Home / Browse projects / Bengaluru Urban, Karnataka / RAJ ETTERNIA E BLOCK (BUILDING 4)
RAJ ETTERNIA E BLOCK (BUILDING 4)
RG-KA-21549 · RERA PRM/KA/RERA/1251/308/PR/290422/004855 · Last updated on RERA Karnataka portal: 15 Apr 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
RAJ ETTERNIA E BLOCK (BUILDING 4) is a Residential/Group Housing project by SNN Properties LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/290422/004855 on 29 Apr 2022. Possession is promised by 30 Apr 2026. 144 of the 150 units on this registration are recorded sold or booked, and 15 of 18 construction stages are filed complete.
At a glance
Project
- NameRAJ ETTERNIA E BLOCK (BUILDING 4)
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560068
- Pincode560068
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/290422/004855
- ReraGenie IDRG-KA-21549
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on29 Apr 2022
- Promised completion30 Apr 2026
- Revised completionNone
- Buildings1 building record
- Documents filed226 files
Current status
Figures as on 15 Apr 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 4 | - | - | - | 145 | 0 | 145 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 18 construction stages are filed complete. The stage furthest along is Joinery: Doors, at 95%.
Building: 97% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 95% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Painting | 95% |
| Elevation work | 100% |
| Internal and External work including landscapes as per santioned drawings | 60% |
Progress on shared amenities41
As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 85% |
| Internal Roads & Footpaths | Yes | 90% |
| Sewage and Drainage System | Yes | 100% |
| Parks & Tree planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Water conservation | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Education/Health/Other public amenities | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Electricity | Yes | 80% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 90% |
| Club House | Yes | 100% |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | Yes | 50% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Gas | Yes | 10% |
| Water and Sanitation | Yes | 100% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 95% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 95% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 90% |
| Terrace | Yes | 90% |
| Outer Wall | Yes | 90% |
| Open parking areas and common storage spaces | Yes | 90% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership12
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
| SNN PROPERTIES LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 84.63 cr | Rs 67.08 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 8.30 cr | Rs 1.18 cr |
| On-site expenditure-Salaries of workers | Rs 1.70 cr | Rs 7.05 cr |
| On-site expenditure-Site Overhead | Rs 85.00 lakh | Rs 6.30 cr |
| Payment of cess | Rs 84.63 lakh | - |
| On-site expenditure-Consultants Fees | Rs 75.00 lakh | Rs 71.93 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 42.50 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rana Ram |
| Engineer | K.L SRINIVAS |
| Chartered Accountant | Ramakrishna Kamat |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed226
As listed on the registration, under the names the promoter filed them with; the newest 80 of 226 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/290422/004855 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4-Raj Etternia(E Block).pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: ARCHITECT CERTIFICATE (RAJ ETTERNIA) MARCH 2026.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: ENGINEER CERTIFICATE (RAJ ETTERNIA) MARCH 2026.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 E Block CA Certificate-compressed.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certificate Raj Etternia E Block.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: ENGINEER CERTIFICATE RAJ ETTERNIA FOR December.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Non Litigation AffidavitFile: NON LITIGATION SNN PROPERTIES LLP - AFFIDAVIT.PDF | 21 Apr 2022 |
| Form B AffidavitFile: Form B Affidavit -SNNP LLP.pdf | 21 Apr 2022 |
| MR Sy No 144File: MR Sy 144.pdf | 21 Apr 2022 |
