Home / Browse projects / Satara, Maharashtra / RAJASI ROW VILLAS

Registered No litigation declared Residential / Group Housing project

RAJASI ROW VILLAS

By Arjun Developers

RG-MH-93704 · RERA P52700055216 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jan 2029Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 96%
7 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

RAJASI ROW VILLAS is a Residential / Group Housing project by Arjun Developers in Satara, Maharashtra, registered with MahaRERA as P52700055216 on 11 Mar 2024. Possession is promised by 17 Jan 2029. 10 of the 17 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameRAJASI ROW VILLAS
  • TypeResidential / Group Housing
  • Location
    • Dhanagarwadi
    • Satara
    • Dhangarwadi (563797)
    • 415004
  • Pincode415004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700055216
  • ReraGenie IDRG-MH-93704

Builder

  • NameArjun Developers
  • Entity typePartnership
  • PartnersASHISH ANANTRAO HALGEKAR, ANANTRAO GURUANNA HALGEKAR, RAJASI ASHISH HALGEKAR
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2024PromisedJan 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Mar 2024
  • Promised completion17 Jan 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed67 files

Current status

59%10 of 17 units booked
51.2%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rajasi Row Villas Wing ANA2210010
Rajasi Row Villas Wing BNA22707

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 96%.

Rajasi Row Villas Wing A80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Rajasi Row Villas Wing B68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Open Space69
BuildingOpen SpaceTotal
Rajasi Row Villas Wing A4040
Rajasi Row Villas Wing B2929

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,853 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jan 2026
LandownerVillageDistrict
Anantrao Guruanna HalgekarKodoli (CT)Satara

Approvals and building plan

Sanctioning authorityDistrict Collector Satara
Permissible FSI1981.36
Proposed, not sanctioned1,981 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS No 495 Plot No 37 to 41, Mutha Colony Sadar Bazar, Satara, 415001
Estimated costRs 4.80 cr
Cost incurredRs 2.46 cr
Work done51.18%
BuildingWingEstimatedIncurred
Rajasi Row Villas Wing ANARs 2.80 crRs 1.42 cr
Rajasi Row Villas Wing BNARs 1.95 crRs 98.88 lakh
-NARs 5.00 lakhRs 4.83 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit Bagade
EngineerMr Swapnil Pawar
Chartered AccountantCA Abhijit Arvind Divekar
Chartered AccountantCA Rupali Vishwas Kawar
PartnerRole in project
Arjun Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 17 Jan 2029

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf16 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1-Signed.pdf20 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2-Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3 -Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1-signed.pdf19 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 -Signed.pdf19 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 -Signed.pdf19 Jan 2026
Form 1File: Form_1__Architecture_Certificate 25-26 Q2.pdf20 Oct 2025
Form 2File: Form_2__Engineers_Certificate 25-26 Q2.pdf20 Oct 2025
Form 3File: FORM NO 3_FY25-26_Q2-merged.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory Q2.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25 Sign.pdf30 Sep 2025
Form 1File: Form_1__Architecture_Certificate 25-26 Q1.pdf19 Jul 2025
Form 2File: Form_2__Engineers_Certificate 25-26 Q1.pdf19 Jul 2025
Form 3File: FORM NO 3_FY25-26_Q1.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory_Jun25.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1__Architecture_Certificate 24-25 Q4.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3_FY24-25_Q4.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2__Engineers_Certificate 24-25 Q4.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1__Architecture_Certificate 24-25 Q3.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3_FY24-25_Q3.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2__Engineers_Certificate 24-25 Q3.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q1 2425_compressed.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1 2425 Q1.pdf8 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2425 Q2.pdf8 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2425 Q2.pdf8 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3_FY24-25_Q2.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3_FY23-24_Q4.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3_FY24-25_Q1.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5_New_23-24.pdf27 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: genuineness of CCOC.PDF27 Feb 2024
Other - TechnicalFile: Annexure A-1.pdf27 Feb 2024
Other - TechnicalFile: Annexure a-2.pdf27 Feb 2024
Other - TechnicalFile: Annexure A-3.pdf27 Feb 2024
Copy of the legal title reportFile: Title Report.pdf20 Feb 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf20 Feb 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf20 Feb 2024
Proforma of Allotment letterFile: Arjun Developers Aiiotment letter proforma pdf.pdf20 Feb 2024
Other - LegalFile: Annexure A-1.pdf20 Feb 2024
Other - LegalFile: Annexure a-2.pdf20 Feb 2024
Other - LegalFile: Annexure A-3.pdf20 Feb 2024
Layout approvalFile: Sanction Plan 1.pdf31 Jan 2024
Layout approvalFile: Sanction Plan 2.pdf31 Jan 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf31 Jan 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan 2.pdf31 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3.pdf23 Jan 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf20 Jan 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf20 Jan 2024
Declaration about Commencement CertificateFile: Declareation of Commencement.pdf20 Jan 2024
Declaration in FORM BFile: Form B Developers.pdf20 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200294131980_For_Asset_Based_Search_20_01_2024_12_47_09_661.pdf20 Jan 2024
CERSAI detailsFile: CERSAI Declaration.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Anantrao Halgekar.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Ashish Halgekar.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Rajasi Halgekar.pdf20 Jan 2024
Deviation Report with respect to Allotment letterFile: Declaration Deviation in ATS And AL.pdf20 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Declaration Deviation in ATS And AL.pdf20 Jan 2024
Building plan approvalFile: Sanction Plan 1.pdf18 Jan 2024
Building plan approvalFile: Sanction Plan 2.pdf18 Jan 2024
PAN CardFile: PAN Card.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf18 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf18 Jan 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf18 Jan 2024

How this compares with Satara

59%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep RAJASI ROW VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satara1,100+ in Satara

2 kmRAJASI ROW VILLASCompleted 13Lapsed / revoked 11Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: Arjun Developers

Arjun Developers has 3 registrations on MahaRERA, including YASHRAJ and LAXMI NARAYAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if RAJASI ROW VILLAS is delayed beyond 17 Jan 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJASI ROW VILLAS?

The registered promoter entity is Arjun Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJASI ROW VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJASI ROW VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJASI ROW VILLAS?

The professionals named in the filing: Architect: Sumit Bagade; Engineer: Mr Swapnil Pawar; Chartered Accountant: CA Abhijit Arvind Divekar; Chartered Accountant: CA Rupali Vishwas Kawar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJASI ROW VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJASI ROW VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJASI ROW VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.