ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / RAGHUNATH

Registered No litigation declared Residential / Group Housing project

RAGHUNATH

By Aayushi Corporation

RG-MH-05872 · RERA P52000051331 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 90%
41 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

RAGHUNATH is a Residential / Group Housing project by Aayushi Corporation in Raigarh, Maharashtra, registered with MahaRERA as P52000051331 on 8 Jun 2023. Possession is promised by 31 Dec 2026. 29 of the 70 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAGHUNATH
  • TypeResidential / Group Housing
  • Location
    • Sector 21
    • Plot No 222
    • Kamothe
    • Panvel
    • Raigarh
    • 410209
  • Pincode410209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000051331
  • ReraGenie IDRG-MH-05872

Builder

  • NameAayushi Corporation
  • Entity typePartnership
  • PartnersDhiren Pravin Sakhrani, Bhusan Bharat Mhaskar, Champshi Amba Charla, Bhaven Haresh Maheshwari
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Current status

41%29 of 70 units booked
66.2%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAGHUNATHNA151470070

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

RAGHUNATH: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byNot the promoter
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
Dinesh Manohar BhagatPanvelRaigarh
Rohini Manohar BhagatPanvelRaigarh
Sarita Atul BhagatPanvelRaigarh
Darshana Manohar BhagatPanvelRaigarh
Sushila Manohar BhagatPanvelRaigarh
Ratnaprabha Eknath BhagatPanvelRaigarh
Mahendra Eknath BhagatPanvelRaigarh
Satyendra Eknath BhagatPanvelRaigarh
Anjali Uday DeshmukhPanvelRaigarh
Omkar Parshuram BhagatPanvelRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI4050.78
Proposed, not sanctioned4,051 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 2, Karnala Royal, Panvel 410206
Estimated costRs 9.30 cr
Cost incurredRs 6.15 cr
Work done66.17%
BuildingWingEstimatedIncurred
RAGHUNATHNARs 8.84 crRs 6.15 cr
-NARs 46.50 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSatish V Ahuja and Associates
EngineerS R Consultants
EngineerAtish Kumar Singh
Chartered AccountantSachin Maheshwari and Co
Chartered AccountantG D Shah and Associates
PartnerRole in project
Aayushi Corporation-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: CC Amended Drawing.pdf17 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf16 Apr 2026
Withdrawal Update Form 1File: Q4Form1.pdf14 Apr 2026
Withdrawal Update Form 2File: Q4Form2.pdf14 Apr 2026
Withdrawal Update Form 3File: Q4Form3.pdf14 Apr 2026
Form 1File: Q1Form1.pdf11 Feb 2026
Form 2File: Q1Form2.pdf11 Feb 2026
Form 3File: Q1Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q1Soldunsold.pdf11 Feb 2026
Form 1File: Q2Form1.pdf11 Feb 2026
Form 2File: Q2Form2.pdf11 Feb 2026
Form 3File: Q2Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q2Soldunsold.pdf11 Feb 2026
Form 1File: Q3Form1.pdf11 Feb 2026
Form 2File: Q3Form2.pdf11 Feb 2026
Form 3File: Q3Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q3SoldUnsold.pdf11 Feb 2026
Form 1File: Q4Form1.pdf11 Feb 2026
Form 2File: Q4Form2.pdf11 Feb 2026
Form 3File: Q4Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf11 Feb 2026
Form 1File: Q1Form1.pdf11 Feb 2026
Form 2File: Q1Form2.pdf11 Feb 2026
Form 3File: Q1Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf11 Feb 2026
Form 1File: Q2Form1.pdf11 Feb 2026
Form 2File: Q2Form2.pdf11 Feb 2026
Form 3File: Q2Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q2SoldUnsold.pdf11 Feb 2026
Form 1File: Q3Form1.pdf11 Feb 2026
Form 2File: Q3Form2.pdf11 Feb 2026
Form 3File: Q3Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q3SoldUnsold.pdf11 Feb 2026
Form 1File: Q4Form1.pdf11 Feb 2026
Form 2File: Q4Form2.pdf11 Feb 2026
Form 3File: Q4Form3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q4SoldUnsold.pdf11 Feb 2026
Withdrawal Update Form 1File: Q3Form1.pdf11 Feb 2026
Withdrawal Update Form 2File: Q3Form2.pdf11 Feb 2026
Withdrawal Update Form 3File: Q3Form3.pdf11 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf13 Jan 2026
Withdrawal Update Form 1File: Q1Form1.pdf4 Dec 2025
Withdrawal Update Form 2File: Q2Form2.pdf4 Dec 2025
Withdrawal Update Form 3File: Q2Form3.pdf4 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf25 Nov 2025
Form 5 (FY 2023-2024)File: Form 5.pdf25 Nov 2025
Form 5 (FY 2024-2025)File: Form 5.pdf25 Nov 2025
Withdrawal Update Form 1File: Q1Form1.pdf6 Sep 2025
Withdrawal Update Form 1File: Q1Form1.pdf6 Sep 2025
Withdrawal Update Form 2File: Q1Form2.pdf6 Sep 2025
Withdrawal Update Form 2File: Q1Form2.pdf6 Sep 2025
Withdrawal Update Form 3File: Q1Form3.pdf6 Sep 2025
Withdrawal Update Form 3File: Q1Form3.pdf6 Sep 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4Form2.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: SoldUnsold.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4Form1.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3Form3.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Q3SoldUnsold.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3Form2.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3Form1.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3Form3.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2Form2.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: SoldUnsold.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2Form1.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1Form1.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1Form3.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1Form2.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4Form2.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4Form3.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4Form1.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Q3SoldUnsold.pdf11 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3Form2.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3Form3.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3FORM1.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Q1Soldunsold.pdf9 Nov 2023
Disclosure of sold/ booked inventoryFile: Q2Soldunsold.pdf9 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Aayushi EnclavePlot No 32 Karanjade Panvel Raigad 4102061CompletedSep 2020Late, Dec 2021

How this compares with Raigarh

41%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAGHUNATH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Plot No 2225,900+ in Raigarh

2 kmRAGHUNATHCompleted 57Lapsed / revoked 7Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 109 registered projects within 2 km.

Builder: Aayushi Corporation

Aayushi Corporation has 4 registrations on MahaRERA, including Aayushi Homes and Aayushi Enclave. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if RAGHUNATH is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAGHUNATH?

The registered promoter entity is Aayushi Corporation, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAGHUNATH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAGHUNATH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAGHUNATH?

The professionals named in the filing: Architect: Satish V Ahuja and Associates; Engineer: S R Consultants; Engineer: Atish Kumar Singh; Chartered Accountant: Sachin Maheshwari and Co; Chartered Accountant: G D Shah and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAGHUNATH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAGHUNATH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAGHUNATH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.