Home / Browse projects / Pune, Maharashtra / Rajdheera Business Square

Completed No litigation declared Commercial project

Rajdheera Business Square

By Rajdheera Properties

RG-MH-23044 · RERA P52100033395 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 75%
16 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Rajdheera Business Square is a Commercial project by Rajdheera Properties in Pune, Maharashtra, registered with MahaRERA as P52100033395 on 16 Feb 2022. The registration is recorded completed; possession was promised by 29 Mar 2024. The completion date has moved by 12 months from the original filing. 0 of the 16 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameRajdheera Business Square
  • TypeCommercial
  • Location
    • Talegaon Chakan Road
    • Talegaon Station
    • Talegaon Dabhade (R)
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033395
  • ReraGenie IDRG-MH-23044

Builder

  • NameRajdheera Properties
  • Entity typePartnership
  • PartnersYuvraj Balasaheb Kakade, Ganpat Babulal Sharma
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2022First promiseMar 2023Revised toMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Feb 2022
  • Promised completion29 Mar 2024
  • Revised completionRevised to 29 Mar 2024 (originally 30 Mar 2023)
  • Buildings1 building record
  • Documents filed89 files

Current status

0%0 of 16 units booked

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rajdheera Business SquareNA6601616

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.

Rajdheera Business Square: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Open Space5

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area459 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 May 2026
LandownerVillageDistrict
Priyanshu Rashes ThakkarGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityTalegaon Dabhade Nagar Parishad
Permissible FSI504.79
Proposed, not sanctioned505 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShrinathji Building, Chakan Road, Talegaon Dabhade St

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAajjay Baawale
EngineerAkshay Koditkar
Chartered AccountantAmol Jagtap
Chartered Accountantpriyesh jain
Chartered Accountantnilesh raut
PartnerRole in project
Rajdheera Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016938Mar 2023 → Mar 2024

Reason as filed by the promoterDue to after effect of COVID pandemic, labor force, necessary for carrying out construction activity, still havent returned back to active duty from their native places. With the current slow restarting of economy developer is confident to complete remaining work within next One year. After communicating the same to stake holders even they are of the opinion that an extension of One year would be in interest of all parties involved.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Jul 2024

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Architect Certificate 31032022.pdf8 May 2026
Form 2File: Form-2 Engineer Certificate 31032022.pdf8 May 2026
Form 3File: Form-3 CA Certificate 31032022.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31032022.pdf8 May 2026
Form 1File: Form-1 Architect Certificate 30062022.pdf8 May 2026
Form 2File: Form-2 Engineer Certificate 30062022.pdf8 May 2026
Form 3File: Form-3 CA Certificate 30062022.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30062022.pdf8 May 2026
Form 1File: Form-1 Architect Certificate 30092022.pdf8 May 2026
Form 2File: Form-2 Engineer Certificate 30092022.pdf8 May 2026
Form 3File: Form-3 CA Certificate 30092022.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30092022.pdf8 May 2026
Form 1File: Form-1 Architect Certificate 31122022.pdf8 May 2026
Form 2File: Form-2 Engineer Certificate 31122022.pdf8 May 2026
Form 3File: Form-3 CA Certificate 31122022.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31122022.pdf8 May 2026
Form 1File: Form-1 Architect Certificate 31032023.pdf8 May 2026
Form 2File: Form-2 Engineer Certificate 31032023.pdf8 May 2026
Form 3File: Form-3 CA Certificate 31032023.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31032023.pdf8 May 2026
Form 1File: Form-1 Architect Certificate 30062023.pdf8 May 2026
Form 2File: Form-2 Engineer Certificate 31032023.pdf8 May 2026
Form 3File: Form-3 CA Certificate 31032023.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30062023.pdf8 May 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A Quality Assurance Certificate FY 2023-24 28022024.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31122023.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 28022024.pdf18 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certificate 26042023.pdf17 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion Certificate 28022024.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092023.pdf11 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Book Inventory 30092023.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31032023.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062023.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31032022.pdf5 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062022.pdf5 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092022.pdf5 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122022.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31032022.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30062022.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092022.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31122022.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31032023.pdf5 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A Quality Assurance FY 2021-22.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032022.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30062022.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092022.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31122022.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032023.pdf5 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest Sharma 28072023.pdf5 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 RERA Audit FY 2021-22.pdf5 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 RERA Audit FY 2022-23.pdf5 Aug 2023
Declaration in FORM BFile: Form-B Affidavit 06072023.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A Quality Assurance FY 2022-23.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 31032023.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 30062023.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: No Emburance-Legel 08042023.pdf26 Apr 2023
Details of encumbrances concerned to FinanceFile: No Emburance-Finance 08042023.pdf26 Apr 2023
Details of encumbrances concerned to LegalFile: No Emburance-Legel 08042023.pdf26 Apr 2023
Details of encumbrances concerned to LegalFile: No Emburance-Finance 08042023.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory 31032022.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory 30062022.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory 30092022.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory 31122022.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Intrest Yuvraj Kakade 08042023.pdf26 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abt Seperate Bank AC 08042023.pdf26 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter 08042023.pdf26 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreemnt For Sale 08042023.pdf26 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31032022.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30062022.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092022.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31122022.pdf20 Apr 2023
Copy of the legal title reportFile: Format A 1.pdf27 Jan 2022
Copy of the legal title reportFile: Format A 2.pdf27 Jan 2022
Declaration about Commencement CertificateFile: Commencement Format D.pdf27 Jan 2022
Declaration about Commencement CertificateFile: Commencement Format D.pdf27 Jan 2022
Declaration in FORM BFile: Rajdheera Format B New.pdf27 Jan 2022
CERSAI detailsFile: CERSAI Details.pdf3 Jan 2022
Layout approvalFile: Sanction Plan Rajdheera 1.pdf30 Dec 2021
Building plan approvalFile: Sanction Plan Rajdheera 1.pdf30 Dec 2021
Copy of the legal title reportFile: Title Search Rajdheera (1).pdf30 Dec 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
KAKADE- SANJEEVANIP52100028898NEAR BALADOR, PuneApr 2021Certificate SignedJun 2023Late, Jun 2024
KAKADE RESIDENCYP52100004336Talegaon Dabhade (M Cl), PuneAug 2017Certificate SignedDec 2017Dec 2017

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rajdheera Business Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Talegaon Station13,700+ in Pune

2 kmRajdheera Business SquarCompleted 35Lapsed / revoked 22Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 80 registered projects within 2 km.

Builder: Rajdheera Properties

Rajdheera Properties has 1 registration on MahaRERA, including Rajdheera Business Square. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rajdheera Business Square is delayed beyond 29 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rajdheera Business Square?

The registered promoter entity is Rajdheera Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rajdheera Business Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rajdheera Business Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rajdheera Business Square?

The professionals named in the filing: Architect: Aajjay Baawale; Engineer: Akshay Koditkar; Chartered Accountant: Amol Jagtap; Chartered Accountant: priyesh jain; Chartered Accountant: nilesh raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rajdheera Business Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rajdheera Business Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rajdheera Business Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.