ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Radhe Anantam

Registered Litigation declared Residential / Group Housing project

Radhe Anantam

By Shruti Buildtech LLP

RG-MH-35736 · RERA PR1260002502659 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Allotment letter deviates from the model form

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
2 of 18Construction stages doneacross 2 buildings; furthest along: Basement (if any), 90%
216 of 220Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

Radhe Anantam is a Residential / Group Housing project by Shruti Buildtech LLP in Pune, Maharashtra, registered with MahaRERA as PR1260002502659 on 9 Mar 2026. Possession is promised by 31 Dec 2030. 4 of the 220 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete.

At a glance

Project

  • NameRadhe Anantam
  • TypeResidential / Group Housing
  • Location
    • Wadmukhwadi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002502659
  • ReraGenie IDRG-MH-35736

Builder

  • NameShruti Buildtech LLP
  • Entity typeLimited Liability Partnership
  • LLPINACF-0285
  • GSTIN27AFFFS0390K1ZP
  • Designated PartnersPravinkumar Rasiklal Patel, Ujash Atul Kumar Patel, Narendra Ambalal Patel, Sandeep Narshi Patel, Amit Ramanbhai Patel

Key dates

this monthRegisteredMar 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed34 files

Current status

2%4 of 220 units booked
9.8%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA16141100110
Wing DNA16141100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 90%.

Wing C31%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)Not applicable
Plinth90%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D31%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)Not applicable
Plinth90%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNo0%

Parking filed367

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots367
Stilt / Ground157
Basement210
BuildingStilt / GroundBasementTotal
Wing C76115191
Wing D8195176

Land and ownership117

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,200 sq m
Land owned byNot the promoter
Named landowners117
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Feb 2026
LandownerVillageDistrict
Sameer Suresh GundKelgaonPune
Nitin Rangnath Deo-Pune
Bhushan Sahebrao Chaudhari-Jalgaon
Vivek Dwarkanath Chinchole-Aurangabad
Amol Suresh Nerkar-Dhule
Tushar Suresh Nerkar-Dhule
Prashant Shantaram Yeole-Jalgaon
KIshna Ram-Pali
Pooja Vaibhav Rane-Dhule
Ashwini Amol Rane-Dhule
Vaishali Nileshkumar GarudkarPimpale SaudagarPune
Narendra Radheshyam Varma-Pune
Snehal Sanjay Nerkar-Pune
Ramkrishna Ramdas Jherwal-Pune
Reshma Kiran Desai-Mumbai City
Amol Bhalchandra Wani-Dhule
Pallavi Parag Kothavade-Pune
Anagha Amit Jadhav-Pune
Asha Sudhakar Yeole-Jalgaon
Vasantrao Tamiram Pate-Jalgaon
Pramod Dattatray Sonje-Nashik
Minal Kuldeep Yeole-Thane
Arti Sandeep Thite-Pune
Atul Rajendra Dhamane-Jalgaon
Archana Pramod Yeole-Jalgaon
Hemangi Prashant Sonje-Jalgaon
Shubhagi Santosh Dhole-Pune
Kalpesh Prakash Deo-Jalgaon
Manohar Bhausaheb Gangurde-Jalgaon
Ganesh Ramesh Jungale-Pune
Dhiraj Vinayak Badhan-Nashik
Dinesh Sahebrao Patil-Jalgaon
Nitin Subhash Patil-Jalgaon
Kirti Santosh Chaudhari-Pune
Subhash Chandrabhan Bansode-Pune
Manoj Ramesh Kotkar-Jalgaon
Ashishkumar Jayantilal Pokar-Pune
Pravinkumar Rasiklal Patel-Pune
Premla Sadeep Nikam-Pune
Pooja Sameer Gund-Pune
Vishal Bhaskarrao Ambhore-Pune
Shivaji Ashok Mhaisane-Buldana
Sanjay Manohar Supe-Pune
Mayuri Ronak POkharna-Pune
Avinash Bhaskarrao Ambhore-Pune
Nikhil Prabhakar Shinde-Jalgaon
Shivaji Narayanrao Deshmukh-Jalgaon
Manisha Dinkar Bhamare-Jalgaon
Sanjay Pandit Sonje-Jalgaon
Rajendra Bhavdu Bhokare-Jalgaon
Laxman Dhakalu Chauhan-Jalgaon
Sneha Narendra Bhadane-Dhule
Akash Narendra Bhadane-Dhule
Lata Hemkant Kothavade-Dhule
Harshal Vijay Kothavade-Jalgaon
Mahesh Gokul Amrutkar-Pune
Balasaheb Madhukar Aher-Nashik
Neeraj Kumar Ranjan-Pune
Sanjay Digambar Wani-Nashik
Rajendra Pandit Sonje-Jalgaon
Manoj Arjunrao Mali-Jalgaon
Rita Satish Sapkale-Jalgaon
Tangaram Kashinath Patil-Jalgaon
Kalpeshkumar Ravindra Songire-Pune
Umadevi Panchaiyya Swami-Solapur
Dhananjay Kashinath Yevla-Raigarh
Sheetal Vaibhav Kothavade-Pune
Umakant Kashinath Nagmoti-Thane
Ashok Kanifnath Yadav-Osmanabad
Sonal Neeranjan Bhame-Pune
Mayur Sanjay Shirude-Pune
Ravindra Bhoju Sonawane-Jalgaon
Rekha Shivajirao Deshmukh-Jalgaon
Nikhil Rajendra Naikude-Pune
Dilip Appaji Ware-Pune
Kalpesh Bhagwan Dhamane-Jalgaon
Bhalchandra Sukhdev Jadhav-Raigarh
Karishma Rohit POkharna-Pune
Poonam Bhagwan Chaudhari-Dhule
Manjusha Deepak Chaudhari-Pune
Sonali Sandeep Navgire-Pune
Sunil Sudam Padval-Pune
Akshay Goraknath Chavan-Pune
Pandurang Balu Kolekar-Pune
Hrishikesh Khanderao Pachore-Pune
Pooja Sushant Bagal-Satara
Sujit Narayan Bele-Pune
Milind Laxman Chaudhari-Pune
Anup Ananda Chaudhari-Pune
Chetan Ramesh Patil-Pune
Archana Sachin Nighot-Pune
Sachin Laxman Nighot-Pune
Pooja Siddharth Gund-Pune
Ajay Muktaji Gilbile-Pune
Prasad Vilas Gilbile-Pune
Prakash Harishchandra Shinde-Pune
Megha Prakash Shinde-Pune
Sachin Maruti Kamble-Pune
Dipali Sugriv Kamble-Solapur
Nikhil JUlalsingh Rathod-Jalgaon
Aruna Harshal Kalal-Pune
Smita Bajirao Sanap-Beed
Vijaykumar Mahadeorao Bandebuche-Pune
Rajendra Ramrao Devkar-Jalgaon
Snehal Sameer Dharmik-Pune
Shuma Deepak Chauhan-Thane
Deepak Mohansingh Chauhan-Thane
Parvati Ravindra Surpur-Pune
Swapnil Prabhakar Boravake-Pune
Mahendra Bhilla Wani-Pune
Sunil Raghunath Kotkar-Jalgaon
Arjun Sukhdev Jadhav-Osmanabad
Snehal Manteshwar Jogade-Solapur
Umesh Kashinath Mane-Osmanabad
Minal Rakesh Mhadanak-Thane
Narendra Ambalal Patel-Pune
Amit Ramanbhai Patel-Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI20948.64
Proposed, not sanctioned20,949 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLC-1, Wing A, Spine City, Sector - 9, Spine Road, New Pradhikaran, Moshi, Pune - 411026, Maharashtra
Estimated costRs 44.50 cr
Cost incurredRs 4.38 cr
Work done9.83%
BuildingWingEstimatedIncurred
Wing CNARs 21.50 crRs 2.58 cr
Wing DNARs 21.50 crRs 1.72 cr
-NARs 1.50 crRs 7.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrecision Architects & Planner
EngineerArrow Structural Consultants
EngineerVishal Balasaheb Jadhav
Chartered AccountantPravin Pise and Associates
Chartered AccountantBankim Patel & Associates
PartnerRole in project
Shruti Buildtech LLP-

Litigation declared2

CaseCourtStatus
499/2018/2018Civil Judge Senior DivisionOngoing
200/1960/1960Civil Judge Senior DivisionClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf13 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf13 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf13 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf13 Jul 2026
Withdrawal Update Form 3File: Form 3 - converted.pdf13 Jul 2026
Withdrawal Update Form 3File: Form 3 - converted.pdf13 Jul 2026
Layout approvalFile: Plan 01.pdf18 Apr 2026
Building plan approvalFile: Plan 01.pdf18 Apr 2026
Building plan approvalFile: Plan 02.pdf18 Apr 2026
Building plan approvalFile: Plan 03.pdf18 Apr 2026
Building plan approvalFile: Plan 04.pdf18 Apr 2026
Building plan approvalFile: Plan 05.pdf18 Apr 2026
Building plan approvalFile: Plan 06.pdf18 Apr 2026
Building plan approvalFile: Plan 07.pdf18 Apr 2026
Building plan approvalFile: Plan 08.pdf18 Apr 2026
Building plan approvalFile: Plan 09.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf18 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-2026 - Radhe Anantam.pdf18 Apr 2026
Declaration and undertaking (Annexure A)File: Annexure-A.pdf26 Feb 2026
Layout approvalFile: scan1259 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1259 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1260 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1261 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1266 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1267 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1268 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1269 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1270 - converted.pdf29 Jan 2026
Building plan approvalFile: scan1271 - converted.pdf29 Jan 2026

How this compares with Pune

2%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Radhe Anantam on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadmukhwadi13,700+ in Pune

2 kmRadhe AnantamCompleted 28Lapsed / revoked 16Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: Shruti Buildtech LLP

Shruti Buildtech LLP has 1 registration on MahaRERA, including Radhe Anantam. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Radhe Anantam is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Radhe Anantam?

The registered promoter entity is Shruti Buildtech LLP, a limited liability partnership as per the filing. Its LLPIN ACF-0285 and GSTIN 27AFFFS0390K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Radhe Anantam?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Radhe Anantam?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Radhe Anantam?

The professionals named in the filing: Architect: Precision Architects & Planner; Engineer: Arrow Structural Consultants; Engineer: Vishal Balasaheb Jadhav; Chartered Accountant: Pravin Pise and Associates; Chartered Accountant: Bankim Patel & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Radhe Anantam?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Radhe Anantam. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Radhe Anantam to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.