| MR Sy No 145/1File: MR Sy 145.pdf | 21 Apr 2022 |
| MR Sy No 147/1File: MR-147-1- 2 ACRE 9 GUNTAS.PDF | 21 Apr 2022 |
| Conversion Order Sy No 144 6 GuntasFile: CONVERSION ORDER 144 6G.pdf | 21 Apr 2022 |
| Gift Deed for Sy No 145/1 in the name of Priya KrishnaFile: GIFT DEED Sy 145 1.PDF | 21 Apr 2022 |
| Gift Deed for Sy No 147/1 in the name of Priya KrishnaFile: GIFT DEED Sy 147 1.pdf | 21 Apr 2022 |
| Gift Deed for Sy No 147/2 in the name of Pradeep KrishnaFile: GIFT DEED Sy 147 2.pdf | 21 Apr 2022 |
| BESCOM NOC with renewal clarificationFile: BESCOM NOC with renewal clarification.pdf | 21 Apr 2022 |
| BWSSB with NOC ClarificationFile: BWSSB with NOC Clarification.pdf | 21 Apr 2022 |
| HAL NOC with renewal clarificationFile: HAL NOC with renewal clarification.pdf | 21 Apr 2022 |
| Project SpecificationFile: RAJ ETTERNIA - E BLOCK - SPECIFICATIONS.pdf | 21 Apr 2022 |
| RTC, survey 144 | - |
| Mutation, survey 144 | - |
| Encumbrance Certificate, survey 144 | - |
| Conversion/Alienation Order, survey 144 | - |
| Sale/Title/Gift Deed, survey 144 | - |
| Khatha, survey 144 | - |
| RTC, survey 144 | - |
| Mutation, survey 144 | - |
| Encumbrance Certificate, survey 144 | - |
| Conversion/Alienation Order, survey 144 | - |
| Sale/Title/Gift Deed, survey 144 | - |
| Khatha, survey 144 | - |
| RTC, survey 144 | - |
| Mutation, survey 144 | - |
| Encumbrance Certificate, survey 144 | - |
| Conversion/Alienation Order, survey 144 | - |
| Sale/Title/Gift Deed, survey 144 | - |
| Khatha, survey 144 | - |
| RTC, survey 144 | - |
| Mutation, survey 144 | - |
| Encumbrance Certificate, survey 144 | - |
| Conversion/Alienation Order, survey 144 | - |
| Sale/Title/Gift Deed, survey 144 | - |
| Khatha, survey 144 | - |
| RTC, survey 145/1 | - |
| Mutation, survey 145/1 | - |
| Encumbrance Certificate, survey 145/1 | - |
| Conversion/Alienation Order, survey 145/1 | - |
| Sale/Title/Gift Deed, survey 145/1 | - |
| Khatha, survey 145/1 | - |
| RTC, survey 145/1 | - |
| Mutation, survey 145/1 | - |
| Encumbrance Certificate, survey 145/1 | - |
| Conversion/Alienation Order, survey 145/1 | - |
| Sale/Title/Gift Deed, survey 145/1 | - |
| Khatha, survey 145/1 | - |
| RTC, survey 145/1 | - |
| Mutation, survey 145/1 | - |
| Encumbrance Certificate, survey 145/1 | - |
| Conversion/Alienation Order, survey 145/1 | - |
| Sale/Title/Gift Deed, survey 145/1 | - |
| Khatha, survey 145/1 | - |
| RTC, survey 146/1 | - |
| Mutation, survey 146/1 | - |
| Encumbrance Certificate, survey 146/1 | - |
| Conversion/Alienation Order, survey 146/1 | - |
| Sale/Title/Gift Deed, survey 146/1 | - |
| Khatha, survey 146/1 | - |
| RTC, survey 147/1 | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SNN Raj Etternia | SNN Raj Etternia, Sy no.146/1,147/1,147/2,145/1,144 of Kudlu village, Sarjapura Hobli, Harlur Road, Anekal Taluk, Bangalore - 560 068 | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep RAJ ETTERNIA E BLOCK (BUILDING 4) on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
MEMCO SKYLINE - JUTAKU
MEMCO SKYLINE PRIVATE LIMITED
SNN RAJ SERENITY
SNN Builders Private Limited
TVS Emerald Jardin
Emerald Haven Development Limited
CASAGRAND AMOR
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Assetz Mizumi Reserve Tower A1 A2 A4
APG COMMUNITY DEVELOPMENT PRIVATE LIMITED
Assetz Canvas & Cove 2.0 - Block B & C
APG HABITAT PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SNN Properties LLP
SNN Properties LLP has 3 registrations on RERA Karnataka, including RAJ HIGH GARDENS and RAJ ETTERNIA E BLOCK (BUILDING 4). Its filings declare 8 earlier projects, 4 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if RAJ ETTERNIA E BLOCK (BUILDING 4) is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of RAJ ETTERNIA E BLOCK (BUILDING 4)?
The registered promoter entity is SNN Properties LLP, a partnership firm as per the filing. Its GSTIN 29ACCFS2149A1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in RAJ ETTERNIA E BLOCK (BUILDING 4)?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at RAJ ETTERNIA E BLOCK (BUILDING 4)?
The professionals named in the filing: Architect: Rana Ram; Engineer: K.L SRINIVAS; Chartered Accountant: Ramakrishna Kamat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAJ ETTERNIA E BLOCK (BUILDING 4)?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback