Home / Browse projects / Raigarh, Maharashtra / Radhey Galaxy Phase - III
Radhey Galaxy Phase - III
RG-MH-38908 · RERA P52000048454 · Last updated on MahaRERA portal: 3 Apr 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Radhey Galaxy Phase - III is a Others project by Radhey Properties LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000048454 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameRadhey Galaxy Phase - III
- TypeOthers
- Location
- Station Road
- Bhisegaon
- Karjat
- Karjat
- Raigarh
- 410201
- Pincode410201
- RERA no.P52000048454
- ReraGenie IDRG-MH-38908
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Jan 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building - 1 | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Building - 1: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities19
As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Stilt Parking | Yes | 100% |
| Intercom | Yes | 100% |
| Battery Backup | Yes | 100% |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shree Siddhivinayak Enterprises | Navi Mumbai (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Radhey Properties LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Mar 2025
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on Dec 2024.pdf | 3 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase III as on 4th Feb 2025.pdf | 19 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RADHEY LOWER B FULL OC_PDF.pdf | 1 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase-III as on 31st December 2024.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on Dec 2024.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31st December 2024.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase 3 as on September 2024.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III as on Sept 2024.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Radhe Galaxy Phase III as on FY 2023-24.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 30th September 2024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III as on June 2024.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 30-06-2024.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on June 2024.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Radhey Galaxy Phase 3 for FY 2023-24.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on June 2024.pdf | 15 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Declaration of Allottee Grievance Redressal Cell.pdf | 1 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A_P-3_March2024.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III as on March 2024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31-03-2024.pdf | 12 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31-03-2024.pdf | 11 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on March 2024.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on March 2024.pdf | 6 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Radhey Galaxy Phase- III as on Dec 2023.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase-III as on 31-12-2023.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase III as on Dec 2023.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase III as on Dec 2023.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase lll as on March 2023.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase lll as on June 2023.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Radhey Galaxy Phase lll as on Sept 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase lll as on March 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase lll as on June 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase lll as on Sept 2023.pdf | 14 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase lll as on March 2023.pdf | 14 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase lll as on June 2023.pdf | 14 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase lll as on Sept 2023.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - Radhey Galaxy Phase-III as on Sep 2023.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Radhey Galaxy Phase- III as on September 2023.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Radhey Galaxy Phase - III as on Sep 2023.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Radhey Galaxy Phase-III as on 30-09-2023.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Radhe Galaxy Phase III as on 31st March 2023.pdf | 26 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A Phase-III a on 2022-23.pdf | 22 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Radhey Galaxy Phase III as on 30-06-2023.pdf | 14 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Radhey Galaxy Phase-III as on 30-06-2023.pdf | 14 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate as on 30th June 2023.pdf | 7 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory_disclosure Phase-III_31032023.pdf | 25 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Radhey Galaxy Phase III.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Radhey Galaxy Phase 3.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects RERA certificate.pdf | 11 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Radhey Galaxy Phase III.pdf | 13 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Letter - Radhey.pdf | 23 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect_Certificate_Rera_phase_III.pdf | 12 Dec 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200254504485_For_Asset_Based_Search_12_12_2022_12_58_39_117.pdf | 12 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 - Final Phase-III (1).pdf | 12 Dec 2022 |
| Proforma of Allotment letterFile: Final AL Radhey Galaxy Phase-III.pdf | 12 Dec 2022 |
| Proforma of Agreement for saleFile: Final AFS Radhey Galaxy III.pdf | 12 Dec 2022 |
| Copy of the legal title reportFile: Legal Title Report (1)_compressed (1).pdf | 7 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report -Allotment Letter.pdf | 7 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report -Agreement for sale_compressed.pdf | 7 Dec 2022 |
| Layout approvalFile: Revised Building No 1_Plan_11zon_rotated.pdf | 5 Dec 2022 |
| Building plan approvalFile: Revised Building No 1_Plan_11zon_rotated.pdf | 5 Dec 2022 |
| PAN CardFile: GetUserDocumentFileContent_rotated.pdf | 5 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finance.pdf | 5 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter Legal.pdf | 5 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter Finance.pdf | 5 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter Legal.pdf | 5 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: Revised Building No 1_Plan_11zon_rotated.pdf | 5 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building No 1_Plan_11zon_rotated.pdf | 5 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Building No 1 CC.pdf | 5 Dec 2022 |
| Declaration about Commencement CertificateFile: Format D.pdf | 5 Dec 2022 |
| Declaration in FORM BFile: Affidavit cum declaration.pdf | 5 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 5 Dec 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Radhey Galaxy Phase-1 | Karjat Bhisegoan- 410201 | 210 | Completed | Nov 2021 | Feb 2020 |
| Radhey Residency Extension | Survey No 16 Village Vichumbe Taluka Panvel Dist Raigad 410206 | 112 | Completed | Dec 2015 | Aug 2014 |
| Radhey Heritage | Survey No 110-0 & 113-1 village Palaspe Taluka Panvel Dis Raigad 410206 | 304 | Completed | Dec 2015 | Mar 2014 |
| Green Earth | Survey No 89-0 Village Umroli Taluka Panvel Dist Raigad | 180 | Completed | Jun 2015 | Jun 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
Keep Radhey Galaxy Phase - III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhisegaon, Karjat5,900+ in Raigarh
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: Radhey Properties LLP
Radhey Properties LLP has 3 registrations on MahaRERA, including Radhey Galaxy - Phase I and Radhey Galaxy - Phase 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Radhey Galaxy Phase - III is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Radhey Galaxy Phase - III?
The registered promoter entity is Radhey Properties LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Radhey Galaxy Phase - III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Radhey Galaxy Phase - III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Radhey Galaxy Phase - III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback