Home / Browse projects / RAHEJA AMALTIS - WING A

Registered No litigation declared Residential / Group Housing project

RAHEJA AMALTIS - WING A

By K RAHEJA CORP REAL ESTATE PRIVATE LIMITED

RG-MH-06914 · RERA P51900054129 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 20 other registrations.

See what the report covers Free either way: .
Sep 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 56%
35 of 63Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

RAHEJA AMALTIS - WING A is a Residential / Group Housing project by K RAHEJA CORP REAL ESTATE PRIVATE LIMITED in Sion West, 400022, registered with MahaRERA as P51900054129 on 29 Dec 2023. Possession is promised by 30 Sep 2028. 28 of the 63 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAHEJA AMALTIS - WING A
  • TypeResidential / Group Housing
  • Location
    • Chunabhatti-BKC Connector Road
    • Sion West
    • 400022
  • Pincode400022
  • RERA no.P51900054129
  • ReraGenie IDRG-MH-06914

Builder

  • NameK RAHEJA CORP REAL ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • CINU40300MH2007PTC287012
  • GSTIN27AABCF1838M1ZF
  • DirectorsSUNIL MADHAV HINGORANI, RAMESH RANGANATHAN, RAVI CHANDRU RAHEJA, NEEL CHANDRU RAHEJA
  • Company SecretoryJIGNASHA CHETAN THAKKAR
  • Other registrations20 more →
  • Completed1 of 21
  • No longer live8 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2023
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Current status

44%28 of 63 units booked
22.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Raheja Amaltis - Wing ANA221763063

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 56%.

Raheja Amaltis - Wing A: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed125

