Home / Browse projects / Satara, Maharashtra / PRUTHVI RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

PRUTHVI RESIDENCY

By RENOVISION CONSTRUCTION

RG-MH-13140 · RERA P52700022170 · Last updated on MahaRERA portal: 20 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
6 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

PRUTHVI RESIDENCY is a Residential / Group Housing project by RENOVISION CONSTRUCTION in Satara, Maharashtra, registered with MahaRERA as P52700022170 on 4 Sep 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 11 of the 17 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRUTHVI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SATARA DEGAON ROAD
    • KODOLI
    • Kodoli (CT)
    • Satara
    • 415004
  • Pincode415004
  • RERA no.P52700022170
  • ReraGenie IDRG-MH-13140

Builder

  • NameRENOVISION CONSTRUCTION
  • Entity typePartnership
  • PartnersVISHAL SAMBHAJIRAO KADAM, VIKRAM GANPATRAO BARGE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredSep 2019PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Sep 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed32 files

Current status

65%11 of 17 units booked

Figures as on 20 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRUTHVI RESIDENCYNA5317017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

PRUTHVI RESIDENCY: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area539 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2025
LandownerVillageDistrict
CHAKRASH BUILDERS AND DEVELOPERSKodoli (CT)Satara
MRS SONAL PRAVIN SAWANTKodoli (CT)Satara
MRS MAYURA SHARAD SHINDEKodoli (CT)Satara

Approvals and building plan

Sanctioning authorityCollector Office Satara
Permissible FSI646.8
Proposed, not sanctioned647 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSADAR BAZAR SATARA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMOHASIN K BAGAWAN
EngineerSURAJ RAVINDRA PARAMANE
Chartered AccountantANAND V SHAHA AND ASSOCIATES
PartnerRole in project
RENOVISION CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3.PDF20 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD.PDF20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH DEC 24.PDF15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG DEC 24.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM NO 2A 19-20.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM NO 2A 20-21.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 5 21-22.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM NO 2A 21-22.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM NO 2A 22-23.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM NO 5 22-23.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM NO 2A 23-24.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM NO 5 23-24.PDF15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PRUTHVI CA 3.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.PDF7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.PDF7 Jan 2022
Status of ConveyanceFile: INDEX 2 F2.pdf8 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: ADESH 1.pdf29 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: ADESH 2.pdf29 Aug 2019
Layout approvalFile: layout.pdf26 Aug 2019
Building plan approvalFile: drawing.pdf26 Aug 2019
PAN CardFile: pan card.pdf26 Aug 2019
Copy of the legal title reportFile: SERCH.pdf26 Aug 2019
Details of encumbrancesFile: ENNCUM.pdf26 Aug 2019
Copy of Layout Approval (in case of layout)File: layout.pdf26 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: drawing.pdf26 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: ADESH 1.pdf26 Aug 2019
Declaration in FORM BFile: SCH B.pdf26 Aug 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf26 Aug 2019
Proforma of Allotment letterFile: AGGRIMENT.pdf26 Aug 2019

How this compares with Satara

65%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep PRUTHVI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KODOLI1,100+ in Satara

Builder: RENOVISION CONSTRUCTION

RENOVISION CONSTRUCTION has 2 registrations on MahaRERA, including ASHOK VIHAR and PRUTHVI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that PRUTHVI RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRUTHVI RESIDENCY is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRUTHVI RESIDENCY?

The registered promoter entity is RENOVISION CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRUTHVI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRUTHVI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRUTHVI RESIDENCY?

The professionals named in the filing: Architect: MOHASIN K BAGAWAN; Engineer: SURAJ RAVINDRA PARAMANE; Chartered Accountant: ANAND V SHAHA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRUTHVI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRUTHVI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRUTHVI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.