Rajput Ekyum
RG-MH-05667 · RERA P52100056261 · Last updated on MahaRERA portal: 13 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Rajput Ekyum is a Others project by MAHALAXMI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100056261 on 22 May 2024. Possession is promised by 30 Aug 2028. The completion date has moved by 4 months from the original filing. 113 of the 124 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameRajput Ekyum
- TypeOthers
- Location
- BORHADEWADI
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100056261
- ReraGenie IDRG-MH-05667
Builder
- NameMAHALAXMI DEVELOPERS
- Entity typePartnership
- GSTIN27ABMFM7763M1ZD
- PartnersShri Ramesh Mohandas Rajput, Shri Choithram Mohandas Rajput, Shri Kanhaiya Mohandas Rajput, Shri Kishan Mohandas Rajput, Shri Dinesh Choithram Rajput
- Other registrations25 more →
- Completed7 of 26
- No longer live6 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 May 2024
- Promised completion30 Aug 2028
- Revised completionRevised to 30 Aug 2028 (originally 30 Apr 2028)
- Buildings1 building record
- Documents filed120 files
Current status
Figures as on 13 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rajput Ekyum | NA | 12 | 11 | 108 | 16 | 124 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 85%.
Rajput Ekyum: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 85% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed158
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Rajput Ekyum | NA | Rs 28.45 cr | Rs 26.37 cr |
| - | NA | Rs 4.21 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Spot Consultant |
| Engineer | Rohinee Engineers |
| Engineer | Vijay Laxman Kolekar |
| Chartered Accountant | CA Pravin Pise and Associates |
| Chartered Accountant | Pravin Pise |
| Partner | Role in project |
|---|---|
| MAHALAXMI DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Aug 2028
Documents filed120
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Q1.pdf | 13 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Q1.pdf | 13 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 (3).pdf | 13 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-2025 Rajput Ekyum.pdf | 23 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-2026 Rajput Ekyum.pdf | 23 Jun 2026 |
| Form 2A (FY 2026-2027)File: 2026-2027 Rajput Ekyum (1).pdf | 23 Jun 2026 |
| Form 1File: Architect Certificate Quarter-1 2026.pdf | 13 Apr 2026 |
| Form 2File: Form 2 Q4.pdf | 13 Apr 2026 |
| Form 3File: FORM 3 Q4 (1).pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4.pdf | 13 Apr 2026 |
| Form 1File: Architect Certificate Q3.pdf | 9 Jan 2026 |
| Form 2File: FORM 2 ( Quarter 3).pdf | 9 Jan 2026 |
| Form 3File: Form 3 (76).pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD -UNSOLD Q3.pdf | 9 Jan 2026 |
| Form 1File: Form 1 (62).pdf | 14 Oct 2025 |
| Form 2File: Form - 2.pdf | 14 Oct 2025 |
| Form 3File: Form 3 Rajput Ekyam.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD -UNSOLD.pdf | 14 Oct 2025 |
| Form 1File: f1 re.pdf | 14 Jul 2025 |
| Form 2File: Form 2 Q1 (1).pdf | 14 Jul 2025 |
| Form 3File: Form 3 Q1.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf | 14 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (2).pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1_11zon.pdf | 10 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rajput ekyum (2) (1).pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold (2).pdf | 10 Jul 2025 |
| Form 1File: Form 1.pdf | 29 Jun 2025 |
| Form 2File: Form 2.pdf | 29 Jun 2025 |
| Form 3File: Form 3.pdf | 29 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 29 Jun 2025 |
| Form 1File: Form 1.pdf | 29 Jun 2025 |
| Form 2File: Form 2.pdf | 29 Jun 2025 |
| Form 3File: Form 3.pdf | 29 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf | 29 Jun 2025 |
| Form 1File: FORM 1.pdf | 29 Jun 2025 |
| Form 2File: Form 2.pdf | 29 Jun 2025 |
| Form 3File: Form 3.pdf | 29 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD.pdf | 29 Jun 2025 |
| Form 1File: Form 1.pdf | 29 Jun 2025 |
| Form 2File: Form 2.pdf | 29 Jun 2025 |
| Form 3File: Form 3.pdf | 29 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 29 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 (1).pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 (5).pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Q4 (1).pdf | 11 Apr 2025 |
| Layout approvalFile: 1 Plan_organized_compressed-compressed (1).pdf | 23 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: 1 Plan_organized_compressed-compressed (1).pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_merged_organized.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 15 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Letter - for RERA.pdf | 15 Jan 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Rera DEsignation.pdf | 6 Jan 2025 |
| Layout approvalFile: Main Layout-compressed.pdf | 3 Jan 2025 |
| Building plan approvalFile: ground shop plus parking plan-compressed.pdf | 3 Jan 2025 |
| Building plan approvalFile: shopes plus offices first floor plan-compressed.pdf | 3 Jan 2025 |
| Building plan approvalFile: Basement parking plan-compressed.pdf | 3 Jan 2025 |
| Building plan approvalFile: 2nd floor plan-compressed.pdf | 3 Jan 2025 |
| Building plan approvalFile: 3 4 5 6 8 9 10 11 floor plan_11zon.pdf | 3 Jan 2025 |
| Building plan approvalFile: front elevation_11zon.pdf | 3 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Main Layout-compressed.pdf | 3 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: ground shop plus parking plan-compressed.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: front elevation_11zon.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 4 5 6 8 9 10 11 floor plan_11zon.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd floor plan-compressed.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Basement parking plan-compressed.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: shopes plus offices first floor plan-compressed.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3A (2Q).pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (2Q).pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 17 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed f1.pdf | 11 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed f2.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: signed SU.pdf | 11 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed f3.pdf | 11 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 25 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 120 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Rajput Ekyum on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORHADEWADI13,700+ in Pune
Filed coordinates, straight-line distance. 184 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: MAHALAXMI DEVELOPERS
MAHALAXMI DEVELOPERS has 26 registrations on MahaRERA, including Mahalaxmi Sankul and Silver Springs. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Rajput Ekyum is delayed beyond 30 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Rajput Ekyum?
The registered promoter entity is MAHALAXMI DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABMFM7763M1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Rajput Ekyum?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Rajput Ekyum?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Rajput Ekyum?
The professionals named in the filing: Architect: Spot Consultant; Engineer: Rohinee Engineers; Engineer: Vijay Laxman Kolekar; Chartered Accountant: CA Pravin Pise and Associates; Chartered Accountant: Pravin Pise. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Rajput Ekyum?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback