ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Radhey Galaxy Phase - III

Completed No litigation declared Others project

Radhey Galaxy Phase - III

By Radhey Properties LLP

RG-MH-38908 · RERA P52000048454 · Last updated on MahaRERA portal: 3 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Radhey Galaxy Phase - III is a Others project by Radhey Properties LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000048454 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameRadhey Galaxy Phase - III
  • TypeOthers
  • Location
    • Station Road
    • Bhisegaon
    • Karjat
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • RERA no.P52000048454
  • ReraGenie IDRG-MH-38908

Builder

  • NameRadhey Properties LLP
  • Entity typePartnership
  • PartnersPrathit Vinit Kedia, Rachna Vinit Kedia, Vinit Jagdishprasad Kedia
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - 1NA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Building - 1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Swimming PoolYes100%
Stilt ParkingYes100%
IntercomYes100%
Battery BackupYes100%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,249 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shree Siddhivinayak EnterprisesNavi Mumbai (M Corp.)Thane

Approvals and building plan

Permissible FSI1821.7
Proposed, not sanctioned1,822 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch210, Mittal Tower, B wing, Nariman Point, Mumbai, 400021

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Radhey Properties LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Mar 2025

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on Dec 2024.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase III as on 4th Feb 2025.pdf19 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RADHEY LOWER B FULL OC_PDF.pdf1 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase-III as on 31st December 2024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on Dec 2024.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31st December 2024.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase 3 as on September 2024.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III as on Sept 2024.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Radhe Galaxy Phase III as on FY 2023-24.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 30th September 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 30-06-2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on June 2024.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Radhey Galaxy Phase 3 for FY 2023-24.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on June 2024.pdf15 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Declaration of Allottee Grievance Redressal Cell.pdf1 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A_P-3_March2024.pdf22 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III as on March 2024.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31-03-2024.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31-03-2024.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on March 2024.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on March 2024.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Radhey Galaxy Phase- III as on Dec 2023.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31-12-2023.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on Dec 2023.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on Dec 2023.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase lll as on March 2023.pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase lll as on June 2023.pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase lll as on Sept 2023.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase lll as on March 2023.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase lll as on June 2023.pdf14 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase lll as on Sept 2023.pdf14 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase lll as on March 2023.pdf14 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase lll as on June 2023.pdf14 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase lll as on Sept 2023.pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - Radhey Galaxy Phase-III as on Sep 2023.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Radhey Galaxy Phase- III as on September 2023.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase - III as on Sep 2023.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Radhey Galaxy Phase-III as on 30-09-2023.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Radhe Galaxy Phase III as on 31st March 2023.pdf26 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A Phase-III a on 2022-23.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Radhey Galaxy Phase III as on 30-06-2023.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Radhey Galaxy Phase-III as on 30-06-2023.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate as on 30th June 2023.pdf7 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventory_disclosure Phase-III_31032023.pdf25 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase 3.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects RERA certificate.pdf11 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Radhey Galaxy Phase III.pdf13 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter - Radhey.pdf23 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect_Certificate_Rera_phase_III.pdf12 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200254504485_For_Asset_Based_Search_12_12_2022_12_58_39_117.pdf12 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 - Final Phase-III (1).pdf12 Dec 2022
Proforma of Allotment letterFile: Final AL Radhey Galaxy Phase-III.pdf12 Dec 2022
Proforma of Agreement for saleFile: Final AFS Radhey Galaxy III.pdf12 Dec 2022
Copy of the legal title reportFile: Legal Title Report (1)_compressed (1).pdf7 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Report -Allotment Letter.pdf7 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report -Agreement for sale_compressed.pdf7 Dec 2022
Layout approvalFile: Revised Building No 1_Plan_11zon_rotated.pdf5 Dec 2022
Building plan approvalFile: Revised Building No 1_Plan_11zon_rotated.pdf5 Dec 2022
PAN CardFile: GetUserDocumentFileContent_rotated.pdf5 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finance.pdf5 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Legal.pdf5 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter Finance.pdf5 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter Legal.pdf5 Dec 2022
Copy of Layout Approval (in case of layout)File: Revised Building No 1_Plan_11zon_rotated.pdf5 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Building No 1_Plan_11zon_rotated.pdf5 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised Building No 1 CC.pdf5 Dec 2022
Declaration about Commencement CertificateFile: Format D.pdf5 Dec 2022
Declaration in FORM BFile: Affidavit cum declaration.pdf5 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf5 Dec 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Radhey Galaxy Phase-1Karjat Bhisegoan- 410201210CompletedNov 2021Feb 2020
Radhey Residency ExtensionSurvey No 16 Village Vichumbe Taluka Panvel Dist Raigad 410206112CompletedDec 2015Aug 2014
Radhey HeritageSurvey No 110-0 & 113-1 village Palaspe Taluka Panvel Dis Raigad 410206304CompletedDec 2015Mar 2014
Green EarthSurvey No 89-0 Village Umroli Taluka Panvel Dist Raigad180CompletedJun 2015Jun 2015

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Radhey Galaxy Phase - III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhisegaon, Karjat5,900+ in Raigarh

Builder: Radhey Properties LLP

Radhey Properties LLP has 3 registrations on MahaRERA, including Radhey Galaxy - Phase I and Radhey Galaxy - Phase 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Radhey Galaxy Phase - III is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Radhey Galaxy Phase - III?

The registered promoter entity is Radhey Properties LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Radhey Galaxy Phase - III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Radhey Galaxy Phase - III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Radhey Galaxy Phase - III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Radhey Galaxy Phase - III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Radhey Galaxy Phase - III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.