Completed No litigation declared Others project

Radhey Galaxy - Phase 2

By Radhey Properties LLP

RG-MH-14437 · RERA P52000022608 · Last updated on MahaRERA portal: 23 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
55 of 55Construction stages doneacross 5 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Radhey Galaxy - Phase 2 is a Others project by Radhey Properties LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000022608 on 9 Oct 2019. The registration is recorded completed; possession was promised by 30 Oct 2024.

At a glance

Project

  • NameRadhey Galaxy - Phase 2
  • TypeOthers
  • Location
    • STATION ROAD
    • BHISEGAON
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • RERA no.P52000022608
  • ReraGenie IDRG-MH-14437

Builder

  • NameRadhey Properties LLP
  • Entity typePartnership
  • PartnersPrathit Vinit Kedia, Rachna Vinit Kedia, Vinit Jagdishprasad Kedia
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2019PromisedOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Oct 2019
  • Promised completion30 Oct 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Radhey Galaxy - Phase 2 - 5ANA80000
Radhey Galaxy - Phase 2 - 5BNA90000
Radhey Galaxy - Phase 2 - 4ANA90000
Radhey Galaxy - Phase 2 - 4BNA90000
Radhey Galaxy - Phase 2 - 4CNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 23 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

55 of 55 construction stages are filed complete across 5 buildings.

Radhey Galaxy - Phase 2 - 5A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Radhey Galaxy - Phase 2 - 5B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Radhey Galaxy - Phase 2 - 4A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Radhey Galaxy - Phase 2 - 4B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Radhey Galaxy - Phase 2 - 4C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 23 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Battery Backup for Lift and LobbyYes0%
CCTVYes0%
IntercomYes95%
Swimming PoolYes95%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
Radhey Galaxy - Phase 2 - 5A11
Radhey Galaxy - Phase 2 - 5B11
Radhey Galaxy - Phase 2 - 4A11
Radhey Galaxy - Phase 2 - 4B11
Radhey Galaxy - Phase 2 - 4C11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,343 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shree Siddhivinayak EnterprisesNavi Mumbai (M Corp.)Thane

Approvals and building plan

Permissible FSI8765.0
Proposed, not sanctioned8,765 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchmittal court c wing nariman point mumbai 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastukalp
EngineerVastukalp
Chartered AccountantAgrawal Purohit & Co
PartnerRole in project
Radhey Properties LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Sep 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 May 2024

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A_P-2_June2024_Signed.pdf23 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Sold unsold Inventory Phase II for 3006024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA certificate_300624.pdf23 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate phase II completion work.pdf14 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Radhey Galaxy Full_OC copy.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Phase II.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA certificate_31032024.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 ARCHITECT’S CERTIFICATE.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 ENGINEER’S CERTIFICATE.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Radhey_31122023.pdf18 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC Phase II_4ABC and 5A.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -No 5.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architech certificate_30062023.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer certificate_30062023.pdf18 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form- 2A Phase-II_Annexure-C.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_Unsold inventory_30062023.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate_30062023.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventory_disclosure Phase-II_31032023.pdf1 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer certificate.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form- 2A Phase-II_Annexure-C.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architech certificate.pdf14 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf14 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2 Engineer certificate.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf17 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Phase II.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5-21-22 Phase II.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5-21-22 Phase II.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf19 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Phase II.pdf19 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form_2_A_310322.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf2 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf2 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf2 May 2022
Proforma of Allotment letterFile: Sale_Agreement_RPPLP_to_Customer.pdf14 Feb 2022
OtherFile: KMC permission dated 15102018 club house land release.pdf14 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate.pdf20 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Certificate.pdf20 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf13 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf13 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cetificate 30062021.pdf9 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30062021.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer Certificate Phase II 30062021.pdf9 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Phase II dtd 30062021.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2-310321 phaseII.pdf23 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5-19-20 PhaseII.pdf23 Jul 2021
OtherFile: Form-2-310321 phaseII.pdf23 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf21 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase 2.pdf1 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Phase 2.pdf1 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Phase 2.pdf1 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase 2.pdf28 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Phase 2.pdf28 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Maharera form 2A phase 1.pdf28 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Phase 2.pdf28 Jan 2020
Details of encumbrancesFile: Declaration of Bank Name.pdf20 Jan 2020
Details of encumbrancesFile: Declaration of Encumbrances.pdf20 Jan 2020
OtherFile: Declaration.pdf20 Jan 2020
Proforma of Allotment letterFile: C:\Users\user2\Desktop\FSA.pdf5 Dec 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Radhey Galaxy Phase-1Karjat Bhisegoan- 410201210CompletedNov 2021Feb 2020
Radhey Residency ExtensionSurvey No 16 Village Vichumbe Taluka Panvel Dist Raigad 410206112CompletedDec 2015Aug 2014
Radhey HeritageSurvey No 110-0 & 113-1 village Palaspe Taluka Panvel Dis Raigad 410206304CompletedDec 2015Mar 2014
Green EarthSurvey No 89-0 Village Umroli Taluka Panvel Dist Raigad180CompletedJun 2015Jun 2015

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Radhey Galaxy - Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHISEGAON5,900+ in Raigarh

Builder: Radhey Properties LLP

Radhey Properties LLP has 3 registrations on MahaRERA, including Radhey Galaxy - Phase I and Radhey Galaxy - Phase 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Radhey Galaxy - Phase 2 is delayed beyond 30 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Radhey Galaxy - Phase 2?

The registered promoter entity is Radhey Properties LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Radhey Galaxy - Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Radhey Galaxy - Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Radhey Galaxy - Phase 2?

The professionals named in the filing: Architect: Vastukalp; Engineer: Vastukalp; Chartered Accountant: Agrawal Purohit & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Radhey Galaxy - Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Radhey Galaxy - Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Radhey Galaxy - Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.