ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / R10-DEV HEIGHTS

Registered No litigation declared Residential / Group Housing project

R10-DEV HEIGHTS

By DEOVRAT JAISWAL

RG-MH-07384 · RERA P50500077142 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 57%
15 of 17Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

R10-DEV HEIGHTS is a Residential / Group Housing project by DEOVRAT JAISWAL in Nagpur, Maharashtra, registered with MahaRERA as P50500077142 on 23 Jul 2024. Possession is promised by 15 Oct 2027. 2 of the 17 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameR10-DEV HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • LAXMI NAGAR ROAD
    • Ajani
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440020
  • Pincode440020
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500077142
  • ReraGenie IDRG-MH-07384

Builder

  • NameDEOVRAT JAISWAL
  • Entity typeIndividual
  • Other registrations4 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2024PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion15 Oct 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

12%2 of 17 units booked
33.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
R-10 DEV HEIGHTSNA10917017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 57%.

R-10 DEV HEIGHTS: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes8%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes71%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership16

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area739 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
LandownerVillageDistrict
NIKITA RAJAN PATWARDHANNagpur (M Corp.)Nagpur
RAJAN PATWARDHANNagpur (M Corp.)Nagpur
BHALCHANDRA MORESHWAR JOSHINagpur (M Corp.)Nagpur
NITIN BALKRISHNA PATWARDHANNagpur (M Corp.)Nagpur
PUSHPA BHALCHANDRA DAMLENagpur (M Corp.)Nagpur
PARESH VIDHYADHAR KHAPARDENagpur (M Corp.)Nagpur
VISHAKHA PARESH KHAPARDENagpur (M Corp.)Nagpur
BHALCHANDRA VISHWANATH KALENagpur (M Corp.)Nagpur
RAJENDRA SHRAVAN DHOLENagpur (M Corp.)Nagpur
MEENAL RAJENDRA DHOLENagpur (M Corp.)Nagpur
BHAKTI DAMLENagpur (M Corp.)Nagpur
ANURADHA SUNIL DAMLENagpur (M Corp.)Nagpur
SHYAM NEMAJI PAUNIKARNagpur (M Corp.)Nagpur
SANDHYA SHYAM PAUNIKARNagpur (M Corp.)Nagpur
SAGAR JAYANT KAWARENagpur (M Corp.)Nagpur
MADHURI JAYANT KAWARENagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION (NMC)
Permissible FSI3915.99
Proposed, not sanctioned1,928 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRATAP NAGAR BRANCH, 45 VIDYA KUNJKOTWAL NAGAR, VEER SAVARKAR MARG, NAGPUR-440022
Estimated costRs 4.25 cr
Cost incurredRs 1.40 cr
Work done33.0%
BuildingWingEstimatedIncurred
R-10 DEV HEIGHTSNARs 4.25 crRs 1.40 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR LOKESH KADU
EngineerPRASHANT UPASANI
Chartered AccountantCA ANKIT TALREJA
PartnerRole in project
DEOVRAT JAISWAL-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500132Mrinal KatkarDEOVRAT JAISWAL19/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Oct 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 R-10-DEV HEIGHTS MAR-2026.pdf9 Jun 2026
Withdrawal Update Form 2File: FORM-2 R-10-DEV HEIGHTS MAR-2026.pdf9 Jun 2026
Withdrawal Update Form 3File: FORM-3 R-10-DEV HEIGHTS MAR-2026.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM 1 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM 1 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM 1 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM 2 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM 2 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM 2 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 R10-DEV HEIGHTS DECEMBER 2025.pdf19 Apr 2026
Form 1File: FORM 1 R10-DEV HEIGHTS MARCH 2025.pdf20 Mar 2026
Form 2File: FORM 2 MARCH 2025.pdf20 Mar 2026
Form 3File: form 3 march 2025.pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf20 Mar 2026
Form 1File: FORM 1 SEPTEMBER 2024.pdf20 Mar 2026
Form 2File: FORM 2 SEPTEMBER 2024.pdf20 Mar 2026
Form 3File: FORM 3 SEPTEMBER 2024.pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf20 Mar 2026
Form 1File: FORM 1 DECEMBER 2024.pdf20 Mar 2026
Form 2File: FORM 2 DECEMBER 2024.pdf20 Mar 2026
Form 3File: FORM 3 DECEMBER 2024.pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DECEMBER 2024.pdf20 Mar 2026
Withdrawal Update Form 1File: FORM 1 R10-DEV HEIGHTS JUNE 2025.pdf20 Mar 2026
Withdrawal Update Form 1File: FORM 1 R10-DEV HEIGHTS SEPTEMBER 2025.pdf20 Mar 2026
Withdrawal Update Form 1File: FORM 1 R10-DEV HEIGHTS DECEMBER 2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 R10-DEV HEIGHTS JUNE 2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 R10-DEV HEIGHTS SEPTEMBER 2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 R10-DEV HEIGHTS DECEMBER 2025.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3 R10-DEV HEIGHTS JUNE 2025.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3 R10-DEV HEIGHTS SEPTEMBER 2025.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3 R10-DEV HEIGHTS DECEMBER 2025.pdf20 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 R10.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 R10.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 R10.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold R10.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_SEP-24.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_DEC-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_SEP-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_DEC-24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_SEP-24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_DEC-24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 R-10 Dev Hights_Sep-2024.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 R-10 Dev Heights_Dec-2024.pdf22 Jan 2025
Other - TechnicalFile: CC MAIL.pdf13 Jul 2024
Details of encumbrances concerned to FinanceFile: ENCUM_LEGAL_R10.pdf11 Jul 2024
Details of encumbrances concerned to LegalFile: ENCUM_LEGAL_R10.pdf11 Jul 2024
CERSAI detailsFile: Cersai Declaration_R10V1.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner Jul 11, 2024 3-10 PM_compressed.pdf11 Jul 2024
Other - TechnicalFile: 1 Other - Technical (10).pdf11 Jul 2024
Proforma of Agreement for saleFile: ATS-R 10 DEV HEIGHTS.pdf28 Jun 2024
Other - TechnicalFile: annexure-A.pdf28 Jun 2024
Layout approvalFile: E SANCTION R10 PDF-1.pdf27 Jun 2024
Building plan approvalFile: E SANCTION R10 PDF-1.pdf27 Jun 2024
Building plan approvalFile: E SANCTION R10 PDF-2.pdf27 Jun 2024
Copy of the legal title reportFile: RERA Search Report- R10, Laxmi Nagar (1).pdf27 Jun 2024
Details of encumbrances concerned to FinanceFile: ENCUM_LEGAL_R10.pdf27 Jun 2024
Details of encumbrances concerned to LegalFile: ENCUM_LEGAL_R10.pdf27 Jun 2024
Copy of Layout Approval (in case of layout)File: E SANCTION R10 PDF-1.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: E SANCTION R10 PDF-1.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: E SANCTION R10 PDF-2.pdf27 Jun 2024
Declaration about Commencement CertificateFile: form d (2)_R10.pdf27 Jun 2024
Declaration in FORM BFile: Form B Affidavit_page-0001 (4).pdf27 Jun 2024
Declaration in FORM BFile: Form B Owners MAIN.pdf27 Jun 2024
Proforma of Allotment letterFile: -Allotment_Letter-R10.pdf27 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Disclosure_Prepared.pdf27 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - ALLOTMENT LETTER _R10 Dev Hieghts.pdf27 Jun 2024
Deviation Report with respect to model copy of AgreementFile: ATS DEVIATION REPORT -R10.pdf27 Jun 2024
Other - LegalFile: Power of Attorney R10 Dev Heights_compressed.pdf27 Jun 2024
Other - FinanceFile: Power of Attorney R10 Dev Heights_compressed.pdf27 Jun 2024
Other - LegalFile: Agreement of Redevelopment R10 Dev Heights-1-43_compressed.pdf26 Jun 2024
Other - LegalFile: Agreement of Redevelopment R10 Dev Heights-44-88_compressed.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration - Dev Jaiswal.pdf25 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration - Land Owner.pdf25 Jun 2024
PAN CardFile: 1 PAN Card (9).pdf19 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: E PERMIT R10 PDF.pdf19 Jun 2024

How this compares with Nagpur

12%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep R10-DEV HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ajani2,800+ in Nagpur

2 kmR10-DEV HEIGHTSCompleted 22Lapsed / revoked 11Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: DEOVRAT JAISWAL

DEOVRAT JAISWAL has 5 registrations on MahaRERA, including R-17 DEV HEIGHTS and 28-DEV HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if R10-DEV HEIGHTS is delayed beyond 15 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of R10-DEV HEIGHTS?

The registered promoter entity is DEOVRAT JAISWAL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in R10-DEV HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against R10-DEV HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for R10-DEV HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at R10-DEV HEIGHTS?

The professionals named in the filing: Architect: AR LOKESH KADU; Engineer: PRASHANT UPASANI; Chartered Accountant: CA ANKIT TALREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in R10-DEV HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About R10-DEV HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save R10-DEV HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.