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots125
Closed/Covered125

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on21 May 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI12535.06
Proposed, not sanctioned10,065 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Tower, Bandra Kurla Complex, Bandra East, Mumbai 400051
Estimated costRs 136.91 cr
Cost incurredRs 30.13 cr
Work done22.0%
BuildingWingEstimatedIncurred
Raheja Amaltis - Wing ANARs 130.59 crRs 30.13 cr
-NARs 6.32 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKasturi Pewekar
EngineerVaibhav Samarth
EngineerMohan Jakati
Chartered AccountantS N Doshi & Associates
Chartered AccountantG.M. Kapadia & Co.
Chartered AccountantG M Kapadia & Co
PartnerRole in project
K RAHEJA CORP REAL ESTATE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A Amaltis Wing A Quality Assurance Certificate FYE2026 UPLOAD.pdf9 Jun 2026
Withdrawal Update Form 1File: 1 AMALTIS Wing A Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD.13 Apr 2026
Withdrawal Update Form 2File: 2 Amaltis Wing A Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf13 Apr 2026
Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-A 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf13 Apr 2026
Withdrawal Update Form 1File: 1 AMALTIS Wing A Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD.9 Jan 2026
Withdrawal Update Form 2File: 2 Amaltis Wing A Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf9 Jan 2026
Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-A 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf9 Jan 2026
Withdrawal Update Form 1File: 1 AMALTIS Wing A Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD.10 Oct 2025
Withdrawal Update Form 1File: 1 AMALTIS Wing A Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD.10 Oct 2025
Withdrawal Update Form 2File: 2 Amaltis Wing A Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf10 Oct 2025
Withdrawal Update Form 2File: 2 Amaltis Wing A Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf10 Oct 2025
Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-A 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf10 Oct 2025
Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-A 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf10 Oct 2025
Form 5 (FY 2024-2025)File: 5 Raheja Amaltis Wing A FY 2024-25 KRCREPL Report_Ann1_Ann2 UPLOAD.pdf28 Sep 2025
Withdrawal Update Form 1File: 1 AMALTIS Wing A Architect Certificate 2025-07-15 Jun2025 for Plans dated 02012025 UPLOAD.20 Aug 2025
Withdrawal Update Form 2File: 2 Amaltis Wing A Engineer Certificate 2025-07-15 Jun2025 Plans dated 02012025 UPLOAD.pdf20 Aug 2025
Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-A 2025-08-20 Jun2025 Plans 02012025 UPLOAD.pdf20 Aug 2025
Withdrawal Update Form 1File: 1 AMALTIS Wing A Architect Certificate 2025-04-15 Mar2025 for Plans dated 02012025 UPLOAD.5 Aug 2025
Withdrawal Update Form 2File: 2 Amaltis Wing A Engineer Certificate 2025-04-17 Mar2025 Plans dated 02012025 UPLOAD.pdf5 Aug 2025
Withdrawal Update Form 3File: 3 Raheja Amaltis Wing-A 2025-08-04 Mar2025 Plans 02012025 UPLOAD.pdf5 Aug 2025
Withdrawal Update Form 1File: 1 AMALTIS Wing A Architect Certificate 2025-01-14 Oct2024 for Plans dated 02012025 UPLOAD.15 Jul 2025
Withdrawal Update Form 2File: 2 Amaltis Wing A Engineer Certificate 2025-01-14 Oct2024 Plans dated 02012025 UPLOAD.pdf15 Jul 2025
Withdrawal Update Form 3File: 3 Raheja Amaltis Wing A 2025-01-14 Oct 2024 Plans dated 02012025 UPLOAD.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: 2A Amaltis Wing A Quality Assurance Certificate FYE2025 UPLOAD.pdf22 May 2025
Proforma of Allotment letterFile: Allotment Letter Amaltis Wing A 2025-03-26 UPLOAD.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q4 FY25 UPLOAD.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q4 FY25 UPLOAD.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q4 FY25 UPLOAD.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Amaltis Wing A Inventory 2025-03-31 Plans 02012025 UPLOAD.pdf16 Apr 2025
Proforma of Agreement for saleFile: AFS Amaltis Wing-A 2025-04-02 UPLOAD.pdf16 Apr 2025
Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing A - Greivance Redressal Cell with Complaints Status Q4 FY25 UPLOAD.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q3 FY25 UPLOAD.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q3 FY25 UPLOAD.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q3 FY25 UPLOAD.pdf19 Feb 2025
Other - FinanceFile: Amaltis Wing A Self-Certification for No Withdrawal No Deposit Q3FYE25 2025-01-17 UPLOAD.p20 Jan 2025
Building plan approvalFile: Amaltis Amended Approval 2025-01-02 Letter actual UPLOAD.pdf19 Jan 2025
Building plan approvalFile: Amaltis Amended Approval 2025-01-02 Wing A Drawings HL All-A Part1 UPLOAD.pdf19 Jan 2025
Building plan approvalFile: Amaltis Amended Approval 2025-01-02 Wing A Drawings HL All-A Part2 UPLOAD.pdf19 Jan 2025
