Registration lapsed No litigation declared Residential / Group Housing project

RAJVIKA SKIES

By RAJYOG ASSOCIATE

RG-MH-21521 · RERA P52100029672 · Last updated on MahaRERA portal: 30 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 17 months past the filed date
  • Completion date moved by 19 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

RAJVIKA SKIES is a Residential / Group Housing project by RAJYOG ASSOCIATE in Pune, Maharashtra, registered with MahaRERA as P52100029672 on 26 Jun 2021. Possession was promised by 10 May 2025 and is now 17 months past that date. The completion date has moved by 19 months from the original filing.

At a glance

Project

  • NameRAJVIKA SKIES
  • TypeResidential / Group Housing
  • Location
    • SHIVSHRUSTI ROAD
    • SHIVSHRUSTHI
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029672
  • ReraGenie IDRG-MH-21521

Builder

  • NameRAJYOG ASSOCIATE
  • Entity typePartnership
  • GSTIN27AAOFR7629G1ZO
  • PartnersCHETAN TANAJI MANGADE, VIKRAM KASHINATHRAO KHUTWAD
  • Declared earlier projects1 →

Key dates

17 months past promisethis monthRegisteredJun 2021First promiseOct 2023Revised toMay 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Jun 2021
  • Promised completion10 May 2025
  • Revised completionRevised to 10 May 2025 (originally 30 Oct 2023)
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJVIKA SKIESNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

RAJVIKA SKIES: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 30 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,269 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
RAJYOG ASSOCIATEAMBEGAON BkPune

Approvals and building plan

Permissible FSI2233.87
Proposed, not sanctioned1,396 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANKAWADI PUNE 411043

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWALHEKAR & ASSOCIATES
EngineerP M SHELKE & ASSOCIATES
EngineerShishir Dhwade
Chartered AccountantAJITSINGH K & ASSOCIATE
Chartered AccountantTanaji Chorghe
PartnerRole in project
RAJYOG ASSOCIATE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024700Oct 2023 → May 2025

Reason as filed by the promoterPlease refer uploaded declaration for elaborate reasons for our project delay.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Nov 2023

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: sanction plan Rajvika 9th floor Page 1.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: sanction plan Rajvika 9th floor Page 1.pdf30 Nov 2024
Declaration about Commencement CertificateFile: format D Declaration about CC rera.pdf30 Nov 2024
CERSAI detailsFile: CERSAI.pdf30 Nov 2024
Declaration in FORM BFile: Annexuere B Declaration .pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3_on Sep 24_compressed.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A Quality Certificate 2021-22.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A quality certificate 2022-23.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A quality certificate 23-24.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2024.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Architect Certificate June 24.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf6 Aug 2024
Building plan approvalFile: Revised plan1_compressed.pdf5 Aug 2024
Layout approvalFile: Revised Plan_02_compressed.pdf5 Aug 2024
Copy of Layout Approval (in case of layout)File: Revised Plan_02_compressed.pdf5 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised plan1_compressed.pdf5 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate_compressed.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Rajvika skies june 2024.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate nov- 2023.pdf28 Nov 2023
Layout approvalFile: sanction plan with podium slab.pdf6 Nov 2023
Copy of Layout Approval (in case of layout)File: sanction plan with podium slab.pdf6 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement 4 Rajvika garden.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 Oct 2023_compressed.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: estimate Engg certificate oct 2023.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: Rajvika inventory oct 2023.pdf6 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: part completion Rajvika skies.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 march 2023.pdf4 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 June 23.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate rera March 2023.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate rera- 30 June 2023.pdf4 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March-23.pdf4 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June-23.pdf4 Sep 2023
Details of encumbrances concerned to FinanceFile: LEGAl.pdf11 Feb 2023
Details of encumbrances concerned to LegalFile: LEGAl.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate rera update 3.pdf11 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_RAJYOG ASSOCIATES.pdf11 Feb 2023
Disclosure of sold/ booked inventoryFile: inventory.pdf11 Feb 2023
Proforma of Agreement for saleFile: Agreeent for sale.pdf11 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rajyog Form 3 (5).pdf10 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest.pdf10 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration seprate bank ac.pdf10 Feb 2023
Deviation Report with respect to Allotment letterFile: allotment letter.pdf10 Feb 2023
Deviation Report with respect to model copy of AgreementFile: deviation report - model form agreement.pdf10 Feb 2023
Other - LegalFile: encumbrance concern to legal.pdf10 Feb 2023
Other - FinanceFile: encumbrance concern to finance.pdf10 Feb 2023
Details of encumbrancesFile: encumbrance.pdf9 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 3.pdf9 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er 3.pdf9 Feb 2023
Layout approvalFile: scan1763-522.pdf16 Nov 2021
Copy of Layout Approval (in case of layout)File: scan1763-522.pdf16 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: scan1762-675.pdf16 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Estimate Er 2nd certificate Shelke-32.pdf16 Nov 2021
Proforma of Allotment letterFile: Draft- Booking Agreement - Rajvika Skies .pdf28 Aug 2021
Copy of the legal title reportFile: new search report rajvika-63.pdf22 Jun 2021
Declaration about Commencement CertificateFile: declaration commencement certificate.pdf21 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf18 Jun 2021
Layout approvalFile: Layout Plan.pdf17 Jun 2021
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf17 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC-1-552.pdf17 Jun 2021
Proforma of Allotment letterFile: Final -Rajyog Associates Balwant - Rera - Kararnama - Marathi.pdf17 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf16 Jun 2021
Details of encumbrancesFile: Encumbrances certificate.pdf12 Jun 2021
Declaration in FORM BFile: affidavit.pdf12 Jun 2021
Building plan approvalFile: Plan-5-860.pdf10 Jun 2021
PAN CardFile: PAN CARD.pdf10 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan-5-860.pdf10 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: estimate engineer certificate.pdf10 Jun 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BALWANT HEIGHTSSHOP NO 3 CHANDRANGAN PRESTIGE NEAR PRIDE SCHOOL AMBEGOAN BK PUNE 41104648CompletedJan 2021Jan 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 19 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJVIKA SKIES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVSHRUSTHI13,700+ in Pune

2 kmRAJVIKA SKIESCompleted 163Lapsed / revoked 118Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: RAJYOG ASSOCIATE

RAJYOG ASSOCIATE has 1 registration on MahaRERA, including RAJVIKA SKIES. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that RAJVIKA SKIES shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RAJVIKA SKIES is delayed beyond 10 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJVIKA SKIES?

The registered promoter entity is RAJYOG ASSOCIATE, a partnership as per the filing. Its GSTIN 27AAOFR7629G1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJVIKA SKIES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJVIKA SKIES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJVIKA SKIES?

The professionals named in the filing: Architect: WALHEKAR & ASSOCIATES; Engineer: P M SHELKE & ASSOCIATES; Engineer: Shishir Dhwade; Chartered Accountant: AJITSINGH K & ASSOCIATE; Chartered Accountant: Tanaji Chorghe. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJVIKA SKIES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJVIKA SKIES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJVIKA SKIES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.