51000015004 on 22 Jan 2018. The registration is recorded completed; possession was promised by 24 Jul 2024. The completion date has moved by 31 months from the original filing.
At a glance
Project
- NameAAMER TOWER II
- TypeOthers
- Location
- WARORA ROAD
- COLLEGE ROAD
- Wani (M Cl)
- Wani
- Yavatmal
- 445304
- Pincode445304
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51000015004
- ReraGenie IDRG-MH-01329
Builder
- NameJAMIR MAHABOOB KHAN
- Entity typeIndividual
- GSTIN27ASOPK5978R1ZE
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Jan 2018
- Promised completion24 Jul 2024
- Revised completionRevised to 24 Jul 2024 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed103 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AAMER TOWER II | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
AAMER TOWER II: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YOGITA GUPTA |
| Chartered Accountant | Nilesh Katariya & Associates |
| Partner | Role in project |
|---|---|
| JAMIR MAHABOOB KHAN | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject was almost completed on 31.03.2019 but OC was issued on 24.07.2024 as some remaining work took time due to COVID 19. The Project is now complete and the Promoter is seeking post facto extension of project registration by 31 months from the date of expiry of the project i.e. 30.12.2021 till date of Full OC that is 24.07.2024.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jan 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jan 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jan 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Apr 2025
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for | 2 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Declaration for Cersai.pdf | 28 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2024 Apr-Jun.pdf | 28 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2024 July.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner 21-Feb-2025 11-52 am.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024 Jul.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2025 Feb.pdf | 28 Feb 2025 |
| CERSAI detailsFile: Declaration for Cersai.pdf | 28 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Declaration for Cersai.pdf | 28 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Declaration for Cersai.pdf | 28 Feb 2025 |
| Declaration in FORM BFile: 5 Form B extension.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2021 Oct-Dec.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2024 Jan-Mar.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2023 Oct-Dec.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2023 Jul-Sep.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2023 Apr-Jun.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2023 Jan-Mar.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2022 Jul-Sep.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2021 Apr-Jun.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2022 Jan-Mar.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2022 Oct-Dec.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2021 Jul-Sep.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2021 Apr-Jun.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2021 Jan-Mar.pdf | 16 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 2020 Jan-Mar.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2024 Mar.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2021 Sep.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2023 Sep.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2023 Jun.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2023 Mar.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2022 Dec.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2022 Sep.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2022 June.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2022 Mar.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2021 Dec.pdf | 16 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure 2021 June.pdf | 16 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 16 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar 2020.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024 Jun-Jul.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Apr-Jun 2024.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar 2024.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct-Dec 2023.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jul-Sep 2023.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Apr-Jun 2023.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct-Dec 2022.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jul-Sep 2022.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Apr-June 2022.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar 2022.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct-Dec 2021.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jul-Sep 2021.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Apr-Jun 21.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar 2021.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar 2023.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2022 Jul-Sep.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2022 Oct-Dec.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023 Jan-Mar.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023 Apr-Jun.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023 Jul-Sep.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023 Oct-Dec.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024 Jan-Mar.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024 Apr-Jul.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2021 Oct-Dec.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023 Jan-Mar.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2022 Oct-Dec.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2022 Jul-Sep.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2022 Apr-Jun.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2022 Jan-Mar.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2021 Jul-Sep.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2021 Apr-Jun.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2021 Jan-Mar.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2020 Jan-Mar.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023 Apr-Jun.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf | 15 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf | 12 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf | 12 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf | 12 Feb 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| AAMER TOWER 1 | SAI NAGARI WANI | 45 | Completed | Aug 2017 | Mar 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Yavatmal
Computed across the 67 Yavatmal projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
Keep AAMER TOWER II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near COLLEGE ROAD67 in Yavatmal
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
SMD TOWER
SMD INFRASTRUCTURE
GOPAL RESIDENCY
Kiran Gopalrao Dikundwar
AAMER TOWNSHIP
ZAMEER KHAN MAHEBOOB KHAN KHAN
ANAND SAGAR RESIDENCY I
SUPRIYA NANDKUMAR DHUMNE
AYODHYA NAGARI
SHREE RAM BUILDERS & DEVELOPERS
MAHALAXMI APPARTMENT
SHALIK MAHADEORAO URKUDE
See every Yavatmal project, with the district possession charts
Builder: JAMIR MAHABOOB KHAN
JAMIR MAHABOOB KHAN has 1 registration on MahaRERA, including AAMER TOWER II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Yavatmal district page.
Frequently asked questions
What are my rights if AAMER TOWER II is delayed beyond 24 Jul 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AAMER TOWER II?
The registered promoter entity is JAMIR MAHABOOB KHAN, an individual as per the filing. Its GSTIN 27ASOPK5978R1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AAMER TOWER II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AAMER TOWER II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AAMER TOWER II?
The professionals named in the filing: Architect: YOGITA GUPTA; Chartered Accountant: Nilesh Katariya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AAMER TOWER II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback