Home / Browse projects / RAHEJA AMALTIS - WING B
RAHEJA AMALTIS - WING B
By K RAHEJA CORP REAL ESTATE PRIVATE LIMITED
RG-MH-06880 · RERA P51900054152 · Last updated on MahaRERA portal: 9 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 20 other registrations.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAHEJA AMALTIS - WING B is a Residential / Group Housing project by K RAHEJA CORP REAL ESTATE PRIVATE LIMITED in Sion West, 400022, registered with MahaRERA as P51900054152 on 29 Dec 2023. Possession is promised by 30 Sep 2028. 58 of the 66 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameRAHEJA AMALTIS - WING B
- TypeResidential / Group Housing
- Location
- Chunabhatti-BKC Connector road
- Sion West
- 400022
- Pincode400022
- RERA no.P51900054152
- ReraGenie IDRG-MH-06880
Builder
- NameK RAHEJA CORP REAL ESTATE PRIVATE LIMITED
- Entity typeCompany
- CINU40300MH2007PTC287012
- GSTIN27AABCF1838M1ZF
- DirectorsSUNIL MADHAV HINGORANI, RAMESH RANGANATHAN, RAVI CHANDRU RAHEJA, NEEL CHANDRU RAHEJA
- Company SecretoryJIGNASHA CHETAN THAKKAR
- Other registrations20 more →
- Completed1 of 21
- No longer live8 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Dec 2023
- Promised completion30 Sep 2028
- Revised completionNone
- Buildings1 building record
- Documents filed119 files
Current status
Figures as on 9 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Raheja Amaltis - Wing B | NA | 22 | 17 | 66 | 0 | 66 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 22%.
Raheja Amaltis - Wing B: 38% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 22% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed131
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Raheja Amaltis - Wing B | NA | Rs 129.97 cr | Rs 29.72 cr |
| - | NA | Rs 6.23 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kasturi Pewekar |
| Engineer | Vaibhav Samarth |
| Engineer | Mohan Jakati |
| Chartered Accountant | S N Doshi & Associates |
| Chartered Accountant | G.M. Kapadia & Co. |
| Chartered Accountant | G M Kapadia & Co |
| Partner | Role in project |
|---|---|
| K RAHEJA CORP REAL ESTATE PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2028
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: 2A Amaltis Wing B Quality Assurance Certificate FYE2026 UPLOAD.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: 1 AMALTIS Wing B Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD. | 13 Apr 2026 |
| Withdrawal Update Form 2File: 2 Amaltis Wing B Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf | 13 Apr 2026 |
| Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-B 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf | 13 Apr 2026 |
| Withdrawal Update Form 1File: 1 AMALTIS Wing B Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD. | 9 Jan 2026 |
| Withdrawal Update Form 2File: 2 Amaltis Wing B Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf | 9 Jan 2026 |
| Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-B 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf | 9 Jan 2026 |
| Withdrawal Update Form 1File: 1 AMALTIS Wing B Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD. | 10 Oct 2025 |
| Withdrawal Update Form 1File: 1 AMALTIS Wing B Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD. | 10 Oct 2025 |
| Withdrawal Update Form 2File: 2 Amaltis Wing B Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: 2 Amaltis Wing B Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-B 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-B 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf | 10 Oct 2025 |
| Form 5 (FY 2024-2025)File: 5 Raheja Amaltis Wing B FY 2024-25 KRCREPL Report_Ann1_Ann2 UPLOAD.pdf | 28 Sep 2025 |
| Withdrawal Update Form 1File: 1 AMALTIS Wing B Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD. | 20 Aug 2025 |
| Withdrawal Update Form 2File: 2 Amaltis Wing B Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf | 20 Aug 2025 |
| Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-B 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf | 20 Aug 2025 |
| Withdrawal Update Form 1File: 1 AMALTIS Wing B Architect Certificate 2025-04-15 Mar2025 for Plans dated 02012025 UPLOAD. | 6 Aug 2025 |