Proforma of Allotment letterFile: Allotment Letter Amaltis Wing A 2024-10-14 UPLOAD.pdf19 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 AMALTIS Wing A Architect Certificate 2025-01-14 Oct2024 for Plans dated 02012025 UPLOAD.19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Raheja Amaltis Wing A 2025-01-14 Oct 2024 Plans dated 02012025 UPLOAD.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Amaltis Wing A Engineer Certificate 2025-01-14 Oct2024 Plans dated 02012025 UPLOAD.pdf19 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Amaltis CC 2025-01-10 Revalidation letter for plans 02012025 UPLOAD.pdf19 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Amaltis Amended Approval 2025-01-02 Wing A Drawings HL All-A Part1 UPLOAD.pdf19 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Amaltis Amended Approval 2025-01-02 Wing A Drawings HL All-A Part2 UPLOAD.pdf19 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Amaltis Amended Approval 2025-01-02 Letter actual UPLOAD.pdf19 Jan 2025
Other - LegalFile: Land Subdivision declaratoin Amaltis-A 2025-01-14 UPLOAD.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: Amaltis Wing A Inventory 2024-12-31 Plans 02012025 UPLOAD.pdf19 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration Wing A 2025-01-14 UPLOAD.pdf19 Jan 2025
Proforma of Agreement for saleFile: AFS Amaltis Wing-A 2025-01-15 UPLOAD.pdf19 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing A - Status of Complaints Q3FY25 UPLOAD.pdf19 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Amaltis CC 2024-10-30 Revalidation letter UPLOAD.pdf3 Jan 2025
Building plan approvalFile: Amaltis-A Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf19 Nov 2024
Building plan approvalFile: Amaltis-A Amended Approval 2024-11-06 Letter (0) and Drawing Page (2-11 and 13) UPLOAD.pdf19 Nov 2024
Building plan approvalFile: Amaltis-A Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf19 Nov 2024
Building plan approvalFile: Amaltis-A Amended Approval 2024-11-06 Letter (0) and Drawing Page (2-11 and 13) UPLOAD.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Amaltis-A Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Amaltis-A Amended Approval 2024-11-06 Letter (0) and Drawing Page (2-11 and 13) UPLOAD.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Amaltis-A Amended Approval 2024-11-06 Letter (0) and Drawing Page (2-11 and 13) UPLOAD.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Amaltis-A Amended Approval 2024-11-06 Letter (2) and Drawing Page (1) UPLOAD.pdf19 Nov 2024
Proforma of Allotment letterFile: Allotment Letter Amaltis Wing A 2024-10-14 UPLOAD.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q2 FY25 UPLOAD.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q2 FY25 UPLOAD.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q2 FY25 UPLOAD.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Amaltis Wing A Inventory 2024-09-30 UPLOAD.pdf18 Oct 2024
Other - FinanceFile: Amaltis Wing A Self-Certification for No Withdrawal No Deposit 2024-10-17 UPLOAD.pdf18 Oct 2024
Proforma of Agreement for saleFile: AFS Amaltis Wing A 2024-10-14 UPLOAD.pdf18 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing A - Status of Complaints Q2FY25 UPLOAD.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5 Raheja Amaltis Wing A FY 2023-24 KRCREPL Report_Ann1_Ann2 UPLOAD.pdf18 Oct 2024
Form 5 (FY 2023-2024)File: 5 Raheja Amaltis Wing A FY 2023-24 KRCREPL Report_Ann1_Ann2 UPLOAD.pdf29 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q1 FY25 UPLOAD.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q1 FY25 UPLOAD.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Amaltis Wing A Inventory 2024-06-30 UPLOAD.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q1 FY25 UPLOAD.pdf17 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Raheja Amaltis Wing A - Status of Complaints Q1FY25 UPLOAD.pdf17 Jul 2024
Other - FinanceFile: Amaltis Wing A Self-Certification for No Withdrawal No Deposit 2024-07-12 UPLOAD.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Amaltis Wing A Supervisor Certificate FY 2023-24 UPLOAD.pdf29 May 2024
Other - FinanceFile: Amaltis Wing A Self-Certification for No Withdrawal No Deposit 2024-04-19 UPLOAD.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q4 FY24 UPLOAD.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Raheja Amaltis Wing A Self Declaration on Form 1-2-3 Q4 FY24 UPLOAD.pdf18 Apr 2024

Keep RAHEJA AMALTIS - WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sion West

Builder: K RAHEJA CORP REAL ESTATE PRIVATE LIMITED

K Raheja Corp Real Estate Private Limited has 21 registrations on MahaRERA, including Estrella, Viva, Pirangut and Orion, Viva, Pirangut. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 16 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if RAHEJA AMALTIS - WING A is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAHEJA AMALTIS - WING A?

The registered promoter entity is K RAHEJA CORP REAL ESTATE PRIVATE LIMITED, a company as per the filing. Its CIN U40300MH2007PTC287012 and GSTIN 27AABCF1838M1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAHEJA AMALTIS - WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAHEJA AMALTIS - WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAHEJA AMALTIS - WING A?

The professionals named in the filing: Architect: Kasturi Pewekar; Engineer: Vaibhav Samarth; Engineer: Mohan Jakati; Chartered Accountant: S N Doshi & Associates; Chartered Accountant: G.M. Kapadia & Co.; Chartered Accountant: G M Kapadia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAHEJA AMALTIS - WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAHEJA AMALTIS - WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAHEJA AMALTIS - WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.