Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Radhey Galaxy - Phase I is a Residential / Group Housing project by Radhey Properties LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000004479 on 9 Aug 2017. The registration is recorded completed; possession was promised by 28 Nov 2022.
At a glance
Project
- NameRadhey Galaxy - Phase I
- TypeResidential / Group Housing
- Location
- karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000004479
- ReraGenie IDRG-MH-24788
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Aug 2017
- Promised completion28 Nov 2022
- Revised completionNone
- Buildings6 building records
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Radhey Galaxy - Phase I - 2A | NA | 9 | 0 | 0 | 0 | 0 |
| Radhey Galaxy - Phase I - 2B | NA | 9 | 0 | 0 | 0 | 0 |
| Radhey Galaxy - Phase I - 3A | NA | 9 | 0 | 0 | 0 | 0 |
| Radhey Galaxy - Phase I - 3B | NA | 9 | 0 | 0 | 0 | 0 |
| Radhey Galaxy - Phase I - 5C | NA | 9 | 0 | 0 | 0 | 0 |
| Radhey Galaxy - Phase I - 5D | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 5 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
66 of 66 construction stages are filed complete across 6 buildings.
Radhey Galaxy - Phase I - 2A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Radhey Galaxy - Phase I - 2B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Radhey Galaxy - Phase I - 3A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Radhey Galaxy - Phase I - 3B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Radhey Galaxy - Phase I - 5C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Radhey Galaxy - Phase I - 5D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities18
As on 5 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 25% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | Yes | 100% |
| Battery Backup for Lift and Lobby | Yes | 100% |
| Intercom | Yes | 100% |
| swimming pool | Yes | 50% |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Radhey Galaxy - Phase I - 2A | 11 | 11 |
| Radhey Galaxy - Phase I - 2B | 11 | 11 |
| Radhey Galaxy - Phase I - 3A | 17 | 17 |
| Radhey Galaxy - Phase I - 3B | 17 | 17 |
| Radhey Galaxy - Phase I - 5C | 11 | 11 |
| Radhey Galaxy - Phase I - 5D | 18 | 18 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shree Siddhivinayak Enterprises | Navi Mumbai (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vastukalp |
| Architect | Dhrishti Architect & Interior Designers |
| Engineer | Vastukalp |
| Chartered Accountant | Agrawal Purohit & Co |
| Partner | Role in project |
|---|---|
| Radhey Properties LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Feb 2021
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Architects certificate.pdf | 5 Mar 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf | 14 Feb 2022 |
| OtherFile: KMC permission dated 15102018 club house land release.pdf | 14 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 13 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 13 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 13 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 13 Oct 2021 |
| Certificates of CA (Form 5)File: Form 5.pdf | 13 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf | 13 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 30062021.pdf | 9 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 30062021.pdf | 9 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer Certificate Phase I 30062021.pdf | 9 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Phase I dtd 30062021.pdf | 9 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 fy 1819.pdf | 9 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 1920.pdf | 9 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A-PhaseI-31032021.pdf | 23 Jul 2021 |
| Certificates of CA (Form 5)File: Form 5.pdf | 23 Jul 2021 |
| OtherFile: Form-2A-PhaseI-31032021.pdf | 23 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Disclousure of Inventory.pdf | 21 May 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 8 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Phase I.pdf | 1 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Phase I.pdf | 1 Feb 2021 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Phase I.pdf | 1 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Phase I.pdf | 28 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Phase I.pdf | 28 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Maharera form 2A phase 1.pdf | 28 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Maharera form 2A phase 1_1.pdf | 28 Jan 2020 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Phase I.pdf | 28 Jan 2020 |
| Details of encumbrancesFile: Declaration of Bank change.pdf | 20 Jan 2020 |
| Details of encumbrancesFile: Declaration of Encumbrances.pdf | 20 Jan 2020 |
| Details of encumbrancesFile: NOC ABHFL.pdf | 20 Jan 2020 |
| Certificates of CA (Form 5)File: FORM 5 fy 18-19.pdf | 30 Sep 2019 |
| Proforma of Allotment letterFile: ABHFL_RPPLP_to_Customer_Agreement Format.pdf | 30 Sep 2019 |
| OtherFile: No Dues Certificate.pdf | 30 Sep 2019 |
| Details of encumbrancesFile: Declaration of Encumbrances.pdf | 3 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 22 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 22 Jul 2019 |
| Certificates of CA (Form 3)File: CA certificate_Form-3.pdf | 22 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 23 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginers Certificate.pdf | 23 Apr 2019 |
| Certificates of CA (Form 3)File: CA certificate_Form-3.pdf | 23 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 23 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginers Certificate.pdf | 23 Jan 2019 |
| Certificates of CA (Form 3)File: CA certificate_Form-3.pdf | 23 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Achitect Certificate.pdf | 9 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate.pdf | 9 Oct 2018 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 9 Oct 2018 |
| Certificates of CA (Form 5)File: Ca Certified Form 5.pdf | 9 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf | 16 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate.pdf | 16 Jun 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 16 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech_certificate_RPLLP_Compressed.pdf | 15 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering_certificate_RPLLP_Compressed.pdf | 15 Mar 2018 |
| Certificates of CA (Form 3)File: CA_certificate_RPLLP_Compressed.pdf | 15 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 16 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: f1 ac.pdf | 16 Dec 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: f2 eg.pdf | 16 Dec 2017 |
| Certificates of CA (Form 3)File: Radhey Galaxy Form 3.pdf | 16 Dec 2017 |
| Certificates of CA (Form 3)File: f3 ca.pdf | 16 Dec 2017 |
| OtherFile: f4 ag.pdf | 16 Dec 2017 |
| Layout approvalFile: Plan 1.pdf | 28 Jul 2017 |
| Building plan approvalFile: Plan-Phase I.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Letter.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Plan-Phase I.pdf | 28 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 Phase I_with SSE Flats.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter and Agreement for Sale.pdf | 28 Jul 2017 |
| PAN CardFile: Radhey Properties LLP Pan Card.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Title.pdf | 27 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: 01.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: Form B_sign n Notary.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 Phase I.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 Phase I.pdf | 27 Jul 2017 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Radhey Galaxy Phase-1 | Karjat Bhisegoan- 410201 | 210 | Completed | Nov 2021 | Feb 2020 |
| Radhey Residency Extension | Survey No 16 Village Vichumbe Taluka Panvel Dist Raigad 410206 | 112 | Completed | Dec 2015 | Aug 2014 |
| Radhey Heritage | Survey No 110-0 & 113-1 village Palaspe Taluka Panvel Dis Raigad 410206 | 304 | Completed | Dec 2015 | Mar 2014 |
| Green Earth | Survey No 89-0 Village Umroli Taluka Panvel Dist Raigad | 180 | Completed | Jun 2015 | Jun 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
Keep Radhey Galaxy - Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near karjat5,900+ in Raigarh
Filed coordinates, straight-line distance. 104 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: Radhey Properties LLP
Radhey Properties LLP has 3 registrations on MahaRERA, including Radhey Galaxy - Phase I and Radhey Galaxy - Phase 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Radhey Galaxy - Phase I is delayed beyond 28 Nov 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Radhey Galaxy - Phase I?
The registered promoter entity is Radhey Properties LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Radhey Galaxy - Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Radhey Galaxy - Phase I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Radhey Galaxy - Phase I?
The professionals named in the filing: Architect: Vastukalp; Architect: Dhrishti Architect & Interior Designers; Engineer: Vastukalp; Chartered Accountant: Agrawal Purohit & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Radhey Galaxy - Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.