| Withdrawal Update Form 2File: 2 Amaltis Wing B Engineer Certificate 2025-04-17 Mar2025 Plans dated 02012025 UPLOAD.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-B 2025-08-04 Mar2025 Plans 02012025 UPLOAD.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: 1 AMALTIS Wing B Architect Certificate 2025-01-14 Oct2024 for Plans dated 02012025 UPLOAD. | 15 Jul 2025 |
| Withdrawal Update Form 2File: 2 Amaltis Wing B Engineer Certificate 2025-01-14 Oct2024 Plans dated 02012025 UPLOAD.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: 3 Raheja Amaltis Wing B 2025-01-14 Oct 2024 Plans dated 02012025 UPLOAD.pdf | 15 Jul 2025 |
| Form 2A (FY 2024-2025)File: 2A Amaltis Wing B Quality Assurance Certificate FYE2025 UPLOAD.pdf | 22 May 2025 |
| Proforma of Allotment letterFile: Allotment Letter Amaltis Wing B 2025-03-26 UPLOAD.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q4 FY25 UPLOAD.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q4 FY25 UPLOAD.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q4 FY25 UPLOAD.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Amaltis Wing B Inventory 2025-03-31 Plans 02012025 UPLOAD.pdf | 16 Apr 2025 |
| Proforma of Agreement for saleFile: AFS Amaltis Wing-A 2025-04-02 UPLOAD.pdf | 16 Apr 2025 |
| Proforma of Agreement for saleFile: AFS Amaltis Wing-B 2025-04-02 UPLOAD.pdf | 16 Apr 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing B - Greivance Redressal Cell with Complaints Status Q4 FY25 UPLOAD.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q3 FY25 UPLOAD.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q3 FY25 UPLOAD.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q3 FY25 UPLOAD.pdf | 19 Feb 2025 |
| Building plan approvalFile: Amaltis Amended Approval 2025-01-02 Letter actual UPLOAD.pdf | 19 Jan 2025 |
| Building plan approvalFile: Amaltis Amended Approval 2025-01-02 Wing B Drawings HL All-B Part1 UPLOAD.pdf | 19 Jan 2025 |
| Building plan approvalFile: Amaltis Amended Approval 2025-01-02 Wing B Drawings HL All-B Part2 UPLOAD.pdf | 19 Jan 2025 |
| Proforma of Allotment letterFile: Allotment Letter Amaltis Wing B 2024-10-14 UPLOAD.pdf | 19 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 AMALTIS Wing B Architect Certificate 2025-01-14 Oct2024 for Plans dated 02012025 UPLOAD. | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Raheja Amaltis Wing B 2025-01-14 Oct 2024 Plans dated 02012025 UPLOAD.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Amaltis Wing B Engineer Certificate 2025-01-14 Oct2024 Plans dated 02012025 UPLOAD.pdf | 19 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Amaltis CC 2025-01-10 Revalidation letter for plans 02012025 UPLOAD.pdf | 19 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Amaltis Amended Approval 2025-01-02 Letter actual UPLOAD.pdf | 19 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Amaltis Amended Approval 2025-01-02 Wing B Drawings HL All-B Part1 UPLOAD.pdf | 19 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Amaltis Amended Approval 2025-01-02 Wing B Drawings HL All-B Part2 UPLOAD.pdf | 19 Jan 2025 |
| Other - LegalFile: Land Subdivision declaratoin Amaltis-B 2025-01-14 UPLOAD.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Amaltis Wing B Inventory 2024-12-31 Plans 02012025 UPLOAD.pdf | 19 Jan 2025 |
| Declaration about Commencement CertificateFile: CC Declaration Wing B 2025-01-14 UPLOAD.pdf | 19 Jan 2025 |
| Proforma of Agreement for saleFile: AFS Amaltis Wing-B 2025-01-15 UPLOAD.pdf | 19 Jan 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing B - Status of Complaints Q3FY25 UPLOAD.pdf | 19 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Amaltis CC 2024-10-30 Revalidation letter UPLOAD.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 AMALTIS Wing B Architect Certificate 2024-12-13 (Oct 2024) for Plans dated 06112024 UPLO | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Raheja Amaltis Wing B 2024-12-24 Oct 2024 Plans dated 06112024 UPLOAD.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Amaltis Wing B Engineer Certificate 2024-12-13 (Oct 2024) Plans dated 06112024 UPLOAD.pd | 2 Jan 2025 |
