Home / Browse projects / Pune, Maharashtra / Rajput Ekyum

Registered No litigation declared Others project

Rajput Ekyum

By MAHALAXMI DEVELOPERS

RG-MH-05667 · RERA P52100056261 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedmoved 4 months from the original
6 of 11Construction stages donefurthest along: Basement (if any), 85%
11 of 124Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

Rajput Ekyum is a Others project by MAHALAXMI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100056261 on 22 May 2024. Possession is promised by 30 Aug 2028. The completion date has moved by 4 months from the original filing. 113 of the 124 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameRajput Ekyum
  • TypeOthers
  • Location
    • BORHADEWADI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056261
  • ReraGenie IDRG-MH-05667

Builder

  • NameMAHALAXMI DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABMFM7763M1ZD
  • PartnersShri Ramesh Mohandas Rajput, Shri Choithram Mohandas Rajput, Shri Kanhaiya Mohandas Rajput, Shri Kishan Mohandas Rajput, Shri Dinesh Choithram Rajput
  • Other registrations25 more →
  • Completed7 of 26
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2024First promiseApr 2028Revised toAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion30 Aug 2028
  • Revised completionRevised to 30 Aug 2028 (originally 30 Apr 2028)
  • Buildings1 building record
  • Documents filed120 files

Current status

91%113 of 124 units booked
80.7%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rajput EkyumNA121110816124

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 85%.

Rajput Ekyum: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed158

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots158
Closed/Covered40
Open Space118

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,170 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Aug 2026

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI15215.36
Proposed, not sanctioned11,942 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHALAXMI TOWERS, S NO 211 CTS NO 1041 TO 1060 PUNE NASIK ROAD, BHOSARI 411039
Estimated costRs 32.67 cr
Cost incurredRs 26.37 cr
Work done80.73%
BuildingWingEstimatedIncurred
Rajput EkyumNARs 28.45 crRs 26.37 cr
-NARs 4.21 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpot Consultant
EngineerRohinee Engineers
EngineerVijay Laxman Kolekar
Chartered AccountantCA Pravin Pise and Associates
Chartered AccountantPravin Pise
PartnerRole in project
MAHALAXMI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100056261/WarApr 2028 → Aug 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Aug 2028

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q1.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 (3).pdf13 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-2025 Rajput Ekyum.pdf23 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-2026 Rajput Ekyum.pdf23 Jun 2026
Form 2A (FY 2026-2027)File: 2026-2027 Rajput Ekyum (1).pdf23 Jun 2026
Form 1File: Architect Certificate Quarter-1 2026.pdf13 Apr 2026
Form 2File: Form 2 Q4.pdf13 Apr 2026
Form 3File: FORM 3 Q4 (1).pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4.pdf13 Apr 2026
Form 1File: Architect Certificate Q3.pdf9 Jan 2026
Form 2File: FORM 2 ( Quarter 3).pdf9 Jan 2026
Form 3File: Form 3 (76).pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD -UNSOLD Q3.pdf9 Jan 2026
Form 1File: Form 1 (62).pdf14 Oct 2025
Form 2File: Form - 2.pdf14 Oct 2025
Form 3File: Form 3 Rajput Ekyam.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD -UNSOLD.pdf14 Oct 2025
Form 1File: f1 re.pdf14 Jul 2025
Form 2File: Form 2 Q1 (1).pdf14 Jul 2025
Form 3File: Form 3 Q1.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf14 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (2).pdf10 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1_11zon.pdf10 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rajput ekyum (2) (1).pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold (2).pdf10 Jul 2025
Form 1File: Form 1.pdf29 Jun 2025
Form 2File: Form 2.pdf29 Jun 2025
Form 3File: Form 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf29 Jun 2025
Form 1File: Form 1.pdf29 Jun 2025
Form 2File: Form 2.pdf29 Jun 2025
Form 3File: Form 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf29 Jun 2025
Form 1File: FORM 1.pdf29 Jun 2025
Form 2File: Form 2.pdf29 Jun 2025
Form 3File: Form 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD.pdf29 Jun 2025
Form 1File: Form 1.pdf29 Jun 2025
Form 2File: Form 2.pdf29 Jun 2025
Form 3File: Form 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf29 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 (1).pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 (5).pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Q4 (1).pdf11 Apr 2025
Layout approvalFile: 1 Plan_organized_compressed-compressed (1).pdf23 Jan 2025
Copy of Layout Approval (in case of layout)File: 1 Plan_organized_compressed-compressed (1).pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_merged_organized.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Letter - for RERA.pdf15 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Rera DEsignation.pdf6 Jan 2025
Layout approvalFile: Main Layout-compressed.pdf3 Jan 2025
Building plan approvalFile: ground shop plus parking plan-compressed.pdf3 Jan 2025
Building plan approvalFile: shopes plus offices first floor plan-compressed.pdf3 Jan 2025
Building plan approvalFile: Basement parking plan-compressed.pdf3 Jan 2025
Building plan approvalFile: 2nd floor plan-compressed.pdf3 Jan 2025
Building plan approvalFile: 3 4 5 6 8 9 10 11 floor plan_11zon.pdf3 Jan 2025
Building plan approvalFile: front elevation_11zon.pdf3 Jan 2025
Copy of Layout Approval (in case of layout)File: Main Layout-compressed.pdf3 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ground shop plus parking plan-compressed.pdf3 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: front elevation_11zon.pdf3 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 4 5 6 8 9 10 11 floor plan_11zon.pdf3 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2nd floor plan-compressed.pdf3 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Basement parking plan-compressed.pdf3 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: shopes plus offices first floor plan-compressed.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3A (2Q).pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (2Q).pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed f1.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed f2.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: signed SU.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed f3.pdf11 Jul 2024

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rajput Ekyum on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORHADEWADI13,700+ in Pune

2 kmRajput EkyumCompleted 65Lapsed / revoked 37Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 184 registered projects within 2 km.

Builder: MAHALAXMI DEVELOPERS

MAHALAXMI DEVELOPERS has 26 registrations on MahaRERA, including Mahalaxmi Sankul and Silver Springs. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rajput Ekyum is delayed beyond 30 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rajput Ekyum?

The registered promoter entity is MAHALAXMI DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABMFM7763M1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rajput Ekyum?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rajput Ekyum?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rajput Ekyum?

The professionals named in the filing: Architect: Spot Consultant; Engineer: Rohinee Engineers; Engineer: Vijay Laxman Kolekar; Chartered Accountant: CA Pravin Pise and Associates; Chartered Accountant: Pravin Pise. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rajput Ekyum?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rajput Ekyum. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rajput Ekyum to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.