| Building plan approvalFile: Amaltis-B Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf | 19 Nov 2024 |
| Building plan approvalFile: Amaltis-B Amended Approval 2024-11-06 Drawing Page (2-11 and 14) UPLOAD.pdf | 19 Nov 2024 |
| Building plan approvalFile: Amaltis-B Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf | 19 Nov 2024 |
| Building plan approvalFile: Amaltis-B Amended Approval 2024-11-06 Drawing Page (2-11 and 14) UPLOAD.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amaltis-B Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amaltis-B Amended Approval 2024-11-06 Drawing Page (2-11 and 14) UPLOAD.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amaltis-B Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amaltis-B Amended Approval 2024-11-06 Drawing Page (2-11 and 14) UPLOAD.pdf | 19 Nov 2024 |
| Proforma of Allotment letterFile: Allotment Letter Amaltis Wing B 2024-10-14 UPLOAD.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q2 FY25 UPLOAD.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q2 FY25 UPLOAD.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q2 FY25 UPLOAD.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Amaltis Wing B Inventory 2024-09-30 UPLOAD.pdf | 18 Oct 2024 |
| Proforma of Agreement for saleFile: AFS Amaltis Wing B 2024-10-14 UPLOAD.pdf | 18 Oct 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing B - Status of Complaints Q2FY25 UPLOAD.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5 Raheja Amaltis Wing B FY 2023-24 KRCREPL Report_Ann1_Ann2 UPLOAD.pdf | 18 Oct 2024 |
| Form 5 (FY 2023-2024)File: 5 Raheja Amaltis Wing B FY 2023-24 KRCREPL Report_Ann1_Ann2 UPLOAD.pdf | 29 Sep 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q1 FY25 UPLOAD.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q1 FY25 UPLOAD.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Amaltis Wing B Inventory 2024-06-30 UPLOAD.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q1 FY25 UPLOAD.pdf | 17 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing B - Status of Complaints Q1FY25 UPLOAD.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Amaltis Wing B Supervisor Certificate FY 2023-24 UPLOAD.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q4 FY24 UPLOAD.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing B Self Declaration on Form 1-2-3 Q4 FY24 UPLOAD.pdf | 18 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 20 other registrations, which the RERA portal never shows together
- All 119 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAHEJA AMALTIS - WING B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sion West
KINGS MY HOMES
Nilesh Laxmikant Kudalkar
RUNWAL TIMELESS
RUNWAL DEVELOPERS LIMITED
PROMONT
Sheth Smarthomes LLP
Proposed Redevelopment of existing Transit Cam
Maharashtra Housing and Area Development A
RAUNAK CENTRUM - A
Raunak Jigna Associates
SHIKARA HEIGHTS Phase-I
Shikara Constructions Pvt. Ltd.
Builder: K RAHEJA CORP REAL ESTATE PRIVATE LIMITED
K Raheja Corp Real Estate Private Limited has 21 registrations on MahaRERA, including Estrella, Viva, Pirangut and Orion, Viva, Pirangut. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 16 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if RAHEJA AMALTIS - WING B is delayed beyond 30 Sep 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAHEJA AMALTIS - WING B?
The registered promoter entity is K RAHEJA CORP REAL ESTATE PRIVATE LIMITED, a company as per the filing. Its CIN U40300MH2007PTC287012 and GSTIN 27AABCF1838M1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAHEJA AMALTIS - WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAHEJA AMALTIS - WING B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAHEJA AMALTIS - WING B?
The professionals named in the filing: Architect: Kasturi Pewekar; Engineer: Vaibhav Samarth; Engineer: Mohan Jakati; Chartered Accountant: S N Doshi & Associates; Chartered Accountant: G.M. Kapadia & Co.; Chartered Accountant: G M Kapadia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAHEJA AMALTIS